Forwards IE Insp Rept 50-344/81-13 on 810518-22.No Noncompliance Noted
ML20005A878
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 06/15/1981
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Withers B
PORTLAND GENERAL ELECTRIC CO.
Shared Package
ML20005A879 List:
References
NUDOCS 8107010428
Download: ML20005A878 (2)


See also: IR 05000344/1981013

Text

s-

,

f

jo,

UNITED STATES

f g,cf j

NUCLEAR REGULATORY COMMISSION

g-

-"pr

REGION V

'

' %/ ' e'g

a;

1990 N. CALIFORNIA BOULEVARD

'

SUITE 202. WALNUT CREEK PLAZA

+ ,, e

WALNUT CREEK, CALIFORNIA 94596

'

June 15, 1981

-

Docket No. 50-344

en i ' %h

N\\'

w.

f!bL}b[1)

[i

  1. '

Portland General Electric Company

/

l

121 S. W. Salmon Street

M30EM>[7

Portland, Oregon 97204

Attention: Mr. Bart D. Withers

c, E E$7"/(I

Vice President, Nuclear

?J

h

Gentlemen:

4

Subject: NRC Inspection of the Trojan Nuclear Plant

This refers to the inspection conducted by Mr. P. P. Narbut and Mr. A.

D' Angelo.of this office on May 18-22, 1981 of activities authorized by

NRC License No. NPF-1, and to the discussion of our findings held with

Messrs. R. P. Barkhurst and other members of your staff at the conclusion

of the inspection.

Areas examined during this inspection are described in the enclosed insoection

report. Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and

observations by the inspector.

No items of noncompliance with NRC requirements were identified within

the scope of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

l

NRC's Public Document Room.

If this report contains any information that

i

you (or your contractors) believe to be exempt from disclosure under 10

l

CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone

within ten (10) days from the date of this letter of your intention to file

'

a request for withholding; and (b) submit within 25 days from the date of

this letter a written application to this office to withhold such information.

If your receipt of this letter has beert delayed such that less than seven

(7) days are available for your review, please notify this office promptly

so that a new due date may be established. Consistent with section 2.790

(b)(1), any such application must be accompanied by an affidavit executed

by the owner of the information which identifies the document or part sought

to be withheld, and which contains a full statement of the basis on which

it is claimed that the information should be withheld from public disclosure.

stlI

s. or 010%T

q

1

.

-

I

.

.

1

Y

Portland General Electric Company

-2-

June 15, 1981

1

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, the report will be placed in the Public

Document Room.

Should you have any questions concerning this inspection, we will be glad

to discuss them with you.

Sincerely,

7

u./[=M

B. H. Faulkenber

Reactor Constru tion Projec r

-

_ . _ . _ _ . - _ . _

Branch

'

Enclosure:

IE Inspection Report

No. 50-344/81-13

cc w/o enclosure:

-

.

C. P. Yundt, PGE

-

J. W. Durham, Esq. , PGE

-

.

+