Forwards IE Investigation Rept 50-483/81-04 on 810220, 0303-06 & 23-27 & Notice of Violation
ML20005B038
Person / Time
Site: Callaway Ameren icon.png
Issue date: 06/25/1981
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Bryan J
UNION ELECTRIC CO.
Shared Package
ML20005B039 List:
References
NUDOCS 8107060251
Download: ML20005B038 (2)


See also: IR 05000483/1981004

Text

e

9

2

6

.

WN 2 5 1981

Docket No. 50-483

Unita Electric Company

ATTN:

Mr. John K. Bryan

Vice President - Nuclear

Post Office Box 149

St. Louis, MO 63166

Gentlemen:

This refers to the investigation conducted by Messrs. J. Foster, W. Key, and

W. Hansen of this office on February 20, March 3-6, 23-27, 1981, of activities

at the Callaway Nuclear Plant, Unit 1, authorized by NRC Construction Permit

No. CPPR-139 and to the discussion of our findings with Mr. W. H. Weber,

Manager, Nuclear Construction, and others of your staff at the conclusion of

the investigation.

This investigation involved a review and expansion of a previous investigation

of an allegation relating to a weld in an accumulator discharge line pipe. The

enclosed copy of our investigation report identifies areas examined during the

investigation. Within these areas, the investigation consisted of a selective

examination of procedures and representative records, observations, and inter-

views with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as specified in the enclosed Appendix A.

A written response, submitted under oath or affirmation, is required. We

are also concerned regarding your Architect-Engineer's failure to disposition

Nonconformance Report 2SN-0501-P.

In your response to this letter, please

advise us of actions you plan to take to prevent recurrence of similar errors.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter, the enclosures, and your response to this letter will be placed in the

.TA#I

8107060251 81062 ~

1

f$

PDR ADOCK 05000

G

P,

i

s

Unica Electric Company

-2-

JUN 2 5 19EH

-

NRC's Public Document Room.

If the enclosures contain any information that you

or your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within seven (7)

days from the date of this letter of your intention to file a request for with-

holding; and (b) submit within twenty-five (25) days from the date of this

let'ter a written application to this office to withhold such information.

Section 2.790(b)(1) requires that any such application must be accompanied by

an affidavit executed by the owner of the information which identifies the

document or part sought to be withheld, and which contains a full statement

of the reasons on the basis which it is claimed that the information should be

withheld from public disclosure. This section further requires the statement

to address with specificity the considerations listeJ In 10 CFR 2.790(b)(4).

The information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified periods noted above, a copy of this letter, the

enclosures, and your response to this letter will be placed .

the Public

Document Room.

We will gladly discuss any questions you have concerning this investigation.

Sincerely,

James G. Keppler

Director

Enclosures:

1.

Appendix A, Notice

of Vio'ation

2.

IE Investigation Report

No. 50-483/81-04

cc w/encls:

W. H. Weber, Manager

Nuclear Construction

DMB/ Document Control Desk (RIDS)

Region IV

K. Drey

Ronald Fluegge, Utility

Division, Missouri Public

Service Commission

W(J

R

RIII

RIII

RIII

RIII

RIII

RIII,

Keyj{\\

Ffrelli D'anie.{f.-cn

b

b

t'W

L

Foster /jp

He en

St eeter

Davis

Kppfer

6/ 6 81

lf

&l24/M

6/ 4,

} +ld

6 .::5l$1

2-3

6X