Forwards Special Augmented Insp Team Rept 50-456/89-30 on 891202-04.No Violations Noted
ML20005E243
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 12/28/1989
From: Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20005E244 List:
References
NUDOCS 9001040153
Download: ML20005E243 (2)


See also: IR 05000456/1989030

Text

7

-

-

-

-

.

,

.

,

i

W

'()CD

. ,y

,

.f 3

i

~

DEC2B129

j

j

'

l_

v;.

Docket.No. 50-456;

.

1 Commonwealth Edison Company

'

' ATTN:' Mr. Cordell. Reed

n

Senior Vice President

i

Post Office Box 767

.

Chicago, IL 60690

Gentlemen:

i

This refers.to the special onsite review conducted by the NRC Augmented

Inspection Team composed of Messrs. 'J. Hinds, T. Tongue, and J. Hopkins of-

this-office, Mr. S. Sands' of the Office of Nuclear Peactor Regulation (NRR),

and Mr.'S. Israel.of the Reactor Operations Analysis Branch of the Office for

.

1

Analysis'and Evaluation of-Operational Data (AE00), on December 2-4, 1989,'of

.'

the activities associated with the_ December 1,.1989, RHR Suction Relief

.

Valve event at the Braidwood Station, Unit 1, Operating License No. NPF-72,

and to the. discussion of our findings with Mr. R. E. Querto and others of

i

=your staff at the conclusion of the inspection.

O

The' enclosed copy of our Augmented Inspection Team report identifies . areas

examined during the inspection. Within these areas, the inspection consisted

of;a selective examination of procedures and representative records,

i

observations, and interviews with personnel.

.No violations of NRC requirements were identified during the course of this

I

inspection; however, the major purpose of the AIT was to perform onsite fact

'

finding regarding the event.

Issues identified by the AIT may be examined

for possible regulatory violations in subsequent inspections.

In accordance with 10 CFR 2.790 of the Connission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

'

'

Original signed by S. C. Grecr=an

hhC

hhyb

Edward G. Greenman, Director

'

D

O

.

PDC

Division of Reactor Projects

.

L

Enclosure: Augmented Inspection

Team Report No. 50-4ES/89030(DRP)

\\

-( , g

\\

See Attached Distribution

s

X

RII N c6

4a

}lps

1

AE0D

o

NRR A6

RIII,

III

RII

R

hL

WM

D DS (et

un h

WD$

'f71

l

l l

i

(Israel /ims

Sands

Hinds

Hopki ns

Cboper

Shafer

Gree man

.

-m

3

'<;G

C , g; : Nji

w&

.a

.-

r-

Commonwealth' Edison Company:

2 DEC 2 81999

n

,

I

'

i

Distribution

f

cc w/ enclosure:-

'

+

T..'J. Maiman, Vice President'

1

PWR Operations-

>

o

+

[;

T. Kovach, Nuclear

e'

Licensing Manager

,

t

i.

S. Hunsader, Nuclear.

~

L

Licensing; Administrator--

i

R.' E. Querio, Station Manager

-

"

D.' E.; Cooper, Regulatory

.- Assurance Supervisor

'

i

>

DCD/DCB (RIDS)J

Licensing Fee Management Branch

h

-Resident Inspector, RIII:

'

,

!

Braidwood':

. Resident Inspector, RIII Byron.

!

'

-

.

-Resident. Inspector, RIII Zion

.

.

D. W. Cassel, Jr., Esq. .

<

' Richard Hubbard-

J

W. McCaffrey,1 Chief, Public-

,

Utilities Division.

H. S. Taylor,-Quality Assurance

!

Division

E. Chan, OGC

LE. Reis, 0GCl

-

'

. Stephen P. Sands, NRR-

.F.- Miraglia, NRR_

,

D. Crutchfield, NRR'

,

G.-Holahan, NRR'

'

J.-Zwolinski, NRR

,

J.:Craig, NRR

s

W. Hodges,-NRR

C. Rossi,-NRR~

,

W. Lanning, NRR

E.LJordan,-AEOD

.T.

Novak,.AE0D

?J. Rosenthal, AE0D

W. Kane, RI

- L.- Reyes, RII

-S. J. Collins, RIV

'

R. Zimmerman, RV

H. Miller, RIII

,

,m

'.. '

m

.