Summary of 810813 Meeting W/Util in Bethesda,Md Re Integrated Assessment Program for Facility.Plant Visit Tentatively Scheduled for Oct 1981.List of Attendees Encl
ML20005B742
Person / Time
Site: Oyster Creek
Issue date: 08/20/1981
From: Lombardo J
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
LSO5-81-08-040, LSO5-81-8-40, NUDOCS 8109020065
Download: ML20005B742 (4)


Text

_.

,,fo UNITED STATES e

g 8

NUCLEAR REGULATORY COMMISSION g

E WASHINGTON. D. C. 20555

,e\\

4,

,o f fp August 20, 1981

/ s'

,s Docket No. 50-219 d[

M I L.

LS05-81-08-040 g E c 3 7jggj,

( M ggtou T LICENSEE: Jersey Central Power & Light Company (JCP&L) 4 FACILITY: Oyster Creek Nuclear Generating Station

SUBJECT:

SUMMARY

OF MEETING HELD ON AUGUST 13, 1981, TO DISCUSS THE INTEGRATED ASSESSMENT PROGRAM FOR THE OYSTER CREEK NUCLEAR GENERATING STATION On August 13, 1981, the NRC staff met in Bethesda, Maryland, with representatives of JCP&L and their consultants. A list of attendees is provided as Enclosure 1.

The purpose of the meeting was to discuss (1) the conduct of the integrated assessment program including the type of licensee support required, (2) review the status of the SEP Topic submittals arm (3) discuss milestones and schedules.

The licensee was advised that the submittals provided to date which were identified as deficient would not"be returned; however, the licensee will be responsible for determining specific requirements and provide supplemental information as required.

It was pointed out that in areas where the staff has indicated that analysis is needed the licensee must perform the analysis or justify their position for not doing so. A great deal of the meeting was spent in discussion of the various topics. The reviewers provided information and clarification on a number of the existing problem areas to the licensee.

The matter of'the outstanding topic submittals which are due, but not yet received, were discussed. JCP&L advised us that the. schedule for delivery to the NRC will be.available the week.of August 17. JCP&L also advised us that'the9 will provide a representative to be located in Bethesda on a part time basis beginning in mid-September for approximately 6 weeks. The purpose of thiseffort is to provide technical input to the reviewers as required and expedite the reviee process by acting as iiason between the NRC and the utility.

A plant visit by the NRC integrated assessment team is tentatively scheduled for October 1981, but the date will be dependent on the progress of the overall

program, d

Jamas J. Lom rc[o, Project Manager eri. ting Reactors Branch #5

.y Division of Licensing

Enclosure:

DL: RB /#5/PM DL:0R C

omer >

Ly y p gggggg

/,w.

i.e...m m.o................

-o K/v 7f/81

[

b/u/81 e109020065 81os20

- - ~ ~

~ ~ - -

~~

DR ADOCK 05000 OFFICIAL RECORD COPY usam msm. eo

4 cc:

G. F. Trowbridge, Esquire Gene Fisher Shaw, Pittman, Potts and Trowbridge Bureau Chief 1800 M Street, N. W.

Bureau of Radiation Protection Washington, D. C.

20036 380 Scotts Road Trenton, New Jersey 08628 J. B. Lieberman, Esquire Berlack, Israels & Liebernen Commissioner 26 Broadway New Jersey Department of Energy New York, New York 10004 101 Commerce Street Newark, New Jersey 07102 Natural Resources Defense Council 91715th Street, N. W.

Licensing Supervisor Washington, D. C.

20006 Oyster Creek Nuclear Generating Station J. Knubel P. O. Box 388 BWR Licensing Manager Forked River, New Jersey 08731 GPU Nuclear 100 Interplace Parkway Resident Inspector Parsippany, New Jersey 07054 c/o V. S. NRC P. O. Box 445 Joseph W. Ferraro, Jr., Esquire Forked River, New Jersey 08731 Deputy Attorney General State of New Jersey Mr. I. R. Finfrock, Jr.

Department of Law and Public Safety Vice President - Generation 1100 Raymond Boulevard Oyster Creek Nuclear Generating Station Newark, New Jersey 07012 Post Office Box 388 Forked River, New Jersey 08731 Ocean County Library Brick Township Branch 401 Chambers Bridge Road Brick Town, New Jersey 08723 Mayor Lacey Township 818 West Lacey Road Forked River, New Jersey 08731 l

Commissioner Department of Public Utilities State of New Jersey 101 Commerce Street Ncwark, New Jersey 07102 U. S. Environmental Protection Agency Region II Office ATTN: Regional Radiation Representative 26 Federal Plaza j

New York, New York 10007 l

l

5 ENCLOSURE 1 LIST OF ATTENDEES NRC W. Russell C. Berlinger J. Lombardo R. Fell R. Scholl, Jr.

G. Cwalina E. McKenna D. Persinko T. Cheng N. Wagner D. Singh T. Loomis E. Marinos J. Laaksonen JCP&L J. Knubel Y. Nagai MPR W. Schmidt 0

'i

____.---_._.__-..___._.a

(

DISTRIBUTION FOR MEETING SUMMARIES Docket NRC PDR Local PDR TERA NSIC ORB #5 Readina J. Heltemes

~

N. Hughes G. Lainas D. Crutchfield H. Smith Project Manager - J. Lombardo C. W. Thayer (BWRs)

5. Showe (PWRs)

J. Olshinski W. Russell G. Cwalina S. Varga T. Ippolito R. A. Clark J. Stolz OELD Ol&E (3)

OSD E. Hughes ACRS (10)

Participants:

W. Russell C. Berlinger R. Fell R. Scholl G. Cwalina E. McKenna l

D. Persinko T. Cheng N. Wagner l

0. Singh T. Loomis E. MArinos J. Laaksonen J. Knubel, JCP&L i

Y. Nagai, JCP&L l

W. Schmidt, MPR l

i l

l l

l l