ML20005A617
| ML20005A617 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 06/16/1981 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Jackie Cook CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| Shared Package | |
| ML20005A618 | List: |
| References | |
| NUDOCS 8106300503 | |
| Download: ML20005A617 (2) | |
See also: IR 05000329/1981011
Text
..
[g[
'o
UNITED STATES
NUCLEAR REGULATORY COMMISSION
y
,
g
3 a
REGION lil
-
'
' #
799 ROOSEVELT ROAD
GLEN ELLYN. ILLINOls 6o137
o
~ . . .
.
.JUN 16 $31
V.
\\
fc;
,,
-
p/
ir
Docket No. 50-329
gy'f[
ly
.
9
Docket No. 50-330
~J
d8
~ . ' , 01981 w g!
..
..
,
y
Consumers Power Company
-
-
i
-
ATTN:
Mr. James W. Cook
i u,,' DEM*8 .7 /
Vice President
E ',
Midland Project
//
,*/
g<P
1945 West Parnall Road
'?
Jackson, MI 49201
Gentlemer.:
This refers to the routine safety inspection conducted by Messrs. R. M. Gardner
and R. S. Love of this office on April 28-30 and May 1, 1981, of activities at
the Midland Nuclear Power Plant Construction site authorized by NRC Construction
Permits No. CPPR-81 and No. CPPR-82 and to the discussion of our findings with
Mr. James W. Cook and others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in enclosed Appendix A.
A
written response, submitted under oath or affirmation, is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter, the enclosures, and your response to this letter will be
placed in the NRC's Public Document Room.
If the enclosures contain any
information that you or your contractors believe to be exempt from dis-
closure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this
office by telephone within seven (7) days from the date of this letter of
your intention to file a request for withholding; and (b) submit within
twenty-five (25) day; from the date of this letter a written application
to this office to withhold such information.
Section 2.790(b)(1) requires
\\go\\ l
310630
Q
.
Consumers Power Company
-2-
that any such application must be accompanied by an affidavit executed by
the owner of the information which identifies the document or part sought
to be withheld, and which contains a full statement of the reasons on the
basis which it is claimed that the information should be withheld from
public disclosure. This section further requires the statement to address
with specificity the considerations listed in 10 CFR 2.790(b)(4). The
information sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in this
regard within the specified periods noted above, a copy of this letter,
the enclosures, and your response to this letter will be placed in the
Public Document Room.
.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
C. E. Norelius, Acting Director
Division of Engineering and
Technical Inspection
Enclosures:
1.
Appendix A, Notice
of Violation
2.
IE Inspection Reports
No. 50-329/81-11 and
No. 50-330/81-11
cc w/encls:
,
'
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Ronald Callen, Michigan
Public Service Commission
Myron M. Cherry
!
P
'
R
RI
RIII
RIII
RIII
au
s-
/db
Sp " ard
Williams
Boyd
Gardne
J
,
p
LoV6 \\ ,