ML20005B038
| ML20005B038 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 06/25/1981 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Bryan J UNION ELECTRIC CO. |
| Shared Package | |
| ML20005B039 | List: |
| References | |
| NUDOCS 8107060251 | |
| Download: ML20005B038 (2) | |
See also: IR 05000483/1981004
Text
e
9
2
6
.
WN 2 5 1981
Docket No. 50-483
Unita Electric Company
ATTN:
Mr. John K. Bryan
Vice President - Nuclear
Post Office Box 149
St. Louis, MO 63166
Gentlemen:
This refers to the investigation conducted by Messrs. J. Foster, W. Key, and
W. Hansen of this office on February 20, March 3-6, 23-27, 1981, of activities
at the Callaway Nuclear Plant, Unit 1, authorized by NRC Construction Permit
No. CPPR-139 and to the discussion of our findings with Mr. W. H. Weber,
Manager, Nuclear Construction, and others of your staff at the conclusion of
the investigation.
This investigation involved a review and expansion of a previous investigation
of an allegation relating to a weld in an accumulator discharge line pipe. The
enclosed copy of our investigation report identifies areas examined during the
investigation. Within these areas, the investigation consisted of a selective
examination of procedures and representative records, observations, and inter-
views with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in the enclosed Appendix A.
A written response, submitted under oath or affirmation, is required. We
are also concerned regarding your Architect-Engineer's failure to disposition
Nonconformance Report 2SN-0501-P.
In your response to this letter, please
advise us of actions you plan to take to prevent recurrence of similar errors.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter, the enclosures, and your response to this letter will be placed in the
.TA#I
8107060251 81062 ~
1
f$
PDR ADOCK 05000
G
P,
i
s
Unica Electric Company
-2-
JUN 2 5 19EH
-
NRC's Public Document Room.
If the enclosures contain any information that you
or your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within seven (7)
days from the date of this letter of your intention to file a request for with-
holding; and (b) submit within twenty-five (25) days from the date of this
let'ter a written application to this office to withhold such information.
Section 2.790(b)(1) requires that any such application must be accompanied by
an affidavit executed by the owner of the information which identifies the
document or part sought to be withheld, and which contains a full statement
of the reasons on the basis which it is claimed that the information should be
withheld from public disclosure. This section further requires the statement
to address with specificity the considerations listeJ In 10 CFR 2.790(b)(4).
The information sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in this
regard within the specified periods noted above, a copy of this letter, the
enclosures, and your response to this letter will be placed .
the Public
Document Room.
We will gladly discuss any questions you have concerning this investigation.
Sincerely,
James G. Keppler
Director
Enclosures:
1.
Appendix A, Notice
of Vio'ation
2.
IE Investigation Report
No. 50-483/81-04
cc w/encls:
W. H. Weber, Manager
Nuclear Construction
DMB/ Document Control Desk (RIDS)
Region IV
K. Drey
Ronald Fluegge, Utility
Division, Missouri Public
Service Commission
W(J
R
RIII
RIII
RIII
RIII
RIII
RIII,
Keyj{\\
Ffrelli D'anie.{f.-cn
b
b
t'W
L
Foster /jp
He en
St eeter
Davis
Kppfer
6/ 6 81
lf
&l24/M
6/ 4,
} +ld
6 .::5l$1
2-3
6X