ML20005A001

From kanterella
Jump to navigation Jump to search
Forwards LER 81-029/03L-0.Detailed Event Analysis Encl
Date released: 01/19/2020 Download: ML20005A001


LER 81-029/03L-0:on 810310,during Routine Insp,Flow Meter for Conventional Waste Water Treatment Discharge Line Was Not Operating Properly.Caused by Improper Setting of Select Switch.Flow Terminated & Select Switch Properly Set
ML20005A002
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 04/09/1981
From: Ouellette R
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20005A002 (1)
Forwards LER 81-029/03L-0.Detailed Event Analysis Encl
ML20005A000
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 04/08/1981
From: Parker W
DUKE POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20005A000 (3)