Responds to Violation Noted in IE Insp Rept 50-387/81-05. Corrective Actions:Calibr Std Containing Representative Welds Will Be Fabricated for Use in Ultrasonic Exam of Weld Configuration
ML20004F408
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 05/15/1981
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20004F407 List:
References
PLA-787, NUDOCS 8106180302
Download: ML20004F408 (3)


Text

.

V PP&L TWO No R T H NINT H sT R t ti, AL L E N f oWN, P A. 18101 P M o N t: (215) 8 21 5151 May 15, 1981 Mr. Doyce H. Grier Director, Pcgion I U. S. tMclear Regulatory crnminsicn 631 Park Averase FJ.ng of Prussia, PA 19406 SUSQUE!!Ataa STEAM ELECTRIC STATIOi FDEL REPOIC OF A IK2XX24PLIA!EE REIATItG TO ' HIE FAIIURE 'IO APPLY DESIGi 00tEPOL 'IO MEET SECTIQi XI EGMINATIOi REQUIREMENTS IVR RECIPCUIATIOi dM FIEID SDDIFICATIQ3S ER 100450 FILE 840-4/899-M-191 PIA-787 Rcferences: 1)

I.E. Inspection Report No. 50-347/79-37 (11/19/79) 2)

I.E. Inspection Report tb. 50-387/80-03 (4/11/80) 3)

I.E. Inspection Report No. 50-387/81-03 (2/13/81) 4)

I.E. Inspection Report.No. 50-387/81-05 (4/7/81)

Oear Mr. Grier:

The purpose of this letter ir to provide a response to the concerns expressed in the above referenced NIC inspection reports relative to the ASME Section XI ultrasonic examination of the recirculation system riser to sweepolet double weld joint.

Several NPC positions were established (Reference 1, Itcm 4); since then, all positions have been satisfactorily ackncwledged to date except itcm 4(c) which e'onla with the subject of the design of the enlibration block to be used for the examination. It is PP&L's intent to amply with the NBC position expressed and reiterated in the referenced ins;crtion reports; that is, a e,libration standard containing representative

  • elds will be fabricated for use in the ultraconic examination of this weln configuration. Our preservice examination contractor, Nuclear Energy Services (NES), has been instructed to proceed with the design of this standard. The procedure and the calibration block drawings will both be available for inspector review on site as in the past.

810 618 0 %>

,t ~ N s v t v Ni.

,owt.. tionI co-,4Nv

Mr. Boyce H. Grier

-2 May 15, 1981 This additional infomaticm should conclusively satisfy the Camission's concern and make it possible to close out this opm itan.

Please advise should you have any questions.

Very truly yours,

/

P N. W. Curtis Vice President-Engineering & Construction-Nuclear ARS/pae cc: Mr. Gary Rhoads U. S. Nuclear Begulatory Cm mission P.O. Box 52 Shickshinnf, PA 18655 9

AFFIDAVIT COMMONWEALTH OF PENNSYLVANIA)

' SS COUNTY OF LEHIGH

)

I, NORMAN W. CURTIS, being duly sworn according to law, state that I am Vice President, Engineering &

Construction - Nuclear of Pennsylvania Power & Light Company and that the facts set forth on the attached response by Applicants are true and correct to the best of my knowledge, information and belief.

0

/>flA Y A

l

~ Norman W. Curtis Vice Pre'sident, Engineering 5 Construction -

Nuclea'r Sworn to and subscribed before me this fifteenth day of May, 1981.

n p

In I

,o If^.G

\\'

u Notary Pub ic JOHN P. MILLER, JR., N tary blic Mentown. LeNeh Coun y, Pa.

My Comrmasson Empires May 24,1981 l