ML20005F080
| ML20005F080 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 12/28/1989 |
| From: | Ronald Bellamy NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Corbin McNeil PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20005F081 | List: |
| References | |
| NUDOCS 9001120268 | |
| Download: ML20005F080 (2) | |
See also: IR 05000352/1989020
Text
'
c
.y
- .
.-
.
<
_
DEC 2 81989
,7'
a
Docket Nos. 50-352
License Nos. NPF-39
50-353
CPPR-107
f
Philadelphia Electric Company
ATTN: Mr. C. A. McNeill, Jr.
Executive Vice President- Nuclear
Correspondence Control Desk
'
Post Office Box 7520
Philadelphia, Pennsylvania 19101
Gentlemen:
Subject: Combined Inspection Report Nos.
50-352/89-20 and 50-353/89-29
A routine safety inspection of your annual emergency preparedness exercise was
conducted by Mr. C. Gordon of this office and other members of an NRC team on
November 21, 1989, at your Limerick Generating Station, Units 1 & 2, Sanatoga,
Discussions of our findings were held by Mr. Gordon with Mr.
Leitch and other members of your staff at the conclusion of the inspection.
-Areas examined during the inspection are described in the NRC Region 1
Inspection Report which is enclosed. Within these areas, the inspection
consisted of selective examination of procedures-and representative records,
interviews with personnel,. and observation of the emergency exercise by team
members.
Within the scope of this inspection, no violations were observed.
Philadelphia Electric Company's performance during the exercise demonstrated
the ability to implement the Emergency Plan and the Emergency Plan
Implementing Procedures in a manner that would provide adequate protective
. measures for the health and safety of the public.
No reply to this letter is required. Your cooperation with us in this matter
is appreciated.
Sincerely,
'
y n.
. .
y
. . /. L: a "I
Ronald R. Bellamy, Chief
Facilities Radiological Safety and
Safeguards Branch
Division of Radiation Safety
and Safeguards
Enclosure:
Region I Inspection Report Nos. 50-352/89-20 & 50-353/89-29
9001120268 89122s
DR
ADOCK 05000352
p. P
[g ~g gt y
PNU
7 q g,e
~......a...uw*
.
'
'.
'
+
,
,
.,
.
.
,
DEC 2 B 1989
Philadelphia Electric
2
Company
i
i
John / encl:
cc w
. S. Kemper, Sr., Senior Vice President - Nuclear Construction
E. C. Kistner, Chairman, Nuclear Review Board
G. M. Leitch Vice President - Limerick Generatirig Station
-t
S. J Kowalski, Vice President - Nuclear Engineering
D. R. Helwig,- General Manager - Nuclear Services
W. T. Ullrich Manager - Limerick Unit 2 Startu
M.J.McCormick,Jr., Manager-LimerickGenera[ingStation
A. S. MacAinsh M
G. A. Hunger,- dr.anager - Limerick Quality Division -
, Director - Licensing Section
T. B. Conner, Jr., Esquire
E. J. Bradle
H. D. Honan,y, Esquire, Assistant General Counsel
'
Branch Head - Nuclear Engineering Licensing
Public Docket Room (Room) (LPDR)
local Public Docket.
Nuclear Safety Information Center (NSIC)
NRC Resident Ins)ector
Commonwealth of )ennsylvania
bec w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
DRP Section Chief
!
L
l
I
(
orfon
wA>v
Conklin
La arus
Bellamy/89
12/J#89
12/20/89
12/p/89
12/t8'
Official
Record Copy