Forwards IE Insp Repts 50-373/81-21 & 50-374/81-10 on 810601.No Noncompliance Noted
ML20004F186
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 06/04/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20004F187 List:
References
NUDOCS 8106160593
Download: ML20004F186 (2)


See also: IR 05000373/1981021

Text

Ph

s ..

,/ .w oo,y'o,,

UNITED STATES

!

NUCLEAR REGULATORY COMMISSION

o

E

E

REGION 111

i

%

7se noossvsLT noAo

-

8

oLEN ELLYN, ILLINOIS 80137

%*****,o

,,

.#

',n\\n n A '0 01

Yi b $y ,

O

5

Docket No. 50-373

-

h

Docket No. 50-374

~.y-

h*,*

,

6

3

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

/'

M'

'

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Mr. K. D. Ward

of this office on June 1, 1981, of activities at La Salle County Station,

Units I and 2, authorized by NRC Construction Permits No. CPPR-99 and

No. CPPR-100 and to the discussion of our findings with Mr. W. Donaldson

and others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and inter-

views with personnel.

.

.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRL's

Public Document hoom. If this report contains any information that you or

your contractors believe to be. exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephor2 within seven (7)

days frem the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

~

this letter a written application tar this office to withhold such informa-

tion. Section 2.790(b)(1) requires that any such application must be

ac'.:ompanied by an affidavit executed by the owner of the information which

identifies the document or part sought to be withheld, and which contains

a full statement of the reasons on the basis which it is claimed that the

information should be withheld from public disclosure. This section further

,

Tgol

s

I/

.

4

81ee2g 4

.

.

_

_

_ _ _

_ _

.

..

Commonwealth Edison Comp.any

-2-

JUN O 4 tdB1

requires the statement to address with specificity the considerations listed

in 10 CFR 2.790(b)(4). The information sought to be withheld shall be'incor-

porated as far as possible into a separate part of the affidavit. If we do

not hear from you in this regard within the specified periods noted above,

a copy of this letter and the enclosed inspection report will be placed in

the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

~

,

C. E. Norelius, Acting Dire'ctor

Division of Engineering and

Technical Inspection

.

Enclosure: IE Inspection

Reports No. 50-373/81-21

and No. 50-374/81-10

cc w/ enc 1:

J. S. Abel, Director

of Nuclear Licensing

.

L. J. Burke, Site

.

,

Construction Superintendent

T. E. Quaka, Quality

Assurance Supervisor

R. H. Holyoak, Station

Superintendent

B. B. Stephenson

Project Manager

DNB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Mary Jo Murray, Office of

Assistant Attorney General

.

RIII

RIII

RIII

RI(I

R I

.

b

a

on

Reimann #

Sp sard

Noc'e

'

/

6/4/81

[j/p///

,

.

-

-

, ,

w ,

7-

,.

- ,

. . -

- . , . < -

,.-,.,,.,...,,.7,,.,,m,

, , _ , _ . _ _ . . , . , , _ _ . , . , , , , , - _

9 , . _