ML20005B782
| ML20005B782 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 08/24/1981 |
| From: | Tedesco R Office of Nuclear Reactor Regulation |
| To: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML18036A167 | List: |
| References | |
| IEB-79-15, NUDOCS 8109020177 | |
| Download: ML20005B782 (3) | |
Text
.
A Dist.
. Docket:Fils bcc:
LB#1 Rdg TERA BJYoungblood NRC/PDR M 2 4 1991 DEisenhut L/PDR f1Rushbrook NSIC RLTedesco C s RMurley e,s(ACRS/[1 Docket Nos.:.50.445 RMattson s
M RHartfield, MPA
(~
. I!'!l I P \\-i and 50-446 d{jkff h #
WJohnston C
0 ELD Nr. R. J. bary 0IE (3) b l C 1931 > '8 Vice Presidtnt & General Panager SBurwell h
va ww men Id Tens utilities Generating Colpany g/
.,g. " "5 "
2001 Bryan Tower 9
Dallas, Texas 75201 j,
, 1; xt
Dear Ur. Gary:
Subject:
Long Tem Operability of Deep Draft Pumps IE Uulletin 79-15, dated July 11, 1979, was issued to all licensees and holders of construction permits is a result of deep draft pump deficiencies that were identified at facilities both operating and under construction.
In your response to the bulletin ynu identified deep draft pumps as being utilized at your facility. liovever, your response to the bulletin did not include enough infomation to demonstrate and assure the long tem operability of these pinps.
Enclosed is a document enti tied, " Guidelines for Demonstration of Operability of Deep Draft Puaos." Within 60 days from the issuance date of this letter, you should provide information on all the deep draft ptnps identified in your bulletin response and describe the extent to which your deep draf t ptnp long tern operability assurance program conforms to the various portions of these Guidelines. Emphasis should be placed on (1) the estab'ilshnent of installation procedures that aro followd each time these pumps are disassembled and reinstalled, and (c) the testing requirements and bearing ucar criteria.
The instruuentation called for in the Cuidelines s50uld not be considered a require 1ent.
These Cuidelines establish an acceptable nethod of assuring long tem l
operability of deep draf t pinps.
They do not necessarily constitute the only nethod for de,onstrating long term operability. The staff will review the infomation you surt to detemine whether your long tem operability assurance progrei for dee,. draft pinps is in sufficient confor.aance with l
these Guicelines to assure long tern operability.
If not, the staf f will deternine 9hether you have established and utilized other nethods and procedurcs, preferably with the assistance of the punp manufacturer, that also de1onstrate and assure that these pumps will perfom their intended function for the length of time required, l
8109020177 810824 PDR ADOCK 05000445 G
PDR l
omco suaswd om>
sac ronu aia tto-aoj nacre c24a OFFICIAL RECORD COPY usc. m n u - m + o
ny s'
Q j
i
! AUG 2 41981 1
1 If you have any questions regarding this natter, please contact the Licensing Project Manager.
4 Si ncerely, I
1
\\
\\
\\
l Robert L. Tedesco, Assistant Director for Licensing Division of Licensing Office of Nuclear Reactor Regulation i
}
Enclosure:
Guidelines for Demonstration of Operability of Deep Draft Pumps 4
cc w/ enclosure:
I See next page 1
1 l
4 1
1 i
i i
1 l
l 1
4 1
ndh omcr>DL:L,4,1 Bf
) DL %. ji U
RU/L i
4,/......
2, 54 s
$u"~^"'>,sB.u rwe.l.l./.y.s.
Y
,,RL,T, des,go_,,,
..BJ,7. ngb,,ood l
om,p 8/zo /81 8
/81 8/ /81 WRC FORM 318 tf 0,80l NRCM O240 OFFICIAL RECORD COPY
' " '
- 32 n 2.
i
+
Mr. R. J. Gary
- Executive Vice President and Ceneral Manager Texas Utilities Generating Company 2001 Bryan Tower Dallas, Texas 75201 cc: Nicholas S. Reynolds, Esq.
Mr. Richard L. Fouke Debeveise & Liberman Citizens for Fair Utility Regulation 1200 Seventeenth Street 1668-B Carter Drive Washington, D. C.
20036 Arlington, Texas 76010 Spencer C. Relyea, Esq.
Resident inspector / Comanche Peak Worsham, Forsythe & Sampels Nuclear Power Station 2001 Bryan' Tower c/o U. S. Nuclear Regulatory Commission Dallas, Texas 75201 P. O. Box 3B Glen Rose, Texas 76043 Mr. Homer C. Schmidt l
Manager - Nuclear Services
~
i Texas Utilities Services, Inc.
2001 bryan Tower Dallas, Texas 75201 Mr. H. R. Rock 2
Gibbs and Hill, Inc.
393 Seventh Avenue New York, New York 10001 Mr. A. T. Parker Westinghouse Electric Corporation P. O. Bux 355 Pittsburgh, Pennsylvania 15230 David J. Preister Assistant Attorney General Environmental Protection Division P. O. Box 12548, Capitol Station Austin, Texas 78711 Mrs. Juanita Ellis, President Citizens Association for Sound Energy 1426 South Polk Dallas, Texas
.75224 l
i
-