Forwards Physical Security Insp Repts 50-277/89-24 & 50-278/89-24 on 891106-09.No Violations Noted
ML20005D928
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 12/14/1989
From: Ronald Bellamy
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Corbin McNeil
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20005D929 List:
References
NUDOCS 9001020277
Download: ML20005D928 (2)


See also: IR 05000277/1989024

Text

{{#Wiki_filter:- - ,

a

4 .. ' " De jgated 0.gi al ' .. p .

.

HflRb)1 s _1Df]U.

Namf] DEC 14 1989 c Docket Nos. 50-277 50-278 Philadelphia Electric Company , ATTN: Mr. C. A. McNeill Executive Vice President-Nuclear Correspondence Control Desk P. O. Box 7520 Philadelphia, Pennsylvania 19101 Gentlemen: Subject: Combined Inspection Nos. 50-277/89-24 and 50-278/89-24 This letter refers to the routine physical security inspection conducted by Mr. G. C. Smith of this office on November 6-9, 1989, of activities authorized by NRC License Nos. DPR-44 and DPR-56 at the Peach Bottom Atomic Power Station -(PBAPS), Delta, Pennsylvania and to the discussions of our findings held by Mr.' Smith with Mr. O. M. Smith, Vice President, PBAPS and members of his staff. Areas examined during this inspection are described in the NRC Region I Inspection Report which is enclosed with this letter. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector. Within the scope of this inspection, no violations were observed. A paragraph in the enclosed inspection report contains details of your security program that have been determined to be exempt from public disclosure in , accordance with 10 CFR 73.21 (Safeguards Information). Therefore, the section so identified will not be placed in the NRC Public Document Room and will , receive limited distribution. This letter and the remainder of the inspection report will be placed in the Public Document Room, in accordance with 10 CFR 2.790(a). No response to this letter is required. Your cooperation with us is appreciated. Sincerely, c dg b al Signed U T g mid R. ecua W Ronald R. Bellamy, Chief Facilities Radiological Safety and Safeguards Brar.ch Division of Radiation Safety and Safeguards /[[ 0FFICIAL RECORD COPY SG CIR PB 89-24/24 - 0001.0.0 12/05/89 9001020277 891214 I. PDR ADOCK 05000277 O PNV

. - ' .

. . , , Philadelphia Electric Company 2 DEC 141989 Enclosure: Combined NRC Region I Inspection Report Nos. 50-277/89-24 and ' S0-278/89-24 (Contains Safeguards Information (SGI) t in paragraph No. 6) cc w/ enc 1 (w/o SGI):

John S. Kemper, Sr., Senior Vice President-Nuclear J. W. Gallagher, Vice President, Nuclear Services E. C. Kistner, Chairman, Nuclear Review Board Dickir. son M. Smith, Vice President, Peach Bottom Atomic Power Station (w/SGI) Jack Urban, General Manager, Fuels Department, Delmarva Power & Light Co. John F. Franz, Plant Manager, Peach Bottom Atomic Power Station Troy B. Conner, Jr. , Esquire W. H. Hirst, Director, Joint Generation Projects Department, Atlantic Electric Bryan W. Gorman, Manager, External Affairs 4 Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report) Raymond L. Hovis, Esquire Thomas Magette, Power Plant Siting, Nuclear Evaluations Doris Poulsen, Secretary of Harford County Council J. D. McGoldrick, Manager, Claims Division, Legal Department , Raymond L. Hovis, Esquire + W. M. Alden, Director, Licensing Section Public Document Room (PDR) Local Public Document Room (LPDR) Nuclear Safety Information Center (NSIC) NRC Resident Inspector (w/SGI) Commonwealth of Pennsylvania bec w/ enc 1 (w/o SGI): Region I Docket Room (with concurrences) Management Assistant, DRMA (w/o encl) Section Chief, DRP R. Skelton, NRR (w/SGI) R. Martin, NRR B. Clayton, EDO PA0 - All Inspection Reports RI: S RI: S RI SS Sm ok K ig Bellamy 12//A./89 12//A/89 12M/89 0FFICIAL RECORD COPY SG CIR PB 89-24/24 - 0002.0.0 12/05/89 . }}