Interim Deficiency Rept,Originally Reported on 810526,re Unspecified Weld Lengths in Support Design Drawings.Cause Unknown.New Support Details Will Identify Min Weld Length. Support Drawing Review Will Be Completed on 810731
ML20005A874
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 06/25/1981
From: Devincentis J
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
10CFR-050.55E, 10CFR-50.55E, SBN-166, NUDOCS 8107010417
Download: ML20005A874 (2)


Text

__

~

PUBLJC SERVICE

.eneww.ne q'$,.

SFAR00K STATION

+

o Engineering Office:

S'

[ g' 1671 Worcester Road 9

June 25, 1991 C) e Framingham, MA 01701 s

~:

SBN 166

[

@/

9 A

T.F. B. 4.2.7 Y

/

/

n'.

Ah

/-l United hdb@h ear Regulaowy Commission WashingtoM. 20555 Atten tion :

Office of Inspection and Enforcemant

References:

(a) Docket No. 50-433 and 50.444 (b) Telecon of May 20, 1981 Between Mr. Gallo (NRC) and Mr. DeVincentis (YAEC)

Subject : Interim Report - Reportable 10CFR50.55(e) Item - Specified Weld Lengths

Dear Sir:

On May 26, 1981, we reported as a potential 10CFR50.55(e) item that an investigation has shown that on some, of the support design drawings which do not give the specific length of weld, the length is implied by the use of interfacing dimensions and these have been used by the+ erection contractor.

In addition, in some cases where the weld length was not indicated, the erection contractor formally requested this information from UE&C engineering and a change was issued by UESC specifying the weld length. No cases are yet known where a support has been installed with inadequate weld length.

The following actions have either been taken or planned to rectify this deficiency:

All new support details will identify the minimum length of welds.

a.

b.

Tne minimum lengths of welds for all the supports located ir. the Containment dome have been identified as being of sufficient length.

For all new supports being installed, the contractor will initiate a c.

Raquest for Information when the length of weld or any other key dimension is a.ot defined on the drawing. UE&C will define any missing information in response to the RFI's.

d.

A review of drawings of all supports which have been installed will be performed to define the minimum lengths of the welds where required. The review will be complete July 31, 1981.

Installed supports will be inspected to assure that minimus lengths of e.

welds are provided.

T6V

.s Io 81070104f7 y

=

)

. U.S. Nuclear Regulatory Commission June 25, 1981 Attention: Office of Inspection and Enforcement Page 2 We will inform you of the results of the inspection upon completion. The inspection is scheduled to be completed October 1,1981.

t Very truly yours,

. c u.

John DeVincentis

_ j Project Manager IN/sec e