ML20005B534

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-461/81-14 on 810605-06.No Noncompliance Noted
ML20005B534
Person / Time
Site: Clinton Constellation icon.png
Issue date: 06/23/1981
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
Shared Package
ML20005B535 List:
References
NUDOCS 8107080343
Download: ML20005B534 (2)


See also: IR 05000461/1981014

Text

'

/

o,

UNITED STATES

,

g

,

g

NUCLEAR REGULATORY COMMISSION

O

c

REGION lli

g

/

790 ROOSEVELT ROAD

.

...../

GLEN ELLYN. ILLINOIS 60137

JUN 2 3 198I

gP

9h

.

0Oq bqY

Docket No. 50-461

iy

cj-

-

o'*

h

      • g o l p

Illinois Power Company

3

g

ATTN:

Mr. W. C. Gerstner

b

-

qM. (

Executive Vice Pa sident

500 South 27th Stro t

4

Decatur, IL 63u

Genti m n~:

This refers to the routine safety inspection conducted by Mr. I. T. Yin

of this office on June 5-6, 1981, of activities at the Clinton Power

Station, Unit 1, authorized by NRC Construction Permit No. CPPR-137 and

to the discussion of our findings with Mr. G. M. Brashear and others of

your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

Based on the resul's of our review and evaluation of your corrective actions

taken in response to our Immediate Acticn Letter dated March 5, 1981, and our

letter datet May 8, 1981, which forwarded Inspection Report No. 50-461/81-07,

we agreed that installation and inspection of large bore pipe supports and

pipe penetration assemblies could be resumed.

With respect to your ongoing

evaluation of the existing condition of installed pipe penetration assemblies,

we understand that you will provide this office by August 15, 1981, a report

on the tests, calculations and other corrective measures taken or to be taken

to conclude that the affected systems will function properly during plant

operation.

This report will also include any functional verification of the

pipe penetration assemblies that will be conducted during the startup and

testing program.

1Gol

s

///I

C 8107080343 810623

!'PDR ADOCK 05000461

i,,j G

PDR

_

_ . _ _ _ _

_ . _ .-

_ -

.

.

Illinois Power Company

-2-

  • fD 2.

-

1-

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Doctunent Room.

If this report contains any information that you or

your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within seven (7)

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this office to withhold such infor-

mation. Section 2.790(b)(1) requires that any such application must be

accompanied by an affidavit executed by the owner of the inforcation which

identifies the document or part sought to be withheld, and which contains a

full statement of the reasons on the basis which it is claimed that the in-

formation should be withheld from public disclosure. This section further

requires the statement to address with specificity the considerations listed

in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incor-

porated as far as possible into a separate part of the affidavit.

If we do

not hear from you in this regard within the specified periods noted above, a

copy of this letter and the enclosed inspection report will be placed in the

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

James G. Keppler

Director

Enclosure:

IE Inspection

Report. No. 50-461/81-14

cc w/ encl:

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Mary Jo Murray, Office of

Assistant Attorney General

Gary N. Wright, Deputy Director

Randall L. Plant, Prairie

Alliance

RIII

RIII

RyI ,

RI I

RIII

RIII

RIII

D

on

m nn

S i

I.[d

D is

K

pler

sa

,

fj/ p

f'./1- g /

4

I

6/18/81

4-

61:x23/

(f

/

,