Forwards IE Insp Rept 50-416/81-11 on 810505-08 & 27.No Noncompliance Noted
ML20005B531
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 06/09/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stampley N
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML20005B532 List:
References
NUDOCS 8107080340
Download: ML20005B531 (2)


See also: IR 05000416/1981011

Text

..

.

.

Mk

.

o,

UNITED STATES

..

P

  • f,

NUCLEAR REGULATORY COMMISSION

{.

g [E

REGION ll

o,

101 MARIETTA ST., N.W.. SUITE 3100

<-

ATLANTA. GEORGIA 30303

    • "

JUN 0 91981

[ceN./g'

Mississippi Power and Light Company

4,

J\\y

,

"

ATTN:

Mr. N. L. Stampley

Vice President of Production

6

$$y

P. O. Box 1640

9-

M g 't

'#

Jackson, MS 39205

C;,

o.s. M #

S#

A.

Gentlemen:

/,s

[,:

Subject: Report No. 50-416/81-11

]

'

This refers to the routine inspection conducted by Mr. L. D. Zajac of this office

on May 5-8, and May 27, 1981, of activities authorized by NRC Construction Per-

mit No. CPPR-118 for the Grand Gulf facility and to the discussion of our find-

ings held with Mr. G. B. Rogers, Jr. , Site Manager, at the conclusion of the

inspection at Grand Gulf site and with Mr. J. M. Kelly, QA Staff, at the conclu-

sion of the inspecticn at' the General Electric facility in Norcross, GA.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

Two new unresolved items resulted from this inspection and are discussed in the

enclosed report. These items will be examined during subsequent inspections.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from disclo-

sure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office by

telephone within ten days from the date of this letter of your intention to file

a request for withholding; and (b) submit within twenty-five days from the date

of this letter a written application to this office to withhold such information.

If your receipt of this letter has been delayed such that less than seven days

are available for your review, please notify this office promptly so that a new

due date may be established. Consistent with section 2.790(b)(1), such applica-

tion must be accompanied by an affidavit executed by the owner of the information

which identifies the document or part the eof sought to be withheld, and a full

statement of the reasons on the basis of which it is claimed that the information

should be withheld from public disclosure.

This section further requires the

statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4). The information sought to be withheld snall be incorporated as far

as possible into a separate part of the af fidavit. If we do not hear from you in

this regard within the specified periods noted above, tce report will be placed

in the Public Document Room.

M

S

70107080340 810609

!

'{DRADOCK 05000416

PDR

.

. - - , -

. . . - . .

.. - -_.

-

.--

. . . _

. . .

-

'

.

.

.

.

.

Mississippi Power and Light Comp:ny

2~

JLml 0 91981

.

'

Should you have any questions cor.cerning this letter, we will be glad to discuss

them with you.

Sincerely,

f. C.

.C.

ewis, Acting Director

Division of Resident and

Reactor Project Inspection

Enclosure:

Inspection Report No. 50-416/81-11

cc w/ encl:

C. K. McCoy, Plant Manager

.