Forwards IE Insp Rept 50-298/81-07 on 810405-0502.No Noncompliance Noted
ML20004E562
Person / Time
Site: Cooper Entergy icon.png
Issue date: 05/27/1981
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20004E563 List:
References
NUDOCS 8106120339
Download: ML20004E562 (2)


See also: IR 05000298/1981007

Text

'

.

W

UNITED STATES

e

NUCLEAR REGULATORY COMMISSION

3#

'

/

REGION IV

.

/

611 RYAN PLAZA DRIVE. SulTE 1000

1.....-

ARUNGToN, TEXAS 76011

_

May 27, 1981

pt IBf

In Reply Refer To:

eO

4

/Y

h

dihD

Docket: 50-298/81-07

Nebraska Pitblic Power District

ct1

.

ATTN: Mr. J. M. Pilant, Director

-\\

Dj

)

Licensing and Quality Assurance

c)

l

P. O. Box 499

'

l

Columbus, Nebraska 68601

l

Gentlemen:

This refers to the inspection conducted by Messrs. D. L. DuBois and G. L.

Constable of this office during the period April 5 - May 2,1981, of activities

authorized by NRC Operating License DPR-46, and to the discussions of the

l

findings with Mr. L. C. Lessor,

l

Areas examined during the inspection and our findings are discussed in the

l

enclosed inspection report. Within these areas, the inspection censisted

l

of selective examination of procedures and representative records, inter-

views with personnel, and observations by the inspectors.

,

Within the scope of the inspection, no violations or deviations were identified.

In accordance with 10 CFR 2.790 of the Ccmmission's regulations, a copy of

this letter and the enclosed inspection report will g placed in the NRC's

Public Document Room.

If this report contains any Ynformation that you

l

believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary

I

that you (a) notify this office by telephone within 10 days from the date of

this letter of your intention to file a request for withholding; and (b) sub-

mit within 25 days from the date of this letter a written application to this

office to withhold such information.

If your receipt of this letter has been

delayed such that less than seven days are available for your review, please

notify this office promptly so that a new due date may be established.

!

I

Consistent with Section 2.790(b)(1), any such application must be acccmpanied

by an affidsvit executed by the owner of the information which identifies the

document or part sought to be withheld, and whicn contains a full statement

l

of the reasons on the basis which it is claimed that the information should be

,

withheld from public disclosure. This section further requires the statement

l

to address with specificity the considerations listed in 10 CFR 2.790 (b)(4).

The infonnation sought to be withheld shall be incorporated as far as possible

'

into a separate part of the affidavit.

If we do not hear frem you in this

regard within the specified periods noted above, the report will be placed in

I

the Public Document Room,

l

i

.

1

8106120339

Q

._

__

-

-

_

_..

-

- _ . - _ .

-

.

_

_

-

.

.

Nebraska Public Power District

2

May 27,1981

!

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

A

.

G. L. Madsen, Chief

Reactor Project Branch

Enclosures:

Inspection Report 50-298/81-07

-

'

cc w/ enclosure

L. C. Lessor, Superintendent

Cooper Nuclear Station

P. O. Box 98

Brownville, Nebraska 68321

,

0

)

,

- . - , , ,

-,---.,..-,------..,-,,.-_.---,__.,_,-,-,,,--..,n

,,.,,,_,...n.,,

. . , , . , , , , . _ . - , , . . . . - . , - - , . , , . . , , , , , , .

.