ML20004G122
| ML20004G122 | |
| Person / Time | |
|---|---|
| Site: | Big Rock Point File:Consumers Energy icon.png |
| Issue date: | 06/26/1981 |
| From: | Vincent R CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | Crutchfield D Office of Nuclear Reactor Regulation |
| References | |
| TASK-15-14, TASK-RR NUDOCS 8106290229 | |
| Download: ML20004G122 (2) | |
Text
e e$
g cQnsumes
. h, b
&".cf CQaQQ
@0M Joneral Offices: 212 Want Michlgen Avenue, Jackson, MI 49201 e (517) 788-0560 June 26, 1981 Director, Nuclear Reactor Regulation Att Mr Dennis M Crutchfield, Chief Operating Projects Branch No 5 US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-155 - LICENSE DPR BIO ROCK POINT PLANT - SEP TOPIC XV-lk, INADViinaar OPERATION OF ECCS AND CHEMICAL AND VOLUME CONTROL SYSTEM MA1FUNC"' ION THAT INCREASES REACIOR COOLANT INVENTORY At ached is the Const=ers Power Conpany evaluation of SEP '"opic XV-lk fer the Big Rock Point Plant.
Robert A Vincent (Signed)
Robert A Vincent Staff Licensing Engineer CC Director, Region III, USNRC NRC Resident Inspector - Big Rock Point f-( b 5
f
>go 810o2oo ggg
4 Topic XV-1k: Inadvertent Operation of ECCS and Chemical and Volume Control System Malfunction that Increases Reactor Coolant Inventory Evaluation:
For boiling water reactors, Standard Review Plan section 15.5.1/2 defines the following specific initiating events for consideration under this topic:
1.
Inadvertent operation of high pressure core spray system 2.
Inadvertent operation of high pressure coolant injection system 3.
Inadvertent operation of reactor core isolation system Big Rock Point has none of the systems listed above. Therefore, this topic is not applicable.
--