ML20004E495
| ML20004E495 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 05/29/1981 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20004E496 | List: |
| References | |
| NUDOCS 8106120263 | |
| Download: ML20004E495 (2) | |
See also: IR 05000456/1981005
Text
-
pmB
.
.
.
UNITED STATES
8',,
NUCLEAR REGULATORY COMMISSION
~ -
I
REGION 111
U
7,e noostvtLT noe
Y%....+,/
OLEN ELtvN,ILLtNots ecu7
- 1g gf,
d' b/Q
f \\,\\
'/
Docket No. 50-456
-
. ' u.,. Do4**eJtjpg
._
m2
Docket No. 50-457
-
Commonwealth Edison Company
'%
/
,
'
ATTN:
Mr. Cordell Reed
'-N
Vice President
(*
'
Post Office Box 767
D,d
.
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. J. F. Schapker
and R. L. Lee of this of fice on April 27, through May 1,1981, of activities
at Braidwood Station, Units 1 and 2, authorized by NRC Construction Permits
No. CPPR-132 and No. CPPR-133 and to the
ussion of our findings with
Messrs. R. Cosaro and T. R. Sommerfield .
ehe conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inrpection. k'ithin these areas, the inspection consisted of a selective
er. amination of procedurec and representative records, observations, and
interviews with personnel.
l
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
l
l
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you or
!
your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
l
it is necessary that you (a) notify this office by telephone within seven (7)
I
days from the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days from the date of
this letter a written application to this office to withhold such infor-
Section 2.790(b)(1) requires that any such application must be
mation.
accompanied by an af fidavit executed by the owner of the information which
identifies the document or part sought to be withheld, and which contains
a full statement of the reasons on the basis which it is claimed that the
information should be withheld from public disclosure. This section further
\\
i
t
t
"1 ocis ox3
.
.
gM 2. 9 N
Commocwealth Edison Company
-2-
requires the statement to address with specificity the considerations listed
in 10 CFR 2.790(b)(4). The information sought to be withheld shall be
incorporated as far as possible into a separate part of the affidavit. If
we do not hear from you in this regard within the specified periods noted
above, a copy of this letter and the enclosed inspection report will be
placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
h + +:c - M.- h
'
r
C. E. Nor"elius, Acting Director
Division of Engineering and
Technical Inspection
Enclosure:
IE Inspection
Report No. 50-456/81-05
and No. 50-457/81-05
cc w/ enc 1:
J. S. Abel, Director
of Nuclear Lice >.ing
!
R. Cosaro, Project
!
Superintendent
V. I. Schlosser,
Project Manager
J. F. Gudac, Station
Superintendent
Central Files
Reproduction Unit NRC 20b
Local PDR
l
Mary Jo Murray, Office of
Assistant J.ttorney General
!
.
--
.-. - .
- . - -
-
. - .-
-__
_ -
- _ - .
- - _ - - -
. - . -