|
---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML20206N2621999-05-11011 May 1999 Application for Amend to License DPR-6 to Delete from Defueled Ts,Subsection 1.16,change Definition of Site & Other Associated Editorial Changes ML20217F5191998-03-28028 March 1998 Application for Amend to License DPR-6,per 10CFR50.90 Re Security Plan.Encl Withheld ML20138G1961997-04-30030 April 1997 Application for Amend to License DPR-6,requesting Name Change from Consumers Power Company to Consumers Energy Company, to Reflect Broader Scope of Energy Resources Available Through Company ML20138A9061997-04-22022 April 1997 Application for Amend to License DPR-6,requesting Change to TS to Withdraw Petition to Implement Option B Performance Based Requirements to App J of 10CFR50 ML20134H6281996-11-0707 November 1996 Application for Amend to License DPR-6,adding New Air Compressor to Svc Air Segment of Svc & Instrument Air Sys ML20129C4611996-10-15015 October 1996 Application for Amend to License DPR-3,implementing Option B to Allow Use of Type a Test (Containment) Type B Test (Pneumatic Tests to Detect & Measure Local Leakage Rates Across Pressure Retaining Boundaries) & Type C Test ML20056G3811993-08-24024 August 1993 Application for Amend to License DPR-6,revising 930719 Original Change,Reflects Revision to 10CFR50.36(a)(2) Re Changing Reporting Requirement for Effluent Releases from Semiannual to Annual ML20046D1661993-08-0606 August 1993 Application for Amend to License DPR-6,revising TS to Change Superintendent Titles to Manager ML20045C7341993-06-11011 June 1993 Application for Amend to License DPR-6,revising TS to Add ECCS Acceptance Criteria for Eletric & Diesel Fire Pumps & Remove Portion of Fire Protection Requirements,In follow-up to NOV & Unresolved Item Noted in Insp Rept 50-155/92-06 ML20128D7081993-01-29029 January 1993 Application for Amend to License DPR-6,revising TS to Reflect Administrative Changes in Engineering,Offsite Review & QA Organization ML20059A2091990-08-14014 August 1990 Application for Amend to License DPR-6,reflecting Administrative & Organizational Changes ML20005G1071990-01-10010 January 1990 Application for Amend to License DPR-6,changing Tech Spec Pressure Temp Limits to Satisfy Fracture Toughness Requirements of Section V of 10CFR50.App G,Per Generic Ltr 88-11 ML20011D2941989-12-21021 December 1989 Application for Amend to License DPR-6,correcting Editorial Errors in Section 7.3.2(e) Re Use of source-range Monitors for Critical Approaches ML20247L0891989-05-25025 May 1989 Application for Amend to License DPR-6,to Align Specs to 10CFR50,App J Requirements That Permit Removal of 24 H Duration Restriction on Integrated Leak Rate Test ML20205P6231988-10-24024 October 1988 Application for Amend to License DPR-6,deleting Tech Spec Requirements to Calibr Portable Gamma & Neutron dose-rate Measuring Instruments at Least Once Every 3 Months & Instead Follow ANSI N323-1978 ML20154S6371988-09-22022 September 1988 Application for Amend to License DPR-6,allowing Independent Review & Audit Functions by Independent Organizational Unit Rather than Standing Committee.Changes Consistent W/Bwr STS, ANSI N18.7-1976 & ANS 3.1-1987.Fee Paid ML20154P2111988-09-21021 September 1988 Application for Amend to License DPR-6,revising Tech Specs to Provide Clarification & Consistency by Reflecting Administrative & Editorial Corrections.Fee Paid ML20154D4761988-09-0808 September 1988 Application for Amend to License DPR-6,proposing Removal of Organization Charts from Tech Specs & Informing NRC of Onsite Organizational Changes.Fee Paid ML20150C7831988-07-0505 July 1988 Application for Amend to License DPR-6,changing Tech Specs Re Reactor Depressurization Sys (Rds) Surveillance Testing, Eliminating Quarterly Partial Stroke Exercising of Rds Depressurizing Valves ML20148H6271988-03-22022 March 1988 Application for Amend to License DPR-6,changing Tech Specs Re Frequency of Reactor Depressurization Sys Depressurizing Valve Testing ML20237B9661987-12-14014 December 1987 Application for Amend to License DPR-6,removing Numerical Designator from I-type Fuel for Fuel Operating Cycle.Fee Paid ML20236N5021987-11-0909 November 1987 Application for Amend to License DPR-6,changing Tech Specs Administratively to Reflect Features & Terminology Used W/ New out-of-core Power Range Nuclear Instrumentation ML20236B3221987-07-23023 July 1987 Application for Amend to License DPR-6,consisting of Accumulated Administrative Changes ML20210C5961987-02-0404 February 1987 Application for Amend to License DPR-6,changing Tech Spec Section 5.2.1.b by Adding Table of Uncertainty Factors Associated W/Analysis of Core thermal-hydraulic Parameters Heat Flux,Maplhgr & Max Bundle Power ML20212F0301986-12-30030 December 1986 Application for Amend to License DPR-6,changing Tech Specs to Include Second Scram Dump Tank Vent & Drain Valve ML20207C9541986-12-22022 December 1986 Application to Amend License DPR-6,revising Tech Specs to Reduce Station Battery Design Time Interval from 8 to 2 H. Fee Paid ML20210E5141986-12-17017 December 1986 Application for Amend to License DPR-6,adding Operability & Surveillance Requirements for Alternate Shutdown Sys & Revising Tech Specs for Active Fire Barriers & Fire Detection Instrumentation for Auxiliary Shutdown Bldg ML20215F9941986-12-17017 December 1986 Application for Amend to License DPR-6,changing Tech Specs to Add Operability & Surveillance Requirements for Alternate Shutdown Sys Installed Per 10CFR50,App R & Generic Ltr 81-12.Request Supersedes 860421 Application ML20215C7211986-12-0505 December 1986 Application to Amend License DPR-6,revising Tech Specs to Reflect Use of New Hybrid Control Rods Mfg by Nucom,Inc & to Include Reload I-2 Fuel.Fee Paid ML20206M5081986-08-15015 August 1986 Application for Amend to License DPR-6,changing Tech Specs to Reflect Features & Terminology Used W/New out-of-core source-range Nuclear Instrumentation ML20203P8021986-05-0101 May 1986 Application for Amend to License DPR-6,revising Tech Specs to Ensure Consistency w/831230 Exemption from Requirement to Have Two Senior Reactor Operators on Shift ML20203F6461986-04-21021 April 1986 Application for Amend to License DPR-6,changing Tech Specs Re Alternate Shutdown Battery Sys Operability & Surveillance Requirements ML20154K0181986-03-0404 March 1986 Application for Amend to License DPR-6,changing Tech Specs by Adding Operability & Surveillance Requirements for Alternate Shutdown Sys Installed Per 10CFR50,App R ML20137V9621985-09-30030 September 1985 Application for Amend to License DPR-6,adding Operability & Surveillance Requirements for Components of Alternate Shutdown Sys Installed in Accordance w/10CFR50,App R ML20132F4561985-09-24024 September 1985 Revised Application for Amend to License DPR-6,changing I1 Fuel MAPLHGR Limits,Per 850816 Request,In Order to Implement Operating Limits for Reload Il Fuel ML20135B7971985-09-0303 September 1985 Application for Amend to License DPR-6,supplementing 741101 Proposed Tech Spec Change to Eliminate Min Control Rod Withdrawal Rate Limit ML20134E3011985-08-16016 August 1985 Application for Amend to License DPR-6,changing Tech Specs to Implement Reactor Operating Limits for Reload I1 Fuel ML20133M1131985-08-0505 August 1985 Application for Amend to License DPR-6,changing Tech Specs to Implement Staff Reorganization ML20132B7311985-07-19019 July 1985 Revised Application for Amend to License DPR-6,providing Tech Specs for Containment Pressure Monitor & Containment Water Level Monitor,Per NUREG-0737,Item II.F.1 ML20128B9131985-06-27027 June 1985 Application for Amend to License DPR-6,changing Tech Specs to Allow Operation of Plant Between Refueling Shutdowns W/O Potential of Requiring Surveillance Test to Be Performed.Fee Paid ML20126A0521985-06-0707 June 1985 Application for Amend to License DPR-6,incorporating Requirement to Adhere to Encl Plan for Big Rock Point Integrated Assessment. Fee Paid ML20128E4931985-05-24024 May 1985 Revised Application for Amend to License DPR-6,revising 840730 Tech Spec Change Request by Renumbering Definition Section 1.2.8 to 1.2.14 Re Administrative Controls ML20028A3151982-11-12012 November 1982 Application to Amend Licenses DPR-6 & DPR-20,changing Tech Specs Re Administrative Controls ML20058E3881982-07-20020 July 1982 Application to Amend License DPR-20,revising Tech Specs Re Safety Mgt Function ML20058E4011982-07-20020 July 1982 Application to Amend License DPR-6,changing Tech Specs Re Safety Mgt Function ML20054J7321982-06-25025 June 1982 Application to Amend License DPR-6,changing Tech Specs to Change Technical Advisor from Shift to 24-h on-call Schedule ML20041F3571982-03-10010 March 1982 Application for Amend to License DPR-6,providing Tech Specs for Containment Pressure Monitor & Containment Water Level Monitor,Required by NUREG-0737 Item II.F.1 ML20049H8171982-03-0101 March 1982 Tech Spec Change Request for Amend to License DPR-6.Change Resolves Discrepancies in Calibr of Control Rod Drive Room & Main Condenser Area Monitors Noted in IE Insp Rept 50-155/81-02 on 810401 ML20032A7721981-10-27027 October 1981 Application for Amend to License DPR-6.Change Provides Addl Surveillance Requirements for 2,400-volt Bus Undervoltage Trip Sys ML20010H3071981-09-18018 September 1981 Application for Amend to DPR-6,changing Tech Specs to Incorporate Revised 10CFR,App G Cooldown,Heatup & Hydrotest Limitations 1999-05-11
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20206N2621999-05-11011 May 1999 Application for Amend to License DPR-6 to Delete from Defueled Ts,Subsection 1.16,change Definition of Site & Other Associated Editorial Changes ML20198K6581998-12-24024 December 1998 Amend 120 to License DPR-6,changing License DPR-6 & App a, TS to Reflect Permanetly Shutdown & Defueled Status of Plant ML20217F5191998-03-28028 March 1998 Application for Amend to License DPR-6,per 10CFR50.90 Re Security Plan.Encl Withheld ML20141J8651997-08-14014 August 1997 Amend 119 to License DPR-6,revising Plant License & TS to Reflect Company Name Change from CPC to Consumers Energy Co ML20138G1961997-04-30030 April 1997 Application for Amend to License DPR-6,requesting Name Change from Consumers Power Company to Consumers Energy Company, to Reflect Broader Scope of Energy Resources Available Through Company ML20138A9061997-04-22022 April 1997 Application for Amend to License DPR-6,requesting Change to TS to Withdraw Petition to Implement Option B Performance Based Requirements to App J of 10CFR50 ML20137J9321997-04-0202 April 1997 Amend 118 to License DPR-6,revising TS 4.2.9,to Add Additional Air Compressor ML20134H6281996-11-0707 November 1996 Application for Amend to License DPR-6,adding New Air Compressor to Svc Air Segment of Svc & Instrument Air Sys ML20129C4611996-10-15015 October 1996 Application for Amend to License DPR-3,implementing Option B to Allow Use of Type a Test (Containment) Type B Test (Pneumatic Tests to Detect & Measure Local Leakage Rates Across Pressure Retaining Boundaries) & Type C Test ML20058A1511993-11-15015 November 1993 Amend 112 to License DPR-6,changing TS to Implement Reorganization of Plant Staff ML20057E1951993-10-0505 October 1993 Amend 111 to License DPR-6,changing Reporting Requirements for Effluent Releases from Semiannual to Annual ML20056G3811993-08-24024 August 1993 Application for Amend to License DPR-6,revising 930719 Original Change,Reflects Revision to 10CFR50.36(a)(2) Re Changing Reporting Requirement for Effluent Releases from Semiannual to Annual ML20056E1651993-08-16016 August 1993 Amend 110 to License DPR-6,clarifying TS Re Undervoltage Breakers in RPS ML20046D1661993-08-0606 August 1993 Application for Amend to License DPR-6,revising TS to Change Superintendent Titles to Manager ML20045C7341993-06-11011 June 1993 Application for Amend to License DPR-6,revising TS to Add ECCS Acceptance Criteria for Eletric & Diesel Fire Pumps & Remove Portion of Fire Protection Requirements,In follow-up to NOV & Unresolved Item Noted in Insp Rept 50-155/92-06 ML20044G4871993-05-24024 May 1993 Amend 170 to License DPR-6,revising Administrative Control Section to Reflect Restructuring of Nuclear Operations Dept ML20128D7081993-01-29029 January 1993 Application for Amend to License DPR-6,revising TS to Reflect Administrative Changes in Engineering,Offsite Review & QA Organization ML20059A2091990-08-14014 August 1990 Application for Amend to License DPR-6,reflecting Administrative & Organizational Changes ML20012E4251990-03-16016 March 1990 Amend 102 to License DPR-6,deleting Figures 6.2-1 & 6.2-2 & Indicating Where Figures Maintained Per Generic Ltr 88-06 & Correcting Typos ML20005G1071990-01-10010 January 1990 Application for Amend to License DPR-6,changing Tech Spec Pressure Temp Limits to Satisfy Fracture Toughness Requirements of Section V of 10CFR50.App G,Per Generic Ltr 88-11 ML20011D2941989-12-21021 December 1989 Application for Amend to License DPR-6,correcting Editorial Errors in Section 7.3.2(e) Re Use of source-range Monitors for Critical Approaches ML20246D2351989-08-16016 August 1989 Amend 100 to License DPR-6,revising Tech Specs to Provide for New Organizational Unit Entitled Nuclear Safety Svcs Dept to Discharge Offsite Safety Review Functions Instead of Nuclear Safety Board ML20245H8341989-07-28028 July 1989 Amend 98 to License DPR-6,requiring Compliance W/Amended Physical Security Plan ML20248C0571989-05-31031 May 1989 Amend 97 to License DPR-6,adding Operability & Surveillance Requirements for Alternate Shutdown Sys to Tech Spec Sections 11 & 12 & Including Tech Specs for Active Fire Barriers & Fire Detection Instrumentation ML20247L0891989-05-25025 May 1989 Application for Amend to License DPR-6,to Align Specs to 10CFR50,App J Requirements That Permit Removal of 24 H Duration Restriction on Integrated Leak Rate Test ML20246L8191989-05-0202 May 1989 Amend 96 to License DPR-6,revising OL to Allow for Increase in Amount of Byproduct Matl Plant May Possess & Use from 10.5 to 45 Ci Cs-137,as Sealed Sources ML20245F8251989-04-14014 April 1989 Amend 95 to License DPR-6,changing Tech Specs to Include Second Vent & Second Drain Valve to Scram Dump Tank ML20235J0231989-02-15015 February 1989 Amend 94 to License DPR-6,revising Station Battery Surveillance Test Time from 8 to 2 H ML20205S1241988-11-0404 November 1988 Amend 93 to License DPR-6,modifying Tech Specs by Replacing Requirements to partial-stroke Test Reactor Depressurization Sys Depressurizing Valves Quarterly W/Requirement to full- Stroke Test for Depressurizing Valves Each Outage ML20205P6231988-10-24024 October 1988 Application for Amend to License DPR-6,deleting Tech Spec Requirements to Calibr Portable Gamma & Neutron dose-rate Measuring Instruments at Least Once Every 3 Months & Instead Follow ANSI N323-1978 ML20154S6371988-09-22022 September 1988 Application for Amend to License DPR-6,allowing Independent Review & Audit Functions by Independent Organizational Unit Rather than Standing Committee.Changes Consistent W/Bwr STS, ANSI N18.7-1976 & ANS 3.1-1987.Fee Paid ML20154P2111988-09-21021 September 1988 Application for Amend to License DPR-6,revising Tech Specs to Provide Clarification & Consistency by Reflecting Administrative & Editorial Corrections.Fee Paid ML20154G1081988-09-14014 September 1988 Amend 92 to License DPR-6,modifying Paragraph 2.C.