Text
Ph
s ..
,/ .w oo,y'o,,
UNITED STATES
!
NUCLEAR REGULATORY COMMISSION
o
E
E
REGION 111
i
%
7se noossvsLT noAo
-
8
oLEN ELLYN, ILLINOIS 80137
%*****,o
,,
.#
',n\\n n A '0 01
Yi b $y ,
O
5
Docket No. 50-373
-
h
Docket No. 50-374
~.y-
h*,*
,
6
3
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
/'
M'
'
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Mr. K. D. Ward
of this office on June 1, 1981, of activities at La Salle County Station,
Units I and 2, authorized by NRC Construction Permits No. CPPR-99 and
No. CPPR-100 and to the discussion of our findings with Mr. W. Donaldson
and others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and inter-
views with personnel.
.
.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRL's
Public Document hoom. If this report contains any information that you or
your contractors believe to be. exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephor2 within seven (7)
days frem the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days from the date of
~
this letter a written application tar this office to withhold such informa-
tion. Section 2.790(b)(1) requires that any such application must be
ac'.:ompanied by an affidavit executed by the owner of the information which
identifies the document or part sought to be withheld, and which contains
a full statement of the reasons on the basis which it is claimed that the
information should be withheld from public disclosure. This section further
,
Tgol
s
I/
.
4
81ee2g 4
.
.
_
_
_ _ _
_ _
- .
..
Commonwealth Edison Comp.any
-2-
JUN O 4 tdB1
requires the statement to address with specificity the considerations listed
in 10 CFR 2.790(b)(4). The information sought to be withheld shall be'incor-
porated as far as possible into a separate part of the affidavit. If we do
not hear from you in this regard within the specified periods noted above,
a copy of this letter and the enclosed inspection report will be placed in
the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
~
,
C. E. Norelius, Acting Dire'ctor
Division of Engineering and
Technical Inspection
.
Enclosure: IE Inspection
Reports No. 50-373/81-21
and No. 50-374/81-10
cc w/ enc 1:
J. S. Abel, Director
of Nuclear Licensing
.
L. J. Burke, Site
.
,
Construction Superintendent
T. E. Quaka, Quality
Assurance Supervisor
R. H. Holyoak, Station
Superintendent
B. B. Stephenson
Project Manager
DNB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Mary Jo Murray, Office of
Assistant Attorney General
.
RIII
RIII
RIII
RI(I
R I
.
b
a
on
Reimann #
Sp sard
Noc'e
'
/
6/4/81
[j/p///
,
.
-
-
, ,
w ,
7-
,.
- ,
. . -
- . , . < -
,.-,.,,.,...,,.7,,.,,m,
, , _ , _ . _ _ . . , . , , _ _ . , . , , , , , - _
9 , . _