ML20005A868

From kanterella
Jump to navigation Jump to search
Forwards LER 81-005/01T-0.Detailed Event Analysis Encl
Date released: 01/19/2020 Download: ML20005A868


LER 81-005/01T-0:on 810222,low Power Injection Check Valve Discovered Leaking Excessively During Intersystem LOCA Leak Test.Caused by Buildup of Crud in Pivot Gap Area.Disc Hinge & Hinge Pin Replaced.Crud to Be Analyzed
ML20005A872
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 03/09/1981
From: Philpott F
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20005A872 (1)
Forwards LER 81-005/01T-0.Detailed Event Analysis Encl
ML20005A867
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 03/09/1981
From: Parker W
DUKE POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20005A867 (6)