ML20004F954

From kanterella
Jump to navigation Jump to search
Forwards LERs 81-002/03L-0,81-016/03L-0 & 81-017/03L-0
Date released: 01/18/2020 Download: ML20004F954


LER 81-002/03L-0:on 810525,during Testing,Steam Generator Code Safety Valve on Steam Line B Opened & Did Not Reseat. Cause Unknown.Valve Returned to Mfg for Investigation & Replaced
ML20004F960
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 06/23/1981
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20004F960 (1)
LER 81-016/03L-0:on 810523 & 24,temp Average Decreased Below Required Temp.Caused by Overfeeding Steam Generators During Transient Rod Movements.Operators Cautioned.Temp Restored
ML20004F958
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 06/23/1981
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20004F958 (2)
LER 81-017/03L-0:on 810602,train a Chlorine Detector Was Declared Inoperable.Caused by Broken Reset Switch.Switch Replaced
ML20004F956
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 06/23/1981
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20004F956 (1)
Forwards LERs 81-002/03L-0,81-016/03L-0 & 81-017/03L-0
ML20004F953
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 06/23/1981
From: Clayton F
ALABAMA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20004F953 (1)