Text
M
%
UNITED STATES
NUCLEAR REGULATORY COMMISSION
,
, ' y
"a
g
REGION IV
l
/
61: */AN PLAZA DRIVE. SUITE 1000
'(1 , , , , , *
-
ARUNGTON. TEXAS 76011
In Reply Refer To:
'
g
RI"
t
-
Docket No. 50-382/Rpt. 81-05
/.?"
I
W,, /g DIA 9
Louisiana Power and Light Company
C.
ATTN: Mr. D. L. Aswell
- %
Vice President - Power Production
.h
Nbg
N
142 Delaronde Street
sp
New Orleans, Louisiana 70174
,
Gentlemen:
This refers to the inspection conducted by Messrs. P. C. Stewart and A. R.
Johnson of our staff during the periods February 24-27 and March 2-6, 1981,
of activities authorized by NRC Construction Permit No. CPPR-103 for Waterford
Steam Electric Station, Unit No. 3, and to the discussion of our findings
with Mr. T. Gerrets and other members of your staff at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews
with personnel, and observations by the inspectors.
We have also examined actions you have taken with regard to previously
identified inspection findings. The status of these items is identified
in paragraph 2 of the enclosed report.
During this inspection, it was found that certain of your activities were
not conducted in full compliance with NRC requirements and your commitments
to the NRC.
Consequently, you are requested to respond to this matter in
writing.
Your response should be based on the specifics contained in the
Notice of Deviation attached to this letter. Of concern is your failure to
evaluate test results of bolt tension tests and to continue the corrective
action you stated you would take subsequent to our inspection and Notice of
Violation, dated April 4, 1980.
In accordance with Section 2.790 of the NRC's " Rules n' Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this .Mtter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If the
report contains any infonnation that you believe to be proprietary, it is
necescary that you submit a written application to this office, within 25 days
of the date of this letter, requesting that such information be withheld from
public' disclosure.
The app ' cation must include a full statement of the
reasons why it is claimed that the information is proprietary.
The application
,
810 6 22 0 W.;
S
\\
_ . _
--
.-
,
Louisiana Power and Light-
2-
May 4, 1981
Company
should be prepared so that any proprietary information identified is contained
in'an enclosure to the application, since the application without the enclosure
will aM be placed in the Public Document Room.
If we do not hear from you
in this regard within the specified period, the report will be placed in the
Public Document Room.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
f
,
W. C.
idle, Chief
Enginee'fing Inspection Branch
Enclosures:
1.
Appendix A, Notice of Deviation
2.
IE Inspection Report No. 50-382/81-05
..