ML20005F572
| ML20005F572 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 01/04/1990 |
| From: | Sands S Office of Nuclear Reactor Regulation |
| To: | Kovach T COMMONWEALTH EDISON CO. |
| References | |
| TASK-2.K.3.05, TASK-TM GL-85-12, TAC-64066, NUDOCS 9001160414 | |
| Download: ML20005F572 (3) | |
Text
..-
,A (y
January! 4,.1990 g,,
n p :. -
k %g "" <
. DISTRIBUT'ON A Sh,steuntoryle g'IENRC & Local PDRs l Docket Hos. 50-456-
' PD111:2 7/f1 LLuther
- and 50-457 JCraig;
_SSands
~OGC EJordan
< Thomas J. Kovach ACRS(10)
Gray File
~
Nuclear Licensing Manager Connonwealth Edison Company 4
OPUS-West III
+
_1400 OPUS; Place, Suite 300..
c Downers Grove, Illinois 60515'
- f.
Dear _Mr. Kovach:
SUBJECT:
REACTOR COOLANT: PUMP TRIP (GL 85-12) FOR BRAIDWOOD STAT 10H,-
UNITS 11AND 2 (TAC..NO 64066)
- For: the~ reactor coolant pump (RCP) trip' issue defined in TMI Action Plan Item
'II.K3.5-(Multiplant Action G-01), the NRC staff generically approved the WestinghouseOwnersGroup(WOG) methodology-inthe-GenericLetter;85-12.with-The NRC
> ?the. condition that plant-specific.information needed to be addressed.
- staff's review of the Braidwood plant-specific.information has-progressed to a
~
l degree that-we can conclude that the WOG methodology hasx significantly improvedi
-reactor' safety, and there:are no major safety-significant concerns for the-
, plant-specific information.
Verification that the RCP. trip criteria have-been incorporated in the Emergency _
? Operating Procedures (EOPs) and the date this was implemented by CECO'at
.BraidwoodLStation~is needed. Please provide-the E0P procedure number and the
, date of/ implementation at' your earliest convenience;-
Accordingly, we have comaleted our review of the Commonwealth Edison Company
.(CECO): plant-specificRC) trip setpoint' development for Braidwood Station, and find-it acceptable.- This issue may be the subject of'on-site verification.
.b Stephen P. Sands, Projects Manager Project Directorate III-2 Division of Reactor Projects - III, IV, V and Special Projects
- cr
See next page ON I
l
.DO
'PDIIIpdA PDIL1-2:PM PDIII-2:PD LL er SSands JCraig J/
1/3/90 1/4/90 a-DOCUMENT HAME:
[K0VACH7) 1 1160414 9oogo4 ADOCK 05000456 l
p_
_ PDC
--_.a-
Y;y ?NL V
[y,
.gjiyo.
g.j 'l <. (#f ' ' $-
NUCLEAR REGULATORY COMMISSION UNITED STATES t
c.
r,
/,1;
. [
WASHfNG TON, D. C. 20555 3
E
} $, %..
,o#
i January 4 1990 y4 P
D'ocket !!os. 50-456:
and 50-457-l Thomas J. Kovech, j
-Huclear-Licensing Manage _r ii
- 0 PUS West Ill
- l Connonwealth Edison: Company l1400 OPUS Place,~ Suite 300
-j 0
. Downers Grove, Illinois 60515
-t
Dear Mr. Kovech:
l i
+
1
.SUBJECTO REACTOP, COOLANT PUt1P TRIP (GL;85-12) FOR BRAIDWOOD STATION,-
UNITS 1 ANit2-(TAC. NO 64066)
['
For the: reactor!ccclantspump (RCP) trip issue defined in TMI Action Plan Item
)
ll.K3.5 (Multiplant Action G-01), the NRC staff generically approved the j
Westinghouse:0wners Group'(WOG) methodclogy in the Generic Letter 85-12, with-j the condition that'alant-specific information needed to be addressed. The NRC' j
l staff's review of tie Braidwood plant-specific informatiorchas progressed to a 1
degree.that we can conclude that the WOG methodology has significantly improved
)
reactor safety,~and there are no major. safety-significant concerns for the l
plant-specific information'.
.j
~
LVerification that the RCP trip criteria have been incorporated in the Emergency
-l Operating Procedures-(EOFs) and the date this was implemented by Ceco at 1
L Braidwood Station is needed.
Please provide the E0P procedure number and the j
date' of implerentation at your earliest convenience.
t o
[
'Accordingly, we have completed our review of the Commonwealth Ediscn Company l
l(Ceco) plant-specific RCP trip setpoint development for Braidwood Station, and i
. find it' acceptable. ' This issue may be the subject of on-site verification.
Stephe P. Sands, Projects Manager l
Project Directorate III-2 Division of Reactor Projects - III, 1
IV, v and Special Projects C.
See next page
/
1
,, y y x l'[ ~
N'
Mr.: Thomas J. 'kovach-Braidwood Station J Commonwtalth Edison Company
_ Units 1 and 2 o
p 3: cer:
.y.
Ms. Lorraine Creek L
Mr. Jack Tain'
~
Route 1, Box 182 E
' Atomic Power Distribution.
?
Westinghouse ' Electric Corporation Manteno, Illinois.60950 Post. Office Box 355 L
' Pittsburgh, Pennsylvania 15230 Douglass Cassel Esq.
4
. 109 N. Dearborn Street l[:
Joseph Gallo,'Esq.
Chicago,-Illinois-60602 s
L
'Hopkins and Sutter:
)
1050 Connecticut-Ave., N. W.
Mr. Charles D. Jones, Director
,y Suits-1250; Illinois Emergency: Services
?
' Washington, D.C. 20036-and Disaster Agency 110 East Adams Street-L Springfield, Illinois 62706 L
LC. Allen Bock, Esq.
Post Office, Box 342 (Urbar.a. Illinois 61801 Michael Miller, Esq.=
l Sidley and Austin L
Ms. Bridget Little Rorem One First National Plaza-t
'Appleseed Coordinator Chicago, Illinois 60603-o L
'117 North Linden Street L
Essex,LI111nois 60935 George-L. Edgar Newman & Holtringer, P.C.
- Mr.' Edward R. Crass 1615 L Street, N.W.
-Nuclear Safeguards and' Washington, D.C. 20036 Licensing Division' l'
Sargent 8 Lundy Engineers Attorney General 55 East Monroe Street 500 South 2nd Street
' Chicago. Illinois 60603 Springfield, Illinois 62701-U. S. Nuclear Regulatory C:ssnisW9 IIS Review Coordinator Resident Inspectors.0ffice EPA Region V Bracev111e, Illinois 60407 230 S. Dearborn Street Chicago, Illinois 60604 Regional Administrator, Region III U. S. Nuclear Regulatory Cossiission 799' Roosevelt Road, Bldg.'#4' Glen Ellyn, Illinois 60137.'
Chairman
'Wil1~ County Board of Su mrvisors
-Will County Board Court 1ouse Joliet,-Illinois 60434 I/
oy f
L j
.,,,.f
- -,