Submits Addl Response to IE Bulletin 79-18, Audibility Problem Encountered on Evacuation of Personnel from High Noise Areas. Mods Undertaken During Current Outage.Testing Under Max Noise Conditions Will Be Completed within 30 Days
ML20004F578
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 06/15/1981
From: Haynes J
SOUTHERN CALIFORNIA EDISON CO.
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
810616, IEB-79-18, NUDOCS 8106190120
Download: ML20004F578 (2)


Text

.

.s

%Y V

e Southern California Edison Company

  • i P. O. BOX 400 2 344 W ALNut GROVE AVENUE moSEMEAQ CALIFonNa A s t ??O f.'

J. o, H A V N f 3 k

ts6t. ome A

m..................

L-3 a

,i, :'..i' Rpg" U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region V 1990 North California Boulevard Suite 202, Walnut Creek Plaza

'# gN' q;

Walnut Creek, California 94596 Q

ofp--

h '(9\\

p 3 A J.'.:

Attention:

Mr. R. H. Engelken. Director 1.U

$1 k JUN1SE81m C0 l

00CKET No.'Y50-206 h 'EuY N 1

SAN ONOFRE - UNIT 1

/^

,D i

l

Dear Ste:

IE BULLETIN 79-18 AUDIBILITY PROBLEMS.INCOUNTERED ON EVALUATION OF PERSONNEL FROM HIGH-NOISE AREAS

REFERENCES:

1) Letter. J. T. Head (SCE) to R.H. Engleken (NRC),

dated September 19, 1979

2) Letter, J. T. Head (SCE) to R.H. Engleken (NRC),

dated Decemoer 4, 1979 The referenced letters provided our response to the suoject IE Bulletin ano documented tne results of investigations into the audibility problems of the identified systems.

Signal audibility was determined to be in:ufficient in several locations and extensive modifications of the In-Plant Paging, Immediate Evacuation Signal, and Area Radiation Monit ring l

Sy tems were undertaken during the current outage.

The pnysical mocifications will be complete and the systems functionally servicaole at tne time the unit returns to service.

n occur to assure that the audibility of the equipment meets desig specification, plant operation at or near full load 's required o

estaolish the maximum background noise levels prior to complett g the systems tests, gli 8106190 W.A 6i a

,VN?Y

'D;-

e.

.e-v.

je p.,'

U.S. NUCLEAR REGULATORY COMMISSION IE EULLETIN 79-18 PAGE'2 Testing to verify the adecuacy of the systems under maximum noise concitions will be' completed within 30 days of the unit return to sustained full load coeration. Should the' testing-indicate that adjustments and/or repairs to systems components are necessary, corrective action will be taken to satisfy the bulletin requirements.

Please notify me if you have any questions concerning this matter.

Sincerely, A4.Jf J. G. HAYNE MANAGER OF NUCLEAR OPERATIONS FB:eg cc: