ML20004F230
| ML20004F230 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 06/10/1981 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA) |
| Shared Package | |
| ML20004F231 | List: |
| References | |
| NUDOCS 8106160644 | |
| Download: ML20004F230 (1) | |
Text
_
Mailing Address Alabama Power Company 600 North 18th Street Post Ot' ice Box 2641 Birmmgham Alabama 35291 Telephone 205 783-6081 F. L Claytort, Jr.
Senior Vice President Alabama Power rlintridge Building the saatern sectre r.=em June 10, 1981 Docket No. 50-364 k
Nf (Q 4 Director, Office of Management Information and Program Control F
U. S. Nuclear Regulatory Commission
_1 N Il1 5 Jggy g 7 Washington, D.C.
20555
" 8 %g
Dear Sir:
A 7
s
%.j
,d RE: Jo sph M. Farley Nuclear Plant
~
Unit No. 2 Monthlv Operating Data Report Attached are two (2) copies of the May,1981 monthly operating report for Joseph M. Farley Nuclear Plant, Unit 2, as required by Section 6.9.1.10 of the Unit 2 Tech *nical Specifications. As requested by letter from Mr.
John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.
If you have any questions, please advise.
Yours very eruly, 1
F layton Jr.
FLCJr/JRC:nac Attachments l
xc:
Mr. Ted Cintula (1 copy) f 6 10 copies) l Director, RII (1 copy)
TEAY s
//
81061cobN g
..