Forwards IE Safety Insp Repts 50-327/81-17 & 50-328/81-19 on 810421-24.No Noncompliance Noted
ML20004E490
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/18/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20004E491 List:
References
NUDOCS 8106120256
Download: ML20004E490 (2)


See also: IR 05000327/1981017

Text

.

.

~

% 9

.

..

4

UNITED STATES

,F

7.,

NUCLEAR REGULATORY COMMISSION

,

,.!

E

REGION 11

'i(

totMAn ETTA sT N.W SulTE 3100

g

,/

ATLANTA. GEORGIA 30303

MAY 181981

  • -
1>.,

(f \\ [#

Tennessee Valley Authority

ATTN: Mr. H. G. Parris

g

,

Manager of Power

-

S

.. N .ck

-

500A Chestnut Street Tower II

T

$'g7

Chattanooga, TN 37401

Gentlemen:

%[

f

Wj

n3 .k

Subject: Report Nos. 50-327/01-17 and 50-328/81-19

This refers to the routine safety inspection conducted by Mr. G. L. Troup of this

office on April 21-24, 1981, of activities authorized by NRC Operating License

No. OPR-77 and Construction Permit No. CPPR-73 for the Sequoyah facility and to

the discussion of our findings held with Mr. J. M. McGriff, Jr., at the conclu-

sion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclored inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from

disclosure under 10 CFR 9.5(a)(4), it is necessary that you:

(a) notify this

office by telephone within ten days from the date of this letter of your

intention to file a request for withholding; and (b) submit within twenty-five

days from the date of this letter a written application to this office to

withhold such information. If your receipt of this letter has been delayed such

tnat less than seven days are available for your review, please notify this

office promptly so that a new due date may be established.

Consistent with

section 2.790(b)(1), such application must be accompanied by an affidavit

executed by the owner of the information which identifies the document or part

thereof sought to be withheld, and a full statament of the reasons on the basis

of which it is claimed that the information should be withheld from public

disclosure.

This section further requires the statement to address with

specificity the considerations listed in 10 CFR 2.790(b)(4).

The information

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within the

specified periods noted above, the report will be placed in the Public Document

Room.

\\

h m

WAY 181981

-

.

. .

.

Tennessee Valley Authority

2

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

/

e wewi y, Resident andBetingeir#ctor

Division of

Reactor Project Inspection

Enclosure: Inspection Report Nos.

50-327/81-17, and 50-328/81-19

cc w/ encl:

H. J. Green, Division Director

G. G. Stack, Project Manager

J. M. Ballentine, Plant

Superintendent

J. F. Cox, Supervisor, Nuclear

Licensing Section

M. J. Burzynski, Project Engineer

H. N. Culver, Chief, Nuclear Safety

.

Review Staff

,

s

-