Forwards IE Insp Rept 50-328/81-26 on 810406-09.No Noncompliance Noted
ML20005B496
Person / Time
Site: Sequoyah 
Issue date: 06/09/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20005B497 List:
References
NUDOCS 8107080298
Download: ML20005B496 (2)


See also: IR 05000328/1981026

Text

[#"%,k

UNITED STATES

,

NUCLEAR REGULATORY COMMISSION

.

g

REGION 11

L"

E

101 MARIETTA ST., N.W., SUITE 3100

    1. [

0,,

ATLANTA, G EORGt A 303C3

%,,

JUN O g ;gg,

.<

1 Mh

[sy\\\\

'

Tennessee Valley Authority

/[

e{ J

/

Attn:

H. G. Parris

Qi

%

Manager of Power

$ l,-

ggr

_.

gL d,

500A Chestnut Street Tower II

i

p2

Chattanooga, TN

37401

j

, ,.g8

Gentlemen:

</

"' #

Subject:

Report No. 50-328/81-26

This refers to the routine safety inspection conducted by Mr. H. L. Whitener

of this office on April 6-9, 1981, of activities authorized by NRC Construction

Permit No. CPPR-73 for the Sequoyah Nuclear Power Plant, and to the discussion

of our findings held with Mr. James McGriff, Assistant Plant Superintendent, at

the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790 of the Conmission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any informatian that you believe to be exernpt from

discleaare under 10 CFR 9.5(a)(4), it is necessary that you:

(a) notify this

office by telephone within ten days from the date of this letter of your

intention to file a request for withholding; and (b) submit within twenty-five

days from the date of this letter a written application to this office to

.'

withhold such infonnation.

If your receipt of this letter has been delayed such

that less tnan seven days are available for yeur review, please notify tnis

office promptly so that a new due date may be established.

Consistent with

Section 2.790(b)(1), such application must be accompanied by an affidavit

executed by the owner of the information which identifies the document or part

thereof sought to be widheld, and a full statement of the reasons on the basis

of which it is claimed that the information should be withheld from public

disclosure. This section furtner requires the statement to address with

specificity the consideratior.s listed in 10 CFR 2.790(b)(4).

The information

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within the

specified periods noted above, the report will be ? laced in the Public Document

. Room.

3g,oI

s

0 0107080298 810609

fPDRADOCK 05000328

QO

PDR

.

. _ . . _

__.

- --

Z ..

__.

___ _ . __

.

.

.

'

' '

JUN 0 91981

,

Tennessee Valley Authority

2-

-

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

~

E.c.

R. C.

u, Acting Director

Division of Resident and Reactor

Project Inspection

Enclosure:

Inspection Report No. 50-328/81-26

cc w/ encl:

H. J. Green, Division Director

G. G. Stack, Project Manager

J. M. Ballentine, Plant Superintendent

J. F. Cox, Supervisor, Nuclear

Licensing Section

M. J. Burzynski, Project Engineer

H. N. Culver, Chief, Nuclear Safety

Review Staff

,

, , , . .

.-~,m

- - + - . - - _ -

, ,

_,,-v

v

, ,.+, , - . , . - , , , - - ,

, . . . - , , . - - - -

y-

,.-- - , . -,-,,,r.

e,-,

- - , .

.-.-.y.,-,._.n,-.-

.y---,

,