Notice of Deviation from Insp on 891012-1121.Deviation Noted:Unit 2 Emergency Closed Cooling Sys Unavailable to Provide Fuel Pool HX Cooling Water Prior to Unit 1 Refueling
ML20005D833
Person / Time
Site: Perry 
Issue date: 12/15/1989
From: Knop R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20005D832 List:
References
50-440-89-26, NUDOCS 9001020036
Download: ML20005D833 (1)


Text

-

,.1 4

NOTICE OF DEVIATION The Cleveland Electric Illuminating License No. NPF-58 Company The following deviation was identified during an inspection conducted on October 12 through November 21, 1989:

Perry Nuclear Power Plant Updated Safety Analysis Report, Revision 1, dated March 1989, Section 9.2.2.3 stated that the Unit 2 emergency closed cooling system is used as the Seismic Category I backup cooling water supply to the fuel pool heat exchangers.

Further it was stated that:

(1) "The Unit 2 emergency closed cooling system will be available to provide fuel pool heat exchanger cooling water prior to Unit I refueling;" and (2) "Any time after the start of emergency closed cooling system operation, cooling may be restored to the fuel pool heat exchangers by remote-manual action from the control room."

Contrary to the above- (1) the Unit 2 emergency closed cooling system was notavailabletoprovIdefuelpoolheatexchangercoolingwaterpriorto Unit I ref t. iing, and (2) the system cross-connect from Unit 1 emergency service wat<. (current Seismic Category I backup) was not capable of being placed in service by remote-manual action from the control room.

As identified in System Operating Instructions (501)-G41, " Fuel Pool Cooling and Cleanup System," Revision 6, dated December 30,1988, and S01-P45/49,

" Emergency Service Water and Screen Wash Systems," Revision 0, dated August 22, 1989, the method utilized to provide a backup Seismic Category I source of fuel pool heat exchanger cooling was expected to take 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to implement.

In addition, those instructions required the selected Unit 1 emergency service water loop to be drained in order to remove " blind flanges." Draining of the selected Unit I emergency service water loop would make that loop incapable of performing other intended safety functions.

Please provide in writing within 30 days of the date of this Notice:

(1) the reason for the deviation; (2) the corrective steps which have been taken and the results achieved; (3) the corrective steps which will be taken to avoid further deviations; and (4) the date when your corrective action will be completed.

Where good cause is shown, consideration will be given to extending the response time.

DEC 151o89 gCh Dated R. C. Knop, Chief Reactor Projects Branch 3 9001020036 091215 gDR ADOCKOSOOgO