From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML20005A618 List:
References
NUDOCS 8106300503
Download: ML20005A617 (2)


See also: IR 05000329/1981011

Text

..

[g[

'o

UNITED STATES

NUCLEAR REGULATORY COMMISSION

y

,

g

3 a

REGION lil

-

'

' #

799 ROOSEVELT ROAD

GLEN ELLYN. ILLINOls 6o137

o

~ . . .

.

.JUN 16 $31

V.

\\

fc;

,,

-

p/

ir

Docket No. 50-329

gy'f[

ly

.

9

Docket No. 50-330

~J

d8

~ . ' , 01981 w g!

..

..

,

y

Consumers Power Company

-

-

i

-

ATTN:

Mr. James W. Cook

i u,,' DEM*8 .7 /

Vice President

E ',

Midland Project

//

,*/

g<P

1945 West Parnall Road

'?

Jackson, MI 49201

Gentlemer.:

This refers to the routine safety inspection conducted by Messrs. R. M. Gardner

and R. S. Love of this office on April 28-30 and May 1, 1981, of activities at

the Midland Nuclear Power Plant Construction site authorized by NRC Construction

Permits No. CPPR-81 and No. CPPR-82 and to the discussion of our findings with

Mr. James W. Cook and others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as specified in enclosed Appendix A.

A

written response, submitted under oath or affirmation, is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter, the enclosures, and your response to this letter will be

placed in the NRC's Public Document Room.

If the enclosures contain any

information that you or your contractors believe to be exempt from dis-

closure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this

office by telephone within seven (7) days from the date of this letter of

your intention to file a request for withholding; and (b) submit within

twenty-five (25) day; from the date of this letter a written application

to this office to withhold such information.

Section 2.790(b)(1) requires

\\go\\ l

310630

Q

.

Consumers Power Company

-2-

that any such application must be accompanied by an affidavit executed by

the owner of the information which identifies the document or part sought

to be withheld, and which contains a full statement of the reasons on the

basis which it is claimed that the information should be withheld from

public disclosure. This section further requires the statement to address

with specificity the considerations listed in 10 CFR 2.790(b)(4). The

information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified periods noted above, a copy of this letter,

the enclosures, and your response to this letter will be placed in the

Public Document Room.

.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

C. E. Norelius, Acting Director

Division of Engineering and

Technical Inspection

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Reports

No. 50-329/81-11 and

No. 50-330/81-11

cc w/encls:

,

'

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII