ML20005B670

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-416/81-14 on 810506-13.No Noncompliance Noted
ML20005B670
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 06/11/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stampley N
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML20005B671 List:
References
NUDOCS 8107080536
Download: ML20005B670 (2)


See also: IR 05000416/1981014

Text

.

,.

/

UNITED STATES

8

",

NUCLEAR REGULATORY COMMISSION

$

. . .

101 MARIETTA ST

N.W.. SUITE 3100

REGION 11

/[

g

ATLANTA, GEORGI A 30303

,a

g

/

+.. *

gs.

f4x

Api 111981

g(

' 'sk\\

-

x

4

WgyrM

Mississippi Power and Light Company

f/

0'I

ATTN: Mr. N. L. Sta.npley

'

ho.s.@g#gW

M

12

]cc

Vice President of Production

P. O. Box 1640

Jackson, MS 39205

f

Gentlemen:

I

Subject: Report No. 50-416/81-14

This refers to the routine safety inspection conducted by Mr. L. W. Garner of

this office on May 6-13, 1981, of activities authorized by NRC Construction

Permit No. CPPR-118 for the Grand Gulf facility and to the oiscussion of our

findings held with Mr. C. H. Hutchinson, Startup Manager, at the conclusion of

the inspection.

Areas examined during the inspection cnd our findings are discussed in the

enclosed inspection report.

Within the;e areas, tha inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from

disclosure under 10 CFR 9.5(a)(4), it is necessary that you:

(a) notify this

!

office by telephone within ten days from the date of this letter of your

intention to file a request for withholding; and (b) submit within twenty-five

days from the date of this letter a written application to this office to

l

withhold such information. If your receipt of this letter has been delayed such

that less than seven days are available for your review, please notify this

office promptly so that a new due date may be established.

Consistent with

section 2.790(b)(1), such application must be accompanied by an affidavit

executed by the owner of the information which identifies the document or part

thereof sought to be withheld, and a full statement of the reasons on the basis

of which it is claimed that the information should be withheld from public

disclosure.

This section further requires the statement to address with

l

specificity the considerations listed in 10 CFR 2.790(b)(4).

The information

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within the

specified periods noted above, the report will be placed in the Public Document

Room.

T6oI

s

/

f~"8107080536 810611

l PDR ADOCK

- 0

05000416

PDR

-= .. -

.

.-- . - - .

. . . - . = . -...-

.-.

..

-.

.

! '.:

Jai 1 e

,

~

,

.

b

!

Mississippi Power and Light Company.

2

'

,

$

.,

,

i

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

+

i

Sincerely,

>

f

i

i

l

f.c.)'e &

!.

R. C.

wis, Acting Director

Divisicn of Resident and

e

!

'

Reactor Project Inspection

Enclosure:

,

'nspection Report No. 50-416/81-14

i

!

!

l

cc w/ encl:

C. K. McCoy, Plant Manager

,

!r

I

i

!

I'

r

I

1

.

.

l

t

i

e

i

t'

i

I

L

r

!

.

l

t

i,. . -.. . . . . . _ . _ . .. . . _ . , _ _ . _ _ . . . . . _ ... _ _ _ ... _ .. _.

. _ , _ ._ _ ,..___ _ _ _ _

_ _ .

_