Forwards IE Insp Repts 50-266/81-10 & 50-301/81-11 on 810501-29 & Notice of Violation
ML20005B159
Person / Time
Site: Point Beach  
Issue date: 06/17/1981
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Burstein S
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20005B160 List:
References
NUDOCS 8107060388
Download: ML20005B159 (2)


See also: IR 05000266/1981010

Text

l

/

%

UNITED STATES

!'

NUCLEAR REGULATORY COMMISSION

o

N

E

REGION til

,

k

799 ROOSEVELT ROAD

g . . . . . p#

GLEN ELLYN,ILUNOIS 6om

June 17, 1981

.

-

Docket No. 50-266

Docket No. 50-301

Wisconsin Electric Power Company

ATTN:

Mr. Sol Burstein

Executive Vice President

Power Plants

231 West Michigan

Milwaukee, WI 53201

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. W. G. Guldemond

and R. L. Hague of this office on May 1-29, 1981, of activities at Point Beach

Nuclear Plant, Units 1 aad 2, authorized by NRC Operating Licenses No. DPR-24

and No. DPR-27 and to the discussion of our findings with Mr. G. A. Reed at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

_

interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as specified in enclosed Appendix A.

A

written response, submitted under oath or affirmation, is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will ba placed

in the NRC's Public Document Rocm.

If the enclosures contain any information

that you or your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone

within seven (7) days from the date of this letter of your intention to file

a request for withholding; and (b) submit within twenty-five (25) days from

the date of this letter a written application to this office to withhold such

information.

Section 2.790(b)(1) requires that any such application must be

acecmpanied by an affidavit executed by the owner of the information which

identifies the document or part sought to be withheld, and which contains a

full statement of the reasons on the basis which it is claimed that the infor-

Nl

'Q

8107060388 810h17

I

PDRADOCKOSOOg

G

p

T

.

.

,

Wisconsin Electric Power Company

-2-

June 17, 1981

mation should be withheld from public disclosure. This section further requires

the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4). The information sougnt to be withheld shall be incorporated as

far as possible into a separate part of the affidavit.

If we do not hear from

you in this regard within the specified periods noted above, a copy of this

letter, the enclosures, and your response to this letter will be placed in

the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

R. F. Heishman, Acting Director

Division of Resident and

Project Inspection

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Report

No. 50-266/81-10 and

No. 50-301/81-11

cc w/encls:

G. A. Reed, Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

John J. Duffy, Chtef

Boiler Inspector

Peter Anderson, Wisconsin's

i

Environmental Decade

Mr. Stanley York, Chairman

Public Service Commission

l

(

RI

I

RIII

RIII

RIII

)

Knop

He shman

Gul m

.j p

K

6/ /81

$f

I-

J