First Interim Part 21 Rept Re Pressure Operated Relief Valve Operating Time Initially Reported on 810424.Mod to Valve Actuator to Allow Less Airflow Restriction to Diaphragm Proposed.Next Rept to Be Submitted by 810608
ML20004E266
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 05/26/1981
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-PT21-81-434-000 10CFR-050.55E, 10CFR-50.55E, PT21-81-434, PT21-81-434-000, SQRD-50-328-81, NUDOCS 8106110448
Download: ML20004E266 (3)


Text

m

-4 TENNESSEEhALLEY AUTHORITY r.s,

T' CH ATTANOOGA. TENNESSEE 374ot 400 Chestnut Street Tower II May 26, 1981 SQRD-50-328/81-35 N

Mr. James. O'Reilly, Director Office of spection and Enforcement U.S. Nuclear egulatory Consnission Region II - St.4te 3100 101 Marietta St eet g