Forwards IE Insp Repts 50-553/81-03 & 50-554/81-02 on 810318-20 & Notice of Violation
ML20004F502
Person / Time
Site: Phipps Bend  Tennessee Valley Authority icon.png
Issue date: 04/10/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20004F496 List:
References
NUDOCS 8106180488
Download: ML20004F502 (2)


See also: IR 05000553/1981003

Text

e

,

,

.

.

,,

AR Rf C

/

'o

UNITED STATES

    • "

~,

!

'n

NUCLEAR REGULATORY COMMISSION

E

I

REGION 11

o,

101 MARIETTA ST., N.W SulTE 3100

'#

ATLANTA, GEORGIA 30303

%.....o

O.

'"" 2 0 '98r

Tennessee Valley Authority

ATTN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

Subject: Report Nos. 50-553/81-03 and 50-554/81-02

'

This refers to the routine inspection conducted by J. R. Harris of this office on

March 18-20, 1981, of activities authorized by NRC Construction Permit Nos.

CPPR-162 and CPPR-163 for the Phipps Bend facility. Our preliminary findings

were discussed with W. P. Kelle(han at the conclusion of the inspection.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements.

This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Appendix A.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

Two new unrasolved items are identified in the et1 closed inspection report. These

items will be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspec-

tion report will be placed in the NRC Public Document Room.

If this report

contains any information that you believe to be proprietary, it is necessary that

you make a written applic& tion within 20 days to this officr to withhold such

information from public disclosure. Any such apnif v ion must include the basis

for claiming that the information is proprietart and the proprietary information

should be contained in a separate part of the document.

If we do not hear from

you in this regard within the specified period, the report will be placed in the

-

Public Document Room.

,

)

e

&

H10G180 N

l

.

--

,

_

_

.

.

.

..

.---

Tennessee Valley Authority

2

,

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Since ly,

f

!

!

. C. Lewi[,[icting Di/ector

l

Division of Resident and

Reactor Project Inspection

i

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos.

50-553/81-03 and 50-554/81-02

cc w/ encl:

H. J. Green, Division Director

W. P. Kelleghan, Project Manager

J. F. Cox, Supervisor, Nuclear

Licensing Section

J. E. Wills, Project Engineer

H. N. Culver, Chief, Nucigar

Safety Review Staff

.