Forwards IE Safety Insp Repts 50-245/81-03 & 50-336/81-02 on 810209-13 & Notice of Violation
ML20004F356
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 05/01/1981
From: Snyder G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20004F357 List:
References
NUDOCS 8106180224
Download: ML20004F356 (2)


See also: IR 05000245/1981003

Text

.

-fg

..

2

[

%,

UNITED STATES

f

. 'k

NUCLEAR REGULATORY COMMtssION

cI

o

REGION I

I4

'2

631 PARK AVENUE

KING OF PRUS$3 A. PENNSYLVANI A 19406

+...+

-

Docket Nos. 50-245

EY l

1901

$ Lt )

!

0

50-336

e

4

Northeast Nuclear Energy Company

ATTN: Mr. W. G. Counsil

g

g

'

v

-

Senior Vice President - Nuclear

-

JUN 1519814

,

Engineering and Operations

P. O. Box 270

q; u.a. g g an -12

'

Hartford, Connecticut 06101

(

f

Gentiemen:

0 ' **

Subject: Combined Inspection 50-245/81-03; 50-336/81-02

,

This refers to the routine safety inspection conducted by Ms. C. Sakenas of this

office on February 9-13, 1981 at the Millstone Nuclear Power Station and the

t

Northeast Utilities Service Company Offices in Berlin, Connecticut of ~ activities

authorized by NRC License Nos. DPR-21 and DPR-65 and to the discussions of our

,

findings held by Ms. Sakenas with Messrs. Mroczka, Rodgers, Johnson and others

,

of your staff at the conclusion of the inspection, and to a subsequent telephone

!

discussion between Ms. Sakenas and Mr. Doroski on February 19, 1981.

Areas examined during this inspection are described in the Office of Inspection

[

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

,

inspector.

'

Our inspector also verified the steps you have taken to correct the items of

noncompliance brought to your attention in the enclosure to our letter dated

July 19, 1979. We have no further questions regarding your action at this time.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in the

Notice of. Violation, enclosed herewith as Appendix A.

This item of noncompliance

has been categorized into the levels described in the Federal Register Notice

[

(45 FR 66754) dated October 7, 1980.

You are required to respond to this letter

and in preparing your response, you should follow the instructions in Appendix

A.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

q]0, Code of Federal Regulations, a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room.

If this report contains any information

.

8106180 hh

4

.

?-

MAY 1

1981

'

Northeast Nuclear Energy

2

Company

,

h

that you (or your contractor) believe to be proprietary, it is necessary that

you make a written application within 20 days to this office to withhold such

information from public disclosure. Any such application must be accompanied by

an affidavit executed by the owner of the infcrmation, which identifies the

document or part sought to be withheld, and unich contains a statement of reasons

.

which addresses with specificity the items which will be considered by the

!

Comission as listed in subparagraph (b) (4) of Section 2.790. The information

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within the

specified period, tha report will.be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to

'

discuss them with you.

Sincerely,

k

i

.

  1. Gary

Sny er, p ef

!'

Eme encyPrepagnessandProgram

Support Branch

i

Enclosures:

i

-

1.

Appendix A, Notice of Violation

-

!

2.

Office of Inspection and Enforcement Combined Inspection

Report Number 50-245/81-03; 50-336/81-02

cc w/encls:

[

E. J. Mroczka, Station So,.~intendent

J. F. Opeka, System Superinta- 'ent, Nuclear Operations

D. G. Diedrick, Manager of Quality Assurance

,

J. R. Hininelwright, Licensing Safeguards Engineer

!

,

t