ML20005A114

From kanterella
Jump to navigation Jump to search
Final Rept Re Plant/Grid Interface Controls,Initially Reported 810505.Sys Accuracy Requirements Added to Control Drawings
ML20005A114
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 06/04/1981
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8106290406
Download: ML20005A114 (3)


Text

!h

\\

TENNESSEE VALLE.h$nifTHORITY CH ATTANOOGA. TENN ESSE'E $ 101 400 Chestnu$ Street Tower II I ' " 3

.j gg June 4, 1981 SQRD-50-328/81-38 Mr. James P. O'Reilly, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Counission Region II - Suite 3100 101 Marietta Street Atlanta, Georgia 30303

Dear Mr. O'Reilly:

SEQUOYAH NUCLEAR PLCTP UNIT 2 - PLANTK*JD INTERFACE CONTROLS -

SQRD-50-328/81 g lAL REPORT, The subject deficiency was initially reported to NRC-0IE Inspector P1 Taylor on May 5,1981 in accordance with 10 CFR 50.55(e) as NCR SQN QAB 8102. Enclosed is our final report.

If you have any questions, please get in touch with D. L. Lambert at FTS 857-2531.

Very truly yours, TENNESSEE VALLEY AUTHORITY LMN h oS A L. M. Mills, Manager Nuclear Regulation and Safety

.. 7'!k, s

-s

)

Enclosure

,,( !'; * ;].

v..-

cc:

Mr. Victor Stello, Director (Enclosure)

U iii..if 'fi) '-g Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission g"7 ""'~n.,.u SSi %.g

._ l Washington, DC 20555

$5Y'" [

gTTN 01 1 s.

~8166290 N 5-

~

ENCLOSURE SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 PLANT / GRID INTERFACE CONTROLS SQRD-50-328/81-38 10 CFR 50.55(e)

FINAL REPORT Description of Deficiency In a QA review, the accuracy of the instrumentation / control system used.by TVA to control the 161-kV grid voltag6 at Sequoyah Nuclear Plant was questioned.

The minimum acceptable voltage at the primary windings of the common station service transformers was determined to be 164 kV for unit 1 operating with unit 2 in preoperational testing, ano 165 kV for both units operating (until completion of certain auxiliary power system modifications). These voltage requirements were based on maintaining adequate voltage on the terminals of electric motors driving safety-related equipment duisng their starting, with the auxiliary power system supplied through only one common station service transformer. Loading was taken to be unit 1 in a LOCA shutdown with 23,824 MVA supplied to unit 2, or to be one urtt in a LOCA shutdown and the other in a full load rejection.

It was subst: 2ently determined that the grid should be operated at least two kV abot, these minimum levels. This was based en the max! sum voltage sag expected from loss of the two Sequoyah units with the transmission grid in the worst acceptabJe configuration.

It wao-expected that the grid voltage would be monitored at Sequoyah Nuclear Plant and normally adjusted within scheduled limits using the 500-kV to 161-kV intertie transformer at Sequoyah. However, it was not clear that the accuracy of the instrumentation / control system had been considered in esttblishing controls for maintaining the necessary plant / grid interface

~

conditions.

f Safety Implications If the accuracy of the instrumentation / control system used to maintain the 161 kV grid had not been considered and this lack of consideration led to a voltage outside the lower limit (yet still measured within the limit), then the operation of certain safety-rele'?d motors (identified in NCH SQN EEB 8115) could have been jeopardized.

Corrective Actions It has been determined that failure to consider the accuracy of the instrumentation / control system used to maintain 161-kV grid voltage at Sequoyah Nuclear Plant could not have jeopardized the safe operation of the plant as long as the present system design and equipment calibration procedures were in use. This determination is ciscussed below is detail.

The equipment used to monitor the 161-kV grid voltage at Sequoyah in the main control mon consists of two recording voltmeters (G.E. type CH-1),

one indicating voltmeter (G.E. type AB-40), and one undervoltage annunciation relay (Lamarche type ERA).. Each of these devices has an accuracy of one percent and is onlibrated on a six-month to three-year cycle using a laboratory instrument (Weston 904) with an accuracy of 0.5 percent which is periodically calibrated against Bureau of Standards instruments.- The undervoltage annunciation miay is also compensated for voltage drop from the switchyard to the control room. All of this instrumentation obtains its voltage fmm two sets of potential transformers with an accuracy of 0 3 percent. The charts on the recording voltmeters have an expanded scale such that two kV in the switchyard covers 1/8 of an inch on the recording chart. The maximum error expected in reading 161-kV grid voltage is less than 1.5 percent of the value read.

The intertie transformer bank at Sequoyah has load tap changers on its 500-kV windings that are adjustable in 6250-volt steps (1.25 percent of 500 kV).

The calculation methods and assumptions that established the minimum 161-kV grid voltages are conservative. The 480V system loading used assumed all 4 -

connected lotds except intermittent loads such as valves, hoists, etc. were operating continuously. All cable impedances for voltage calculations were based on maximum manufacturing tolerances and operating temperature. For I

those motors for which documentation was not available, locked rotor current and starting power factor were assumed to be worst values for the class of motor. This conservatism in the minimum grid voltage calculations taken with the conservatism in the design baser, plus the fact that safety-related 460-volt motors are NEMA type B with conservative torque ratings, leads to the conclusion that the =aximum error expected in controlling minimum grid voltage is acceptable.

A maximum limit on the 161-kV grid voltage at Sequoyah has not been established since no safety-related equipment is normally connected to the 161-kV system. With voltage scheduled between 167 kV and 168 kV and the j

maximum expected low reading esor, the voltage could be approximately 170 kV.

The common station service transformers are the equipment most vulnerable to damage from high grid voltage. Since their primary winding 3

taps are at 152.95 kV, they could be subjected to slightly over 11 percent i

overvoltage. However, since ce?e heating due to overexcitation is not

~ gene.' ally considered for less han 12 percent overvoltage, the error i

expected in controlling maximu.s grid voltage is acceptable.

Since the maximum expected grid voltage error with the present instrumentation / control system design is acceptable, no equipment me:lifications or interface mquirement changes are necessary. However, system accuracy requirements will be added to controlling drawings to

~

ensure that any future changes do not result in unacceptable instrumentation errors. This will be accomplished in the next drawing revision, or no later than the end of 1981.

TVA is in the process of evaluating its other nuclear facilities to l

determine if any similar conditions exist that might affect their operation. Any deficiencies of this nature discovered will be documented as nonconformances and dispositioned in accordance with 10 CFR 50.55(e).

i l

. - ~ _.

..