ML20005B736

From kanterella
Jump to navigation Jump to search
Notifies That Util Sept 1981 Implementation Schedule for Procedures & Training for Station Blackout Is Acceptable.Ie Will Review Procedures & Training Program During Future Insp
ML20005B736
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 08/18/1981
From: Stolz J
Office of Nuclear Reactor Regulation
To: Bauer E
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
GL-81-04, GL-81-4, NUDOCS 8109020058
Download: ML20005B736 (3)


Text

. -

b Gray File NRC PDR L PDR Dockets flos. 50-277/278 TERA NSIC ORB #4 Rdg 1

DEisenhut OELD fir. Edward G. Bauer, Jr.

Vice President and General Counsel IE-3 ACRS-10 Philadelphia Electric Company JStolz 2301 Market Street Philadelphia, Pennsylvania 19101 fiFairtile RIngram c. # e /S o n P.E : PEACH EDTTOM AT0511C STATI0tJ, Ut!ITS 2 AND 3

Dear Mr. Bauer:

We have revieve-I your response to generic letter 81-04 regarding emergency procedures and training for station blackout events. Our review was to confirm 4

that the subject procedures and training either currently exist or will be implemented on an acceptable schedule at your plants. Our review did not include an evaluation of the details provided in your response beyond i

that necessary to confirm the above.

You indicated that procedures and training for station blackout will be implemented at your plants by September, l. sol. We find this implementation schedule acceptable. The flRC's Office of Inspection and Enforcement will review the subject procedures and training program during a future plant inspection.

IYI

'SIG25D BY J01CiF. STOLTZ" j

John F. Stolz, Chief Operating Reactors Branch #4 1

Division of Licensing I

l

-~

I cc: See next page j.1 Py ~f b

DTm\\&

+

oma, fNB#4 ;DL,, 0, L,38[

C,-0RB #,4,: DL, l

B#

. nra..i.r.t.11.euf.. d. I..ss.n..

g..to.1.z 6.W.r

.u-o om,

..8o21.8.1.......... 8

81.....

8/.tW81......

- 8109026058 810818

.VL...

.. OFFICI AL R ECOR D COPY I NRs PDR ADOCK 05000277 USGN: 1981-349CO W.

((

A, UNITED STATES t,

NUCLE AR REGULATORY COMMISSION j

j WASHINGTON. D C. 20666 s

,/

August 18, 1981 Dockets Nos. 50-277/278 Mr. Edward G. Bauer, Jr.

Vice President and General Counsel Philadelphia Electr ic Company 2301 Market Street Philadelphia, Pennsylvania 19101 RE: PEACH BOTTOM ATOMIC STATION, UNITS 2 AND 3

Dear Mr. Bauer:

We have reviewed your response to generic letter 81-04 regarding emergency procedures and training for station blackout eventr. Our review was to confirm that the subject procedures and training either currently exist or will be implemented on an acceptable schedule at your plants. Our review did not include an evaluation of the details provided iri your response beyond that necessary to ccnfinn the above.

You indicated that procedures and training for station blackout will be implemented at your plants by September,1981. We find this implementation schedule acceptable. The NRC's Office of Inspection and Enforcement will review the subject procedures and training program during a future plant inspection.

Sincerely,

3. W p John F. Stolz, Chief Operating Reactors Branch #4 Division of Licen:9.g cc: See next page

Philadelphia Electric Company cc w/ enclosure (s):

Eugene J. Bradley Philadelphia Electric Company Regional Radiation Representative Assistant General Counsel EPA Region III 2301 Market Street Curtis Building (Sixth Floor)

Philadelphia, Pennsylvania 19101 6th and Walnut Streets Philadelphia, Pennsylvania 19106 Troy B. Conner, Jr.

1747 Pennsylvania Avenue, N.W.

M. J. Looney, Superintendent Washington, D. C.

20006 Generation Division - Nuclear Philadelphia Electric Company Raymond L. Hovis, Esq.

2301 Market Street 35 South Duke Street Philadelphia, Pennsylvania 19101 York, Pennsylvania 17401 Government Publications Section Warren K. Rich, Esq.

State Library of Pennsylvania Assistant Attorney General Education Building Department of Natural Resources Commonwealth and Walnut Streets Annapolis, Maryland 21401 Harrisburg, Pennsylvania 17126 Philadelphia Electric Company ATTN: Mr. W. T. Ullrich Peach Bottom Atomic Power Station Mr. R. A. Heiss, Coordinator Delta, Pennsylvania 17314 Pennsylvaria State Clearinghouse Governor's Office of State Planning Albert R. Steel, Chairman and Development Board of Supervisors P. O. Box 1323 Peach Bottom Township Harrisburg, Pennsylvania 17120 R. D. =l Delta, Pennsylvania 17314 Curt Cowgill U.S. Nuclear Regulatory Commission i

Office of Inspection and Enforcement Peach Bottom Atomic Power Station l

P. O. Box 399 Delta, Pennsylvania 171i4 l

t p

..,,,,,,._..-,,.,,.,,y

_,_,p,._,

,_.y

_~-_

,,.,nwa n,

___,