ML20004F391

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-289/81-01 on 810101-0227.No Noncompliance Noted
ML20004F391
Person / Time
Site: Crane Constellation icon.png
Issue date: 06/03/1981
From: Keimig R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Hukill H
METROPOLITAN EDISON CO.
Shared Package
ML20004F392 List:
References
NUDOCS 8106180286
Download: ML20004F391 (2)


See also: IR 05000289/1981001

Text

. .- ; . - - .

.

.

",

.

,

,

[

4

UNITED STATES

. %g

NUCLEAR REGULATORY COMMISSION

y

j

REGION t

$313 ARK AVENUE

8

th

f

KING OF PRUSSI A. PENN5Vt.V ANI A 19404

,

'

JUN 0 31981

Docket No. 50-289

$hW/

Metropolitan Edison Company

of

pf '9

ATTN: Mr. H. D. Hukill

fy

'84

A%

,

UW

Vice President and Director of THI-l

p'

44,2

~

, * g? gg

P.O. Box 480

/

i

Middletown, Pennsylvania 17057

Gentlemen:

p

Subject:

Inspection Report 50-289/81-01

A

W

f

This refers to the routine safety inspection conducted by Mr. D. Haverkamp

of this office on January 1 - February 27, 1981, af activities authorized

by NRC License No. DPR-50 and to the discussions of our findings held by

Mr. W. Rekito of this office with you and other members of your staff at

the conclusion of the inspection.

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

letter. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

observed.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any infonnation

that you (or your contractors) believe to be exempt froc disclosure

under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office

by telephone within 10 days from the date of this letter of your intention

to file a request for withholding; and (b) submit within 25 days from the

date of this letter a written application to this office to withhold

such information. Consistent with section 2.790(b)(1), any such application

must be accompanied by an affidavit executed by the owner of the infonnation

which identifies the dpcument or part sought to be withheld, and which

contains a full statement of the reasons on the basis which it is claimed

i

that the infonnation should be withheld from public disclosure. This

section further requires the statement to address with specificity the

considerations listed in 10 CFR 2.790(b)(4).

The information sought to

be withheld shall be incorporated as far as possible into a separate

l

fS*f

s

l

8106 180 M

4

,

l

.

_

-

.

'

.

. .

,

.

Metropolitan Edison Company

-2-

JUN 0 31981

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, the report will be placed in the

Public Document Room. The telephone notification of your intent to

request withholding, or any request for an extension of the 10 day

period which you believe necessary, sbould be made to tho Supeevisor,

Files, Mail and Records, USNRC Region I, at (215) 337-5223.

No reply to, this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with y)u.

Sincerely,

I

)

  • ! : ::

R. R. Keimig, hief

Projects Branch #2, Division of

Resident and Project Inspection

Enclosure: Office of Inspection and Enforcement Inspection Report

!

Number 50-289/81-01

,

cc w/ encl:

R. J. Toole, Operations and Maintenance Director, TMI-l

C. W. Smyth, Supervisor of Licensing, TMI-l

E. G. Wallace, Manager PWR Licensing

'

J. B. Liberman, Esquire

G. F. Trowbridge, Esquire

Ms. Mary V. Southard, Chairperson, Citizens for a Safe Environment

,

(Without report)

'

,

!

I

r

[

!

i

.

,

--

_-