ML20005A790

From kanterella
Jump to navigation Jump to search
Forwards LER 81-002/01T-0.Detailed Event Analysis Encl
Date released: 01/19/2020 Download: ML20005A790


LER 81-002/01T-0:on 810211,electrical Penetration EMV-2 Could Not Be Pressurized.Caused by Leak at Interior Bushing. Penetration to Be Repaired or Replaced During Next Outage
ML20005A793
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 02/25/1981
From: Jackie Jones
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20005A793 (1)
Forwards LER 81-002/01T-0.Detailed Event Analysis Encl
ML20005A789
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 02/25/1981
From: Parker W
DUKE POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20005A789 (3)