. s JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS

/.UGUST, 1981 There were four (4) automatic shutdowns from Mode 1, one (1) automatic shutdovn from Mode 2 and one (1) power reduction in the month of August.

The following safety-related maintenance was performed in the month of August:

1. Performed miscellaneous maintenance on diesel generators.
2. Repacked #6 River Water Pump.
3. Replaced agastat timer relay for "A" Train Service Water battery charger.

i 4

i i

  • 810916000C 010910 PDR ADOCK 05000364

'R PDR

w OPERATING DATA REPORT DOCKET NO. 50-364 DATE 9/1/81 COMPLETED BY W.G.Ha Dston, III TELEPHONE 1205)399-5156 OPER ATING STATUS

1. Unit Name: Joseph M. Farley - Unit 2 Notes: 1) Cumulative data
2. Reporting Period: August, 1931 since 7/30/81, date of 1 Licen.<ed Thermal Power (MWir 2652 commercial operation.
4. Nameplate Rating (Gross Mhe); 860
5. Design Electrical Rating (Net MWet 829
6. Maximum Dependable Capacity (Gross MWe): 860*
7. Maximum Dependable Capacity (Net MWe): 829*
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A

9. Power LevelTo Which Restricted.lf Any(Net MWe): N/A
10. Reasons For Restrictions,if Any: N/A v This Month Yr. to-Date Cdntulatise

!I. Hours in Reporting Period 744 792 792

12. Number Of Hours Reactor Was Critical 720.7 768.7 768.7
13. Reactor Reserve Shutdown Hours 23.3 23.3 23.3
14. Hours Generator On-Line 713.6 761.6 761.6
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 1. 830,226.9 1,948,821.9 _ 1,948,821.9
17. Gross Electrical Energy Generated (MWH) 588,359 626,600 626,600
18. Net idectrical Energy Generated (MWH) 557,784 594,086 594,086 _
19. Unit Service Factor 9 5. 9__ 96.2 96.2
20. Unit Availability Factor 95.9 96.2 96.2
21. Unit Capacity Factor iUsing MDC Net) __

90.4 90.5 90.5

22. Unit Capacity Factor (Using DER Net) 90.4 90.5 90.5
23. Unit Forced Outage Rate 04.1 03.8 _

03.8

24. Shutdowns Scheduled Oser Next 6 Months (Type. Date,and Duration of Each):

N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
26. Units in Te.t Status IPrior to Commercial Operation): Forecast Achiesed INITIAL CRITICALITY 5/6/81 5/8/81

) INITIAL ELECTRICITY 5/24/81 5/25/81 COMMERCIAL OPERATION 8/1/81 7/30/81

  • The Nameplate Rating / Design Electrical Rating will be used for the Maximum Dependable Capacity unit an accurate value can be determined from operating experience..

(9/773 ,

AVERAGE DAILY UNIT F0WER LEVEL s

,+ .**'

,/

,. .,, DOCKET NO. sn_us N '

UNIT 2

.. DATE 9/1/81

~. . ;. : .

COMPLETED BY W. C.. Hairston,III

. I 17.LEPHONE (205)899-5156 3!0NTil Aug tin t . 1981 -

4 DAY AYERAGE DAILY POWER LEVEL , DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe-Net) 799 803 - .

2 _,

297 . gg 806 3 751 19 806 ,

4 785 -

20 811 , .

5 795 *-

816 21 6 795 22 811~ .-

7 796 ,J 800 766 813 8 24 9 754 8II '

. 25' 10 26 807 #

II 27 530 -

12 gnA 799 t

.,3 .

13 802 747 -

3 g 491 30 gg 777  ; 33 802 ,

16  ; 9m .

INSTAUCDONS On this formst.!ist the aversge daily unit power levelin MWe. Net for each day in the reporting month. Compute to the neare:t whole mepwatt.

~~~

.~

)

T l . . .

t l . .

_ __ _ __.. . _ _ _ _ _ _ _ _ _ _ _ _ . . . . . _ . _ . _ . . . _ . . . _ _ . _ __ m _ _ . __ _ . - .

DOCKET NO. 50-364 .,.

UNIT SilulDOWNS AND POWER REDUCTIONS U Nil' N A M E J.M.Farley-Unit 2 ,

'- DATE ,.2/1/81-  !

HEPORT MON'lif August, 1981 COMPLETED BY W.G.llairston, III '

TELEPif0NE (205)899-5156 t

. "E -

re S N," -

t .2 = _e E ,'5 ==s =X Licensee c't. c% Cause & Corrective DJte k 5? @ js5 Esent  ::; 7 83 Action to 53 5 j d5 j Report = t$0 O present Recurrence  ;!

, i-I 023 810602 F 12.0 A 3 N/A HB INSTRU Turbine Trip-Reactor Trip due to l, false indication of MSIV 33693 closing. Limit switch repaired 024 810814 F 5.8 H 3 N/A HII XXXXXX Turbine Trip-Reactor Trip due to loss of SGFP 2B on low lube oil pressure while swapping strainers.

Adjusted flow orifice.

025 810814 F 0 A 4 N/A HH INSTRU Unit held at 450 Mwe chie to inability to latch SGFP 2A. 16C replaced a faulty relay in the seal-in trip circuit.

a 1 2 3 4 F: Forced Reason: Method:

S: Scheduled Exhibit G -Instructions A. Equipment railure(Explain) 1 Manual far Picparation of Data B. Maintenance of Test 2-Manual Scram. Entry Sheets tor Licensee C-Refueling 3 Aulumatic Scram. Esent Report (LER) File INUREG-D-Regulatory Restriction 4-Other ( Explain) 0161)

E Operator Training & License Examination F-Administrathe 5  !

G-0;v: rational E ror (Explain) Exhibit I Same Source P)/77) li-Other (Explain)

< e, a

(/ d ,

UNIT S! lull 10WNS AND POWElt !!EDUC tlob5 00CKEI No. 30-36/. .

UNI l' N AM E {.J!. Fa r .2 Un3 2-4

, , DAIE -.9II 62 _

REPO R T .ilON ill *Au nus t u1981 COP,lPl.E X EI) !W .EddIMtsto.rlu1II

~IEIRilONE (205)899-5156 1 -

m

-s  % w5 ,. 5 N,o. . Date g

. =Ee 3g g

., . 5 M

y$

l..:censec Esc-"

n p"

d *?,

g Cause & forrecthe H

Actinn so d"j $ 3.5:g Report a 'E 0 hO l'retent Heruriente o

5 C

026 810327 F 4.2 G 3 N/A 11 8 ItiSTRU Turbine ' trip-Reactor Trip due to S/G 2A High fligh level. Flow switch on MC3 was mispositioned during STP performnce resulting in an erroneous sign 11 to' the FRV's, i

,027 8_0829 F 4.4 A 3 N/A ilA INSIRU Turbine Trip-Reactor Trip due to S/G 2B Low Low level. DEil malfunction caused all Governor valves to close.

028 810830 F 4.0 G 3 N/A Hil . IITE?,Cli Reactor Trip due to S/G 2B Low 7,ow level during startup.

l -

! 2 3 a l': Forced Reason. Method:

N Scim!t led EdiU it G. Inuenttiens A l: quip.ncnt F.silure (Explain) 1 %nu il r . r,qurati..n of para li41aintenance of Test 2 M.inual Sce:nn. 1:ntn Mie n nir 1.icrince C Refueling 3.AutonrnicSerun. Esedt Repoe 41.Ein file t NUREG-D-liegal,rer) Restriefinn 40lber ( E splah) 0161)

E Operator U ining & 3.icente Eumin.ition F-Administratne . 3 G Op ratienai Ernir (ExpLin) Exhibii 1 -Same Source

  • t'fl 17 ) II.O*her i Exphiin i e[l^

n I