Text
.
.
~
% 9
.
..
4
UNITED STATES
,F
7.,
NUCLEAR REGULATORY COMMISSION
,
,.!
E
REGION 11
'i(
totMAn ETTA sT N.W SulTE 3100
g
,/
ATLANTA. GEORGIA 30303
MAY 181981
- -
- 1>.,
(f \\ [#
Tennessee Valley Authority
ATTN: Mr. H. G. Parris
g
,
Manager of Power
-
S
.. N .ck
-
500A Chestnut Street Tower II
T
$'g7
Chattanooga, TN 37401
Gentlemen:
%[
f
Wj
n3 .k
Subject: Report Nos. 50-327/01-17 and 50-328/81-19
This refers to the routine safety inspection conducted by Mr. G. L. Troup of this
office on April 21-24, 1981, of activities authorized by NRC Operating License
No. OPR-77 and Construction Permit No. CPPR-73 for the Sequoyah facility and to
the discussion of our findings held with Mr. J. M. McGriff, Jr., at the conclu-
sion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclored inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
Within the scope of this inspection, no violations or deviations were disclosed.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this
office by telephone within ten days from the date of this letter of your
intention to file a request for withholding; and (b) submit within twenty-five
days from the date of this letter a written application to this office to
withhold such information. If your receipt of this letter has been delayed such
tnat less than seven days are available for your review, please notify this
office promptly so that a new due date may be established.
Consistent with
section 2.790(b)(1), such application must be accompanied by an affidavit
executed by the owner of the information which identifies the document or part
thereof sought to be withheld, and a full statament of the reasons on the basis
of which it is claimed that the information should be withheld from public
disclosure.
This section further requires the statement to address with
specificity the considerations listed in 10 CFR 2.790(b)(4).
The information
sought to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within the
specified periods noted above, the report will be placed in the Public Document
Room.
\\
h m
WAY 181981
-
.
. .
.
Tennessee Valley Authority
2
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
/
e wewi y, Resident andBetingeir#ctor
Division of
Reactor Project Inspection
Enclosure: Inspection Report Nos.
50-327/81-17, and 50-328/81-19
cc w/ encl:
H. J. Green, Division Director
G. G. Stack, Project Manager
J. M. Ballentine, Plant
Superintendent
J. F. Cox, Supervisor, Nuclear
Licensing Section
M. J. Burzynski, Project Engineer
H. N. Culver, Chief, Nuclear Safety
.
Review Staff
,
s
-
_