l
/
%
UNITED STATES
!'
NUCLEAR REGULATORY COMMISSION
o
N
- E
REGION til
,
k
799 ROOSEVELT ROAD
g . . . . . p#
GLEN ELLYN,ILUNOIS 6om
June 17, 1981
.
-
Docket No. 50-266
Docket No. 50-301
Wisconsin Electric Power Company
ATTN:
Mr. Sol Burstein
Executive Vice President
Power Plants
231 West Michigan
Milwaukee, WI 53201
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. W. G. Guldemond
and R. L. Hague of this office on May 1-29, 1981, of activities at Point Beach
Nuclear Plant, Units 1 aad 2, authorized by NRC Operating Licenses No. DPR-24
and No. DPR-27 and to the discussion of our findings with Mr. G. A. Reed at the
conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
_
interviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in enclosed Appendix A.
A
written response, submitted under oath or affirmation, is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will ba placed
in the NRC's Public Document Rocm.
If the enclosures contain any information
that you or your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone
within seven (7) days from the date of this letter of your intention to file
a request for withholding; and (b) submit within twenty-five (25) days from
the date of this letter a written application to this office to withhold such
information.
Section 2.790(b)(1) requires that any such application must be
acecmpanied by an affidavit executed by the owner of the information which
identifies the document or part sought to be withheld, and which contains a
full statement of the reasons on the basis which it is claimed that the infor-
Nl
'Q
8107060388 810h17
I
PDRADOCKOSOOg
G
p
T
.
.
,
Wisconsin Electric Power Company
-2-
June 17, 1981
mation should be withheld from public disclosure. This section further requires
the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4). The information sougnt to be withheld shall be incorporated as
far as possible into a separate part of the affidavit.
If we do not hear from
you in this regard within the specified periods noted above, a copy of this
letter, the enclosures, and your response to this letter will be placed in
the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
R. F. Heishman, Acting Director
Division of Resident and
Project Inspection
Enclosures:
1.
Appendix A, Notice
of Violation
2.
IE Inspection Report
No. 50-266/81-10 and
No. 50-301/81-11
cc w/encls:
G. A. Reed, Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
John J. Duffy, Chtef
Boiler Inspector
Peter Anderson, Wisconsin's
i
Environmental Decade
Mr. Stanley York, Chairman
Public Service Commission
l
(
RI
I
RIII
RIII
RIII
)
Knop
He shman
Gul m
.j p
K
6/ /81
$f
I-
J