C' i
A OPU Nuclest ConMwsuon One Upper Pond Road 8r Parsippany, New Je'sey 07054 201316-70@D TELEX 136-482 Writer's Direct Dial Number:
January 3, 1990 C311-89-2136 4410-89-L-0129 U.S. Nuclear Regulatory Commission Attentions Document Control Desk Washington, D. C.
20555 Gentlemen Subject Three Mile Island Nuclear Station Unit 1 (TMI-1)
Three Mile Island Nuclear Station Unit 2 (TMI-2)
Oyster Creek Nuclear Generating Station (OC)
Operating License and Docket Nos DPR-50/ Docket 50-289 (TMI-1)
DPR-73/ Docket 50-320 (TMI-2)
DPR-16/ Docket 50-219 (OC) 10 CPR Part 26 Fitness-for-Duty Program certification GPU Nuclear Corporation (GPUN) has implemented a Fitness-for-Duty (FFD) program designed to meet the requirements of 10 CFR Part 26.
This corporate-wide FFD Program is applicable to all GPUN nuclear stations covered by the rule. GPUN's program, which is based on a program in place since November 1981, has been augmented with the additional provisions of 10 CFR Part 26 (most significantly random testing and awareness training) starting November 1, 1989.
Since o
L November 1, 1989, over 900 FFD tests have been conducted for the various l'
criteria of testing (e.g., 450 random and 450 pre-badging).
Since November, we have monitored the program carefully and have modified procedures, controls, and practices to address problems or needed l
clarifications. Recognizing the importance of this activity, GPUN commenced a detailed self assessment quality assurance audit of the FFD program and its implementation in early December prior to the effective date of the rule.
Preliminary results show that the general performance objectives of 10 CFR Part 26.10 have been satisfied. However, the self assessment quality assurance audit has identified the need to take certain additional actions.
These additional actions are currently being addressed and changes, where required, will be completed in accordance with existing corrective action i
procedures. Once this self assessment process is completed and corrective actions taken, GPUN has full confidence that all requirements will be satisfied. GPUN will inform the NRC of the status of these actions by March 1, 1990.
Therefore, in accordance with 10 CFR 26.73(d) and based upon the foregoing, GPUN certifies that it has implemented a Fitness for Duty program designed to moet the requirements of 10 CFR Part 26.
hl 9001120158 900103 3112136 PDR ADOCK 05000219 P
PDC I
\\
GPU Nuclear Corporation is a subsidiary of General Public Utikties Corporation
C P;ge 2 C311-89-2136 I
GPUN has adopted the cut-off levels and substances list set forth in 10 CFR Part 26 for drug and alcohol testing performed: 1) prior to granting unescorted l
access to protected areas; 2) for cause; 3) for follow-up to verify continued abstention; and, 4) for random testing. For drug and alcohol tests performed for the purpose of pre-employment screening, CPUN has more stringent cut-off levels for certain substances and three additional substances for which it tests beyond those set forth in Part 26.
r The CPUN more stringent requirements for pre-employment are specifically at follows:
L Substance initial Test (no/ml)
Confirmatory Test fno/ml)
Marijuana metabolites 50*
10*
Opiates 300 Morphine 200*
i Codeine 200*
Phencyclidine 25 20*
Barbiturates **
200 200 Benzodiazepine**
300 300 Methaqualone **
750
.750
- Denotes difference from Part 26
- Additional substance Very truly yours,
! f.
P. R. Clark President PRC/GG/cjg l
I' l
l 3112136 l
l-1
_y o
J;, -
l 1
'cds'Mr. W. T. Russell, Administrator l
1
[
Region I NRC l
Mr. J. Stols Director,' Project Directorate I-4 NRC i
Mr. A. Dromerick OC NRC Project Manager
{
Mr. R. Mernan
[.1 THI-1 NRC Project Manager i
Mr. M. Masnik 3
THI-2 NRC. Project Manager v'
\\