[; ..g#o,,
.
-
.
-
UNITED STATES
!
NUCLEAR REGULATORY COMMISSION
,.,
g
O
j
REGION I
$31 PARK AVENUE
C(N
D
o#g
KING OP PRUS$1A, PENNSYl.VANIA 19406
JUN 011981
-
D'ocket Nos.
,
"' a@g
h 3'.,,2019816
-
Philadelphia Electric Company
C '%(e.p ;./
-i
ATTN: Mr. John S. Kemper
y
Vice President
_
\\
.
- ngineering and Research
-#[
2301 Market Street
Philadelphia, PA 19101
N _I\\
Gent 1; men:
Subject:
Combined Inspection 50-352/31-06 and 50-353/31-05
This refers to the routine safety inspection conducted by Mr. J. Dure of this
office on April 1-30, 1981 at Limerick Generating Station, Units 1 and 2,
Limerick, Pennsylvania of activities authori:ed by NRC License Nos. CPPR-106
and CPPR-107 and to the discussions of our findings held by Mr. Durr with Mr.
J. M. Corcoran of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inscection consisted of selective examinations of procedures
-
and representative records, interviews with personnel, measurements made by
the inspector, and observations by the inspector.
Based on the results of this inspection, it appears that certain of your
activities were not conducted in full compliance with NRC requirements, as set
forth in the Notice of Violation, enclosed herewith as Appendix A.
These
-
items of noncomoliance have been categori:ed into the levels described in the
Federal Register Notice (45 FR 66754) dated October 7, 1950. You are required
to respond to this letter and in preparing your response, you should follow
the instructions in Appendix A.
Item A in the Notice of Violation enclosed with this letter was identified
during a previous inspection of your liceased activities on October 15-31, and
November 1-15, 1979, and was documented in the enclosure to cur letter dated
January 11, 1980. Your letter to this office dated February 14, 1980 stated
that a design change was implemented to alleviate the restricted access welding
problem. Additionally, you stated that reinspections were performed to assure
nonconforming welds were corrected.
From our April 1-30, 1931 inspection it
appears that the stated corrective actions were not effective sinca this item
\\
l
.
819616e122
. _ _
..
_ - .
. .
-
.
.- -
.
-.
=
.
,
JUN 011981
Philadelphia Electric Company
2
has not been fully corrected. Recurrent and uncorrected items of noncompliance
are given additional weight in the consideration and selection of appropriate
enforcement action. Therefore, in your response to this letter, you should
give particular attention to those actions taken or planned to ensure that
identified items of noncompliance will be completely corrected and will not
recur.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosures will be placed in the NRC's Public Document
Room.
If this report contains any information that you (or your contractors)
believe to be exempt from disclosure under 10 CFR 9.5(a)(4). it is necessary
that you (a) notify this office by telephone within ten (10) days from the
date of this letter of your intention to file a request for withholding; and
(b) submit within 25 days from the date of this letter a written application
to this office to withhold such information.
Consistent with section 2.790(b)(1),
any such application must be accompanied oy an affidavit executed by the owner
of the information which identifies the document or part sought to be withheld,
and which contains a full statement of the reasons on the basis which it is
claimed that the information snould be withneld from public disclosure.
This
section further reouires the statement to acdress with specificity the consider-
ations listed in 10 CFR 2.790(b)(4).
The information sought to be withheld
shall be incorporated as far as possible into a separate part of the affidavit.
If we do not hear from you in this regard within the specified periods noted
above, the report will be placed in the Public Occument Room. The telephone
notification of your intent to request withholcing, or any request for an
extensic, of the 10 day period which you believe necessary, should be made to
the Supervisor, Files, Mail and Records, USNRC Region I, at (215) 337-5223.
Should you have any questions concerning this inspection, we will be pleased
_
to discuss them with you.
Sincerely,
.
.
,
R. R. Kei.' , Chi f
Projects Branch #2, Division of
Resident and Project Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Office of Inspection and Enforcement !nspection
Report Number 50-352/81-06 and 50-353/81-05
l
cc w/encis:
V. S. Boyer, Senior Vice Presicent, Nuc ar Power
.
,_
_ , _ _ .
..
_
,