(5) of License Re Physical Security ML20154D4761988-09-0808 September 1988 Application for Amend to License DPR-6,proposing Removal of Organization Charts from Tech Specs & Informing NRC of Onsite Organizational Changes.Fee Paid ML20150C7831988-07-0505 July 1988 Application for Amend to License DPR-6,changing Tech Specs Re Reactor Depressurization Sys (Rds) Surveillance Testing, Eliminating Quarterly Partial Stroke Exercising of Rds Depressurizing Valves ML20154H5251988-05-17017 May 1988 Amend 90 to License DPR-6,allowing Inclusion of All Reloads of I Fuel Design in Tech Specs ML20154J1871988-05-17017 May 1988 Amend 91 to License DPR-6,changing Tech Specs to Reflect Features & Terminology Used W/New out-of-core Power Range Instrumentation ML20148H6271988-03-22022 March 1988 Application for Amend to License DPR-6,changing Tech Specs Re Frequency of Reactor Depressurization Sys Depressurizing Valve Testing ML20237B9661987-12-14014 December 1987 Application for Amend to License DPR-6,removing Numerical Designator from I-type Fuel for Fuel Operating Cycle.Fee Paid ML20236N5021987-11-0909 November 1987 Application for Amend to License DPR-6,changing Tech Specs Administratively to Reflect Features & Terminology Used W/ New out-of-core Power Range Nuclear Instrumentation ML20236B3221987-07-23023 July 1987 Application for Amend to License DPR-6,consisting of Accumulated Administrative Changes ML20211P1321987-02-19019 February 1987 Amend 89 to License DPR-6,revising Tech Spec Section 5.2.1.b to Add Table of Uncertainty Factors Re Analysis of Core Thermal Hydraulic Parameters for Reload I-2 Fuel & to Provide Footnotes Delineating Use of Values ML20211N5181987-02-17017 February 1987 Amend 88 to License DPR-6,revising Tech Spec Section 5.1 to Reflect Use of New Nucom,Inc Hybrid Control Rods in Cycle 22 Core ML20210C5961987-02-0404 February 1987 Application for Amend to License DPR-6,changing Tech Spec Section 5.2.1.b by Adding Table of Uncertainty Factors Associated W/Analysis of Core thermal-hydraulic Parameters Heat Flux,Maplhgr & Max Bundle Power ML20209H0481987-01-28028 January 1987 Amend 87 to License DPR-6,changing Tech Specs to Reflect Features & Terminology Used in Conjunction W/Installation of New source-range Monitoring Instrumentation ML20212F0301986-12-30030 December 1986 Application for Amend to License DPR-6,changing Tech Specs to Include Second Scram Dump Tank Vent & Drain Valve ML20207C9541986-12-22022 December 1986 Application to Amend License DPR-6,revising Tech Specs to Reduce Station Battery Design Time Interval from 8 to 2 H. Fee Paid ML20215F9941986-12-17017 December 1986 Application for Amend to License DPR-6,changing Tech Specs to Add Operability & Surveillance Requirements for Alternate Shutdown Sys Installed Per 10CFR50,App R & Generic Ltr 81-12.Request Supersedes 860421 Application ML20210E5141986-12-17017 December 1986 Application for Amend to License DPR-6,adding Operability & Surveillance Requirements for Alternate Shutdown Sys & Revising Tech Specs for Active Fire Barriers & Fire Detection Instrumentation for Auxiliary Shutdown Bldg ML20215C7211986-12-0505 December 1986 Application to Amend License DPR-6,revising Tech Specs to Reflect Use of New Hybrid Control Rods Mfg by Nucom,Inc & to Include Reload I-2 Fuel.Fee Paid 1999-05-11
[Table view] |
Text
--
4 e
v g.
CORSumBIS power x.,,,,
, w %
DVraer MM
. hcitar !Jcemog MMN1 Mi$$
. General otheos: IM6 West Pcmeli Road. Jackson, MI 49201 e (617) 7081636 I
i January 10, 1990 Nuclear Regulatory Commission Document Control' Desk Washington, DC 20555 j
DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT -
TECHNICAL SPECIFICATION CHANGE REQUEST - REACTOR TEMPERATURE LIMITS Attached is a request for change to the Big Rock Point Plant Technical
. Specifications,. This, change is requested to insure that the specifications for the Reacto. Vessel continue to satisfy the Fracture Toughness requirements of Section V of 10 CFR Part 50, sppendix G.
In compliance with the
-Schedular requirements of Generic Letter 88-11 dated July 12, 1988, and with consideration of the existing fluence effect on the Big Rock Point Reactor Vessel, Consumers Power Company is requesting a change to the Big Rock Point Technical Specification pressure-temperature limits, derived using the methodology contained in Revision 2 to Regulatory Guide 1.99.
Attachment I to this. letter contains the proposed Technical Specification page changes, contains the associated Technical Analysis.
f
. 'V&
Kenneth W Berry Director, Nuclear Licensing CC Administrator, Region III, USNRC NRC Resident Inspector - Big Rock Point Attachment 9001180139 900110 PDR ADOCK 05000155 P
PDC OC0190-0244-NLO4
$001 A C%f5 GVE7tGY COMPANY lil
r L h i
I 'p
'l t
CONSUMERS POWER COMPANY Docket 50-155 Request for Change to the Technical Specifications License DPR-6 For the reasons hereinafter set forth, it is requested that the Technical Specifications contained in the Facility Operations License DPR-6, Docket 50-155, issued to Consumers Tower Company on May 1, 1964, for the Big Rock Point be changed as described in Section I below:
1.
Changes A.
Change Section 4.1.l(i)4 to read as follows:
4 The reactor shall not be made critical, with the exception of physics testing, at temperatures below the criticality limit shown on Figures 4. l(b) and 4.l(c).
B.
Replace Figure 4-1(a) Hydrostatic Test Pressure / Temperature Limits, Figure 4-1(c) Heatup Pressure / Temperature Limits, and Figure 4-1(b)
Cooldown Pressure / Temperature Limits with the attached revised curves.
II.
Discussion The above proposed Technical Specification Change A is administrative in nature and is proposed to correct an editorial error. The proposed change uniquely identifies the two controlling Figures used to establish the lower limits of criticality.
The enclosed Attachment 2 provides the basis for Technical Specification Change B.
The limits specified by this change are being submitted to satisfy the requirements of 10 CFR 50 Appendix G by incorporating the methodology of Regulatory Guide 1.99 Revision 2.
III. Analysis of No Significant Hazards Consideration Proposed Change A is administrative in nature and provides clarification of existing requirements. It is not associated with any modification to plant equipment, systems, or components and does not change any existing administrative controls or operability limitations on existing equipment. The proposed change corrects an editorial deficiency inadvertently missed in a previous Technical Specification Change Request.
The proposed change, therefore, does not affect the probability or consequences of an accident previously evaluated. Because the proposed change does not involve any plant modifications, operability limits, or procedural controls, it does not create the possibility of a new or different kind of accident than previously evaluated nor involve a reduction in margin of safety. Consequently, the proposed change A does not involve a significant hazards consideration.
mil 289-0609A-BT01
[l' L
l j_
L The Big Rock Point Plant Review Committee has concluded that the proposed
?
Pressure / Temperature Limits, proposed by Change B, do not involve an unreviewed safety question. The margin above Nil Ductility. Transition Tem;Srature (NDTT) is governed by 10CFE50 Appendix G and remains unchanged. The predicted shifts in NDTT are based on a revised reference temperature consistent with Regulatory Guide 1.99 Rev 2.
The method of revising the new Pressure / Temperature Limits is the same as in the past
,[
(ASME Code Section III, Appendix G).
The proposed curves were generated for an 18 Effective Full Power Year exposure and are conservative until that time. Based on the above, the margin of safety has not changed.
Therefore, the operation of the facility in accordance with the above proposed Change B would not:
- 1) involve a significant increase in the i
probability or consequences of an accident previously evaluated; or
- 2) create the possibility of a new or different kind of accident from any accident previouwly evaluated; or 3) involve a significant reduction in the margin of safety.
IV.
Conclusion The Big Rock Point Plant Review Committee has reviewed this Technical Specification Change Request and has determined this change does not involve an.unreviewed safety question and, therefore, involves no significant hazards consideration. This change has been reviewed by the Nuclear Safety Services Department. A copy of this Technical Specification Change Request has been sent to the State of Michigan official designated to receive such Amendments to the Operating License.
CONSUMERS POWER COMPANY To the best of my knowledge, information and belief, the contents of this submittal are truthful and complete.
By d
David P Hoffman, Vic ident Nuclear Operations Sworn and subscribed to before me this 10th day of January 1990.
f(.4 Elaine E Buehrer, Notary Public J?ckson County, Michigan My commission expires October 11, 1993 M11289-0609A-BT01