ML20005B514

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-364/81-16 on 810507-09.No Noncompliance Noted
ML20005B514
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 07/10/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20005B515 List:
References
NUDOCS 8107080322
Download: ML20005B514 (2)


See also: IR 05000364/1981016

Text

)

.

w

%

pn aeg%

.

, ,

8

UNITED STATES

8'

NUCLEAR REGULATORY COMMISSION

,

n

{ *-

aE

REGION 11

o,

101 MARIETTA ST., N.W.. SUITE 3100

  • -

ATLANTA GEORGIA 30303

        • '

JU N 101881

m> ) , cs. ,< p.

Alabama Power Company

N'

\\\\h'

'

ATTN: Mr. R. P. Mcdonald

\\\\-

Vice President-Nuclear Generation

@

Tgg-

P. O. Box 2641

-

gO

Birmingham, AL 35291

(

gg$,,-

Gentiemen:

,'

,

Subject: Report No. 50-364/81-16

lT

This refers to the routine safety inspection conducted by Mr. H. L. Whitener of

this office on May 7-9, 1981, of activities authorized by NRC License No. NPF-8

for the Farley facility and to the discussion of our findings held with

~

Mr. K. McCracken, Technical Superintendent, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from disclo-

sure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office by

telephone within ten days from the date of this letter of your intention to file

a request for withholding; and (b) submit within twenty-five days from the date

of this letter a written application to this office to withhold such information.

If your receipt of this letter has been delayed such that less than seven days

are available for your review, please notify this office promptly so that a new

due date may be established. Consistent with section 2.790(b)(1), such applica-

tion must be accompanied by an affidavit executed by the owner of the information

which identifies the document or part thereof sought to be withheld, ana a full

statement of the reasons on the basis of which it is claimed that the information

should be withheld from public disclosure.

This section further requires the

statement to address with specificity the considerations listed in 10 CFR 2.790-

(b)(4).

The information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit. If we do not hear from you in

this regard within the specified periods noted above, the report will be placed

in the Public Document Room.

Iso /

s

}

@hePDR ADOCK

io70so322 810710

05000364

tjg

PDR

.-


'

f,

JUN 10 reg;

^

.

Alabama Power Company

2

i

Should you have any questions concerning this letter,ovce will be glad to discuss

them with you.

Sincerely,

'

[.C.

R. C. dewis, Acting Director

Division of Resident and

Reactor Project Inspection

-

Enclosure:

Inspection R_eport No. 50-364/81-16

1

cc w/ encl:

W. O. Whitt, Executive Vice President

H. 0. Thrash, Manager, Nuclear Generation

'F. L. Clayton, Jr. , Senior Vice President

W. C. Petty, Manager-Quality Assurance

(Design and Construction)

W. G. Hairston, III, Plant Manager

R. E. Hollands, Jr., QA Supervisor

0. .D. Kingsley, Jr. , Manager, Nuclear Engineering

,

and Technical Services

'

-;

I

,

!

[

}

-

=