ML20004F092

From kanterella
Jump to navigation Jump to search
Forwards IE Safety Insp Rept 50-461/81-13 on 810518-20.No Noncompliance Noted
ML20004F092
Person / Time
Site: Clinton Constellation icon.png
Issue date: 06/09/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
Shared Package
ML20004F093 List:
References
NUDOCS 8106160496
Download: ML20004F092 (2)


See also: IR 05000461/1981013

Text

.

/

'o,,

UNITED STATES

!

NUCLEAR REGULATORY COMMISSION

n

$

E

REGION 111

.

8

790 ROOSEVELT ROAD

..,q

CLEN ELLYN lLLINCIS 00137

  • g

e

-. ,

og9

'JUN 0 9 580

m

<

,.

.,

)

,]

Docket No. 50-461

g

JUN 151981 *-

-

Illinois Power Company

C

ATTN: Mr. W. C. Gerstner

9 nerspumammanges

ff

8MI"'

Executive Vice President

500 South 27th Street

4

f

Decatur, IL 62525

l

te

I

Gentlemen:

'

,

,

This refers to the routine safety inspection conducted by Mr. C. M. Erb

,

l

of this office on May 18-20, 1981, of activities at Clinton Power Station,

Unit 1, authorized by NRC Construction Permit No. CPPR-137 and to the

l

disr.ussion of our findings with Mr. M. C. Hollow and others of your staff

,

ac the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

l

l

l

No items of noncompliance with NRC requirements were identified during

'

the course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you or

your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within seven (7)

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this office to withhold such infor-

mation. Section 2.790(b)(1) requires that any such application must be

accompanied by an affidavit executed by the owner of the information which

identifies the document or part sought to be withheld, and which contains

a full statement of the reasons on the basis which it is claimed that the

information should be withheld from public disclosure. This section further

ch

81oe,$cg

--

-

-

_

- -.

-- -

-

.

-

.

,

. .

.

Illinois Power Company

-2-

'JUN 0 9 IQBC

,

requires the statement to address with specificity the considerations. listed

in 10'CFR 2.790(b)(4). The information sought to be withheld shall be

incorporated as far as possible into a separate part of the affidavit.

If

we do not hear from you in this regard within the specified periods noted

above, a copy of this letter and the enclosed inspection report will be

placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

.

C. E. Norelius, Acting Director

Division of Engineering and

Technical Inspection

Enclosure: IE Inspection

Report No. 50-461/81-13

cc w/ encl:

DNB/ Document Control Desk (RIDS)

Resident Inspector, RIII

,

l

Mary Jo Murray, Office of

l

Assistant Attorney General

l

Gary N. Wright, Deputy

Director

Mr. Randell L. Plant, Prairie

Alliance

1

i

l

l

RIII

RIII

RI

I

RIII

D n1 . son

Spehr' a rd

Lid

le

s

6/4/81

3y

(q ')

4

-

. .

.

..

_

.

.-

-

-

. - - . .

-

..

-