ML20004E398

From kanterella
Jump to navigation Jump to search
Notice of Nonconformance from Insp on 810331-0403
ML20004E398
Person / Time
Issue date: 04/16/1981
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20004E390 List:
References
REF-QA-99900501 NUDOCS 8106120130
Download: ML20004E398 (1)


Text

.

O Deebtel Power Corporation Ann Arbor Pcwer Division Docket No. 99900501/81-01 NOTICE OF NONCONFCRM-NuE 3ased cr. the results of an NRC ins;ecticn conducted on March 31 - Acril 3,1981, it accears that certain of your activities were not conducted in accorcance with NRC requirements.

Criterien V of Appendix 3 to 10 CFR Part 50 states:

" Activities affecting quality shall be crescribed by documented instructions, procedures, or drawings, of a type accrocriate to the circumstances and shall be acccmolished in accorcance with these instructions, crecedures, and drawings.

Instructions, cro-cedures, or drawings shall incluce aporopriate cuantitative or qualitative acceptance criteria for determining that imcortant activities have been satisfactorily acccmolished."

Identified nonconformances are:

Sechtel Engineering Decartment ?rececure EDP 5.13 entitled, " Control Logs,

lists in Exhibit A that Logs such as drawings, CCN's, and Scecifications, sill be uodated and issuec cn a monthly basis by Project Administration on the Midland Project.

Centrary to the acove, the Crawing Centrol L0g and Materials Recuisition/Scec.

Leg (CEEUS) have not been ucdated and issued en a mcnthly basis.

Scecifically,

nese icgs were not uodated and issued for the month of Fecruary.

f 810612 0l)3lCI

_