g U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION IV i
Report No. 99900321/81-01 Program Ho. 51300 Company:
Ametek Incorporated Straza Division 790 Greenfield Drive El Cajon, California 92021 i
Inspection conduc+ad: March 23-26, 1981 i
Inspectors:
A MMd -[/
V. rf. Hunter, ContYactor Inspector Date i
Components Section Vendor Inspection Branch 1
2 SM 4 - \\ (.o - D Observer:
kv D. D. Oriskill, Investigator Date r
Investigation and Enforcement Staff 1
Approved by bw $A/L
.4. Ic - 4 (
- 0. E. Whitesell, Chief Oate j
Components Section Vendor Inspection Branch I
Summarv Inspection on March 23-26, 1981 (99900321/81-01) l Areas Inscected:
Implementation of 10 CFR Part 50, Appendix B, Criteria and Aoplicaole Coces and Standards including action on previous inspection findings; Authorized Nuclear Inspector Interface; Manufacturing Process Controls; and i
Nonconformance and Corrective Action Controls.
The inspection involved 48 inspector hours on site by one NRC inspector and one NRC investigator.
Results:
In the three areas inspected there were no nonconformances or
}
unresolved items identified.
l I
8106150 @
2 i
DETAILS r
A.
Principal Persons Contacted r
1.
Ametek/Straza 1
S. Walker, President H. Krickhahn, Vice President, Operations l
R. E. Davis, Vice President, Mecnanical W. J. Peet, Quality Assurance, Director M. E. Brown, Quality Assurance Manager i
R. L. Sullivan, Manager, Nuclear Construction i
2.
State of California V. K. Rez, Senior Safety Engineer J. Berggreen, Authorized Nuclear Inspector All of the above personnel attended the exit meeting.
B.
Vendor Activities Straza is a division of Ametek, Incorporated, employing a total of 750 technical and administrative personnel.
The facility covers approximately 262,300 square feet and is self conta'ned in that all ASME required services, i.e., design, welding, machining, hydrostatic testing, NDE, f
and stress relieving are provided.
[
t Straza Division maintains ASME Certificate of Authorization N-2453 (NPT) for Class 1, 2, 3 and MC vessel parts and appurtenances and' component supports; Class 1, 2, and 3 Valve parts and appurtenances and piping subassemblies and Class 2 and 3 storage tank parts and apportenances.
I This certificate of Authorization expires on Decemcer 5,1983.
I Straza has manufactured such components as-1.
Main Steam line torsional surround structures.
2.
Pipe saddle supports.
3.
Torsional restraint forgings.
4.
Integral attachment pipe restraints and supports.
5.
550 tons of various fabricated pipe stop forgings and structured steel supports.
,,..-s.
3 6.
Containment piping penetrations.
7.
Main steam line restraint forgings.
8.
Expansion joints (bellows).
9.
Fuel Transfer tubes.
10.
Prestressed concrete reactor vessel insulation system.
11.
System of multi-walled and insulated Hastelloy x helium transition ducts.
The above types of components are less than 10% of Straza capacity and have been supplied to 19 commerical Nuclear Power Plant;.
C.
Action on Previous Insoection Findings 1.
(Closed) Deviation (Item A, Notice of Deviation, Inspection Report No. 99900321-80-01):
It was verified that the tool in question was not used for Nuclear Construction and, the technician is now required to send a memo to the QA Manager when tools cannot be readily located.
2.
(Closed) Deviation (Item B, Notice of Deviation, Inspection Report No. 99900321-80-01):
It was verified that a serial number log was developed that included a completa inventory of all tools in the tool and gage room.
The log was finalized and implemented as of September 22, 1980.
D.
Authorized Nuclear Insoector (ANI) Interface 1.
Objectives The objectives of this area of the inspection were to ascertain whether procedures had been preparco and approved, which describe the system to be implemented fci-tne achievement of interface activities with the ANI, and that the identified activities are consistent with the NRC rules, Code requirements, and the QA Pro-gram commitments.
2.
Method of Accomolishment The objectives of this area of the inspection were accomplished
- folicws
a.
Review of Section 16.0 of the ASME accepted QA manual to ascertain whether the system provides for interface with the l
1 4
ANI and/or the Authorized Inspection Agency (AIA) to review the Design Specification (05), and provide the inspection services, required by code, of all code items covered by the customer's order and 05.
b.
Review of seven rejection tags to verify that the ANI is notified of all rejection or scrap items as indicated on Nonconforming Material Report Tag, where the ANI previously participated in acceptance of quality actions.
Also, to verify that Material Review Board Report indicating its recommended corrective actions are made available for review by the ANI and the review documented.
Review of three design change notices to verify that changes in the customer's design specifications (05) are reviewed with the ANI to inform him of the status of the inspections and tests of the items when it is removed from the manufacturing process.
c.
Review of the ANI's Daily Log Book to verify that he identifies his review of the 05, drawings, QC checklists, weld procedures and qualification records of welders and NDE personnel.
- Also, that he witnesses all required hydrostatic. tests.
3.
Inscection Findings a.
The Authorized Inspection Agency is the State of California witn an ANI provided four hours per day.
b.
The ANI activities as documented in his bound log book, and by documents reviewed, supports the finding that the vencor is properly implementing its interface responsibilities with the ANI in a manner consistent with the NRC rules, Code require-ments and its QA program commitments.
E.
Manufacturing Process Controls 1.
Objectives The objectives of this area of the inspection were to verify that the vendor's manufacturing processes were performed under a con-trolled system which meets the NRC rules and regulations, ASME Code requirements, the vendor's commitments in his ASME acceptec Quality Assurance Program, and contract requirements.
2.
Method of Accomolishment The objectives of this area of the inspection were accomplished by:
5 a.
Review of the ASME accepted Quality Assurance Manual, Section 6.0 titled " Manufacturing Control" to verify that the control system requires shop travelers or process control check lists to be prepared which identifies the document numbers and revi-sions to which the process must conform.
Also to verify that all processes and tests are to be performed by qualified per-sonnel using qualified procedures.
b.
Review of Operation Travelers (OT), or process control check lists, to verify that spaces are provided for reporting the results of specific operations, or reference to other documents where the results are maintained.
Also that it includes space for the signoff by the vendor, indicating the date on which the operation or test was performed, and space for signoff and date, by the authorized nuclear inspector, to document his acceptance of activities that he has selected as mandatory hold points, c.
Review selected OT's 2-157 and 2-158 to verify their compliance with the above referenced procedures, and the overall QA Program documentations requirements, including mandatory hold points established by the Authorized Nuclear Inspector.
d.
Review of selected portions of the following procedures:
(1) UT-8-530271 (2) LP-8-530263 (3) LP-8-530264 (4) Weld-SMAW, NUC-120 (5) Weld-GTAW, NUC-124 (6) Weld-SAW, NUC-141 (7) Weld-GMAW, NUC-152 to verify that they had been prepared, qualified, and imple-mented in accordance with the QA Program requirements.
e.
Observation of r-diography of Type II mechanical penetration, Part No. 7-050357-1, welds two and four, in accordance with procedure 8-530268, revision two and technique sheet 9RT-191.
f.
Observation of liquid penetrant test of pipe stop No. 7-050311, S/N nine in accordance with AWS 01.1.
6 g.
Review of radiographs for welds one and two of Type I penetration in accordance with procedure 8-530268, revision two and supple-ment three.
h.
Observed welding of pipe step No. 7050311-3 in accordance wit 5 AWS 01.1.
3.
Inspection Findings s
Within the area inspected there were no nonconformances or unresolved items identified.
F.
Nonconformance and Corrective Action Controls 1.
Objectives The oojectives of this area of the inspection were to verify that:
a.
Procedures had been developed and approved by the vendor that prescribes a system for control of nonconformances and assures effective corrective action in a manner consistent with NRC rules and regulation, ASME Code requirements, and the vendor's commitments in the ASME accepted Quality Assurance Program.
b.
The nonconformance and corrective action procedures are properly and effectively implemented by the vendor.
2.
Method of Accomolishment The objectives of this area of the inspection were accomplished by:
a.
Review of Section 12.0 of the ASME accepted QA manual to verify that the vendor had established a procedures system for identi-fying, reporting, disposition, preventive actions for noncon-formances.
b.
Review of the following:
(1) Nonconformance Report Log for 1981 (2) Three in process rejection tags (3) Nonconformance Inspection Reports IR-57484, IR-55795, IR-57488, IR-57504 and IR-54369 (4) Four Material Review Board actions for 1981.
=
7 l
To verify that nonconformancer are identified and timely corrective and preventive actions are implemented.
3.
Inspection Findings Within the area inspected there were no nonconformances or unresolved i
items identified.
G.
Exit Interview l
The inspector met with management representatives at the conclusion of the inspection on March 26, 1981.
The inspector summarized the scope and findings identified during the inspection.
Management acknowledged the inspector's comments regarding tha scope and findings as presented.