[b
neo
[
'
UNITED STATES
o
!
-
NUCLEAR REGULATORY COMMISSION
~
n
3
i
REGION 11
-
f
101 MARlETTA ST., N.W., SUITE 3100
CD
ATLANTA, GEORGI A 30303
/
MY 0 5 ggy
& g$
,D
/
&
9
4
%
N
r
Alabama Power Company
E
p
&
ATTN:
R. P. Mcdonald
3 ,,.
jh
.
Vice President-Nuclear Generation
4
g/
P. O. Box 2611
//g p \\
~ Birmingham, AL 35291
-
Gentlemen:
Subject: Report Nos.
_RL.-AndM/81-12)
This refers to the routine inspection conducted by Mr. W. B. Bradford of this
office on March 16 - April 15, 1981, of activities authorized by NRC License Nos.
NPF-2 and NPF-8 for the Farley facility and to the discussion of our findings
held with Mr. W. G. Hairston, Plant Manager, at the conclusion of the inspection.
Areas examined during the inspe-tion and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective exe.minations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
i
We have examined actions you have taken with regard to previously identified
'
enforcement matters. These are discussed in the enclosed inspection report.
In accordance with Section 2.790 of the_NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the -enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your' contractor) believe to be
,
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which it
is claimed that the information is proprietary, and shou 1d be prepared so that
~
'
proprietary information identified in the application is contained in a separate
part of the document. If we do not hear from you within the .specified period,
!
the report will be placed in the Public Document Room.
8106170C#l
_
-
- _ - -
_
-
- _ _ .
. - .
. - _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .
s
Alabama Power Company
2
i
g
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
-
Sincerely,
~
8.C.
-
r
R. C.
wis, Acting Director
,
Division of Resident and
l
Reactor Project Inspection
!
~
i
~
Enclosures:
Inspection Report Nos.
50-348/81-09 and 50-364/81-12
"
cc w/ encl:
W. O. Whitt, Executive Vice President
F. L. Clayton, Jr. , Senior Vice President
'
H. O. Thrash, Manager-Nuclear Generation
0. D. Kingsley, Jr., Manager, Nuclear Engineering
and Technical Services
!
J. W. McGowan, Manager-Operations
Quality Assurance
,
W. G. Hairston, III, Plant Manager
W. C. Petty, Manager-Quality. Assurance
(Design and Construction)
l
i
R. E. Hollands, Jr., CA Supervisor