ML20005F264
| ML20005F264 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 12/26/1989 |
| From: | Faulkenberry B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Ray H SOUTHERN CALIFORNIA EDISON CO. |
| Shared Package | |
| ML20005F265 | List: |
| References | |
| NUDOCS 9001160104 | |
| Download: ML20005F264 (3) | |
See also: IR 05000206/1989031
Text
-
-
_ .
-- .
~-
a
- *t e
.
..:4.
UNITED STATES
[
NUCLEAR REGULATORY COMMISSION
'
'
E
REGION V
'
9
1460 MARIA LANE, SUITE 210
5,+,
WALNUT CRE E K, CALIFORNIA 94696
,
Docket No. 50-206
DEC 2 61989
Southern California Edison Company
'
Irvine Operations Center
-
23 Parker Street
-
Irvine, California 92718
-
-
Attention: Mr. Harold B. Ray, Vice President
Nuclear Engineering, Safety, and Licensing
'
Gentlemen:
,
This refers to the special inspection conducted by Mr. C. W. Caldwell of this
office on October 7 through November 22, 1989 of activities authorized by NRC
,
-
License No. DPR-13 and to the discussion of our findings held by Mr. Caldwell
,
.
with you and other members of the Southern California Edison staff at the
conclusion of the inspection.
,
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective examina-
'
tions of procedures and representative records, interviews with personnel, and
'
observations by the inspector.
l
Based on the results of this inspection, it appears that certain of your
activities were not conducted in full compliance with NRC requirements, as set
forth in the Notice of Violation, enclosed herewith as Appendix A.
In par-
I
ticular, as discussed with you during our management meeting on November 29,
'
l
1989, Southern California Edison Company (SCE) did not take adequate correc-
tive actions to preclude failure of the Automatic Switch Company (ASCO)
solenoid operator for charging isolation valve CV-304.
In addition, SCE did
l
not consider hot leg recirculation to be a Technical Specification (TS)
system. These findings emphasize the need for SCE to critically evaluate
I
programs to control problem equipment and to implement TS requirements.
Your response to the enclosed Notice is to be submitted in accordance with the
provisions of 10 CFR 2.201, as stated in Appendix A. Notice of Violation.
In
addition to addressing the specific violations cited, your response should
also address actions taken or to be taken to ensure proper attention in the
future to weaknesses in corrective action programs.
In accordance with 10 CFR 2.790(a), a copy of this letter, the enclosure, and
your response will be placed in the NRC Public Document Room.
The response directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
9001160104 891226
FDR
ADOCK 05000206
O
gg
9P /
. - -
-.
..
-
-.
.
- -
,
,
-
.
.
.
.,h,
'
-2
DEC 2 61989
,
Should you have any questions concerning this irspection, we will be pleased
to discuss them with you.
Sincerely.
B. H. Faulkenberry
Deputy Regional Administrator
Enclosures:
[
1.
Appendix A -- Notice of Violation
[
2.
Inspection Report No. 50-206/89-31
L
cc w/ Enclosures:
l'
D. -J. Fogarty, Executive Vice President
H. B. Bridenbecker, Vice President and Site Manager (San Clemente)
H. E. Morgan, Station Manager (San Clemente)
!
3
State of California
bec w/ copy of enclosures:
e
'
Docket File.
Project Inspector
Resident Inspector
G. Cook
B. Faulkenberry
J. Martin-
A.' Johnson
'
P. Johnson
,
?
R. Nease, NRR
'
y
.bcc w/ copy of enclosure 1:
M. Smith
'
~
N. Western
J. Zollicoffer
1
n'Y/dota h&
48
k{
,bh/'
aldwell
P e ,nson
SRichards
AChaffee
A Wnson
12/ /89
12/ ;/89
12/ /89
12R(/89
12/ /89
j
e
PEQUEST COPY
OV T COPY
DEST COPY
EST COPY
RE0 VEST
YES '/ NO
NO
'/ NO
/ NO
YES /
v
v
v
v
BFau.
nberrf
12/p/89
RE0 VEST COPY.]
YES' / NO
']
-
10 PDR J
f
YES / NO
]
'
,
I
1
a
-
n,-
-
-
,
,
.-.c.
,-
f b9;
,
.
,
6, n.;
-
r
, , .
t-
DEC 2 01989
4-
-2-
s
'
'
. Should you have any questions concerning this inspection, we will be pleased-
'
E
to discuss them with you.
Stacerely,
I
J. B. Martin
Regional Administrator
Enclosure:-
~
- 1. : Appendix A'-- Notice of Violation
2.
Inspection Report No. 50-206/89-31
cc w/ Enclosures:
D.J. Fogarty, Executive Vice President
H.- B.. Bridenbecker, Vice President and Site Manager (San Clemente)
.'
H. E. Morgan, Station Manager (San Clemente)
State of California
-
bec w/ copy of enclosures:
Docket File
-Project Inspector
Resident' Inspector
G. Cook-
B.cFaulkenberry
J.' Martin
A.. Johnson-
<P. Johnson
R..Nease,'NRR
bec w/ copy of enclosure 1:
M. Smith
N. Western
J. Zo111 coffer
'
,
. REGION V. [ PJohnson
Y
\\
CCaldwell
SRichards
AChaffee
Ado
n
12/g89
12/ $ 89
12/vt/89
12/ /89
12
89
/
R
/YES' (//pCOU ST C0PY J/E00%ST COPY J
ESTCOPYJRE0VESTCDPYJRE0VESICOPh]J
N0
](YES // N0
) ES / NO
] YES / NO
] YES /t NO
l
\\/
U
\\
J
nner an
JMartin
V
1
/9
12/ /89
RE
ST COPY J REQUEST COPY I
YS
N0
] YES / N0
)
/
'
n
,-
aERQ
YES
N0