Advises That Util Will Provide Estimates of Operator Time Required to Terminate Forced Flow Into Turbine Bldg & Identify Flood Alert Instrumentation.Mods May Be Required So Operator Can Terminate Expansion Joint Leak Below PMF Level
ML20004F918
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/22/1981
From: Schmidt H
TEXAS UTILITIES SERVICES, INC.
To: Burwell S
Office of Nuclear Reactor Regulation
References
TXX-3314, NUDOCS 8106260191
Download: ML20004F918 (1)


Text

._

= mW{Q]

^3&T,'%? ~ ~

i /

w xTQ-hgg.3%.,

Log # TXX-3314 w.Jm3sfc29BE;EjE#7AS:&rILITIES SERVICES INC.

, g g y $ y m

g l,wi ay,3 rowea.oxtox,.rska,23,0, F_fle # 830-

~

M

~

~

June 22, 1981 amm-.

s ;m, f,;.

?j;@2f$.%U$ '

~3ESix3ttswoo'd 'Burwell

[ (k / [ -

.

  • LicensinglProiec.t Manager l',

N y 4'

'M 0ffice';.of' Nuclear Reactor Regulation 9k M[t

(

?c_ M 'Z1C*S7 Nuclear Regulatory Commission

?

42 C

~'~Ma'sh fng tori;" D.'C'.~~ 20555 p

f E'f QQ39

SUBJECT:

COMANCHE' PEAK STEAM ELECTRIC STATION CIRCULATING WATER EXPANSION JOINT FAILURE REF: LETTER TXX-3310, EVALUATION OF CIRCULATING WATER EXPANSION JOINT FAILURE

Dear Mr. Burwell:

In regards to the referenced letter we shall provide estimates of the time the operator requires to terminate the forced flow into the Turbine Building and identify the instrumentation that alerts the operator to flooding.

If flooding.above the PMF level occurs before the operator can terminate the expansion joint leak, modifications will be proposed to prevent flooding above the PMF level in the electrical and control buildings and/or provide additional instrumentation to the operator to assure a faster response time.

If you have any questions, please call.

Sincerely, H. C. Schmidt AND:tls cc: