s JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE
SUMMARY
OF OPERATIONS
/.UGUST, 1981 There were four (4) automatic shutdowns from Mode 1, one (1) automatic shutdovn from Mode 2 and one (1) power reduction in the month of August.
The following safety-related maintenance was performed in the month of August:
1.
Performed miscellaneous maintenance on diesel generators.
2.
Repacked #6 River Water Pump.
3.
Replaced agastat timer relay for "A" Train Service Water battery charger.
i 4
i i
810916000C 010910 PDR ADOCK 05000364
'R PDR
w OPERATING DATA REPORT DOCKET NO. 50-364 DATE 9/1/81 COMPLETED BY W.G.Ha Dston, III TELEPHONE 1205)399-5156 OPER ATING STATUS
- 1. Unit Name:
Joseph M. Farley - Unit 2 Notes: 1) Cumulative data
- 2. Reporting Period:
August, 1931 since 7/30/81, date of 2652 commercial operation.
1 Licen.<ed Thermal Power (MWir
- 4. Nameplate Rating (Gross Mhe);
860
- 5. Design Electrical Rating (Net MWet 829
- 6. Maximum Dependable Capacity (Gross MWe):
860*
- 7. Maximum Dependable Capacity (Net MWe):
829*
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A
- 9. Power LevelTo Which Restricted.lf Any(Net MWe): N/A
- 10. Reasons For Restrictions,if Any:
N/A v
This Month Yr. to-Date Cdntulatise
!I. Hours in Reporting Period 744 792 792
- 12. Number Of Hours Reactor Was Critical 720.7 768.7 768.7
- 13. Reactor Reserve Shutdown Hours 23.3 23.3 23.3
- 14. Hours Generator On-Line 713.6 761.6 761.6
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH)
- 1. 830,226.9 1,948,821.9 _ 1,948,821.9
- 17. Gross Electrical Energy Generated (MWH) 588,359 626,600 626,600
- 18. Net idectrical Energy Generated (MWH) 557,784 594,086 594,086 _
- 19. Unit Service Factor 9 5. 9__
96.2 96.2
- 20. Unit Availability Factor 95.9 96.2 96.2
- 21. Unit Capacity Factor iUsing MDC Net) 90.4 90.5 90.5
- 22. Unit Capacity Factor (Using DER Net) 90.4 90.5 90.5
- 23. Unit Forced Outage Rate 04.1 03.8 03.8
- 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date,and Duration of Each):
N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
- 26. Units in Te.t Status IPrior to Commercial Operation):
Forecast Achiesed INITIAL CRITICALITY 5/6/81 5/8/81
)
INITIAL ELECTRICITY 5/24/81 5/25/81 COMMERCIAL OPERATION 8/1/81 7/30/81
- The Nameplate Rating / Design Electrical Rating will be used for the Maximum Dependable Capacity unit an accurate value can be determined from operating experience..
(9/773
AVERAGE DAILY UNIT F0WER LEVEL
,/
s
,+
DOCKET NO.
sn_us N
UNIT 2
9/1/81 DATE
~.
COMPLETED BY W.
C.. Hairston,III (205)899-5156 I
17.LEPHONE 3!0NTil Aug tin t. 1981 4
DAY AYERAGE DAILY POWER LEVEL,
DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe-Net) 799 803 -
297 2
gg 806 3
751 19 806 4
785 20 811,
795 5
21 816 6
795 22 811~
7 796 800
,J 766 813 8
24 9
754 8II 25' 10 26 II 807 530 27 12 gnA
.,3 799 t
13 802 747 3
491 g
30 gg 777 802
- 33 16 9m INSTAUCDONS On this formst.!ist the aversge daily unit power levelin MWe. Net for each day in the reporting month. Compute to the neare
- t whole mepwatt.
~ ~ ~
.~
)
T t
l l
m UNIT SilulDOWNS AND POWER REDUCTIONS DOCKET NO. 50-364 U Nil' N A M E J.M.Farley-Unit 2 DATE,.2/1/81-HEPORT MON'lif August, 1981 COMPLETED BY W.G.llairston, III TELEPif0NE (205)899-5156 t
"E
,'5== =X Licensee c't.
c%
Cause & Corrective S
. = _e re 2
E t
s N," -
DJte k
5?
js5 Esent
- 7 83 Action to 53 5
j d5 j Report =
t$0 O
present Recurrence i-I 023 810602 F
12.0 A
3 N/A HB INSTRU Turbine Trip-Reactor Trip due to l,
false indication of MSIV 33693 closing. Limit switch repaired 024 810814 F
5.8 H
3 N/A HII XXXXXX Turbine Trip-Reactor Trip due to loss of SGFP 2B on low lube oil pressure while swapping strainers.
Adjusted flow orifice.
025 810814 F
0 A
4 N/A HH INSTRU Unit held at 450 Mwe chie to inability to latch SGFP 2A.
16C replaced a faulty relay in the seal-in trip circuit.
a 1
2 3
4 F: Forced Reason:
Method:
Exhibit G -Instructions S: Scheduled A. Equipment railure(Explain) 1 Manual far Picparation of Data B. Maintenance of Test 2-Manual Scram.
Entry Sheets tor Licensee C-Refueling 3 Aulumatic Scram.
Esent Report (LER) File INUREG-D-Regulatory Restriction 4-Other ( Explain) 0161)
E Operator Training & License Examination F-Administrathe 5
G-0;v: rational E ror (Explain)
Exhibit I Same Source P)/77) li-Other (Explain)
e, a
(/
d UNIT S! lull 10WNS AND POWElt !!EDUC tlob5 00CKEI No. 30-36/.
UNI l' N AM E {.J!. Fa r.2 Un3 2-DAIE -.9II 62 4
REPO R T.ilON ill *Au nus t u1981 COP,lPl.E X EI) !W.EddIMtsto.rlu1II 1
~IEIRilONE (205)899-5156 m
% w5 5
. =E
-s e
.,. 5 M l..:censec n
d *?,
Cause & forrecthe p"
N,o..
Date g
3g g
- y$
Esc-"
g Actinn so H
d"j 3.5:
Report a
'E 0 hO l'retent Heruriente g
o C
5 026 810327 F
4.2 G
3 N/A 11 8 ItiSTRU Turbine ' trip-Reactor Trip due to S/G 2A High fligh level.
Flow switch on MC3 was mispositioned during STP performnce resulting in an erroneous sign 11 to' the FRV's, i
,027 8_0829 F
4.4 A
3 N/A ilA INSIRU Turbine Trip-Reactor Trip due to S/G 2B Low Low level. DEil malfunction caused all Governor valves to close.
028 810830 F
4.0 G
3 N/A Hil
. IITE?,Cli Reactor Trip due to S/G 2B Low 7,ow level during startup.
l 2
3 a
l': Forced Reason.
Method:
EdiU it G. Inuenttiens N Scim!t led A l: quip.ncnt F.silure (Explain) 1 %nu il r. r,qurati..n of para li41aintenance of Test 2 M.inual Sce:nn.
1:ntn Mie n nir 1.icrince C Refueling 3.AutonrnicSerun.
Esedt Repoe 41.Ein file t NUREG-D-liegal,rer) Restriefinn 40lber ( E splah) 0161)
E Operator U ining & 3.icente Eumin.ition F-Administratne.
3 G Op ratienai Ernir (ExpLin)
Exhibii 1 -Same Source t'fl 17 )
II.O*her i Exphiin i e[l^
n I