Forwards IE Insp Repts 50-546/81-07 & 50-547/81-07 on 810427-29.No Noncompliance Noted
ML20004E572
Person / Time
Site: Marble Hill
Issue date: 05/29/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
Shared Package
ML20004E573 List:
References
NUDOCS 8106120349
Download: ML20004E572 (2)


See also: IR 05000546/1981007

Text

.

.

g/[

jo

UNITED STATES

NUCLEAR REGULATORY COMMISSION

,

g

REGION 111

r

Q,

'[

7M ROOSEVELT ROAD

GLEN ELLYN,ILLINOls So137

% * . . .

e

MAY 2 g a

/cd

'E, b

'a

Docket No. 50-546

Docket No. 50-547

s

hf

[2

d'f/ J

1

Public Service of Indiana

$

ATTN:

Mr. S. W. Shields

9' "'4 g%, 708f A [

Senior Vice President

Nuclear Division

b

Post Office Box 190

g

,p

New Washington, IN 47162

j41

s \\ ' ', '

E#

Gentlemen:

This refers to the routine safety inspection conducted by Mr. C. M. Erb

of this office on April 27-29, 1981, of activities at the Marble Hill

Nuclear Generating Station, Units 1 and 2, authorized by NRC Construction

Permits No. CPPR-170 and No. CPPR-171 and to the discussion of our findings

with Mr L. O. Ramsett and others of your staff at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted of a

selective examination of procedures and representative records, observations,

and interviews with personnel.

O

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

i

l

In accordance with 10 CFR 2.790 of the Consnission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room. If this report contains any information that

you or your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone

within seven (7) days from the date of this letter of your intention to

file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office to

withhold r.uch information. Section 2.790(b)(1) requires that any such

application must be accompanied by an affidavit executed by the owner of

the information which identifies the document or part sought to be withheld,

and which contains a full statement of the reasons on the basis which it

is claimed that the information should be withheld from public disclosure.

\\

,

81061PU3 N

Q

( Ihd

.

,

I

MAY 2 9 1981

Publ.ic Service of Indiana

-2-

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter and the enclosed

inspectica report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning_ this inspection.

Sincerely,

'

C. E. Norelius, Acting Director

Division of Engineering and

Technical Inspection

Enclosure:

IE Inspection

Reports No. 50-546/81-07

and No. 50-547/81-07

.

cc w/ enc 1:

W. M. Petro, Project

Director

C. Kammerer, CA

J. H. Sniezek, IE

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

LeBoeuf, Lamb, Leiby & MacRae

Dave Martin, Office of

Attorney General

,

John R. Galloway, Staff Director,

Environment, Energy and Natural

Resources Subcommittee

E. P. Martin, Wabash Valley

Power Association

i

1

RIII

RIII

RII

RIf

RII

br

n

Sp sard

ttle

Norelt s

db

g/Af//p/

$>f

5/26/81

. .

.

__

_ . _ _

_

.

.

_

.

.

.

. . .

..

.

.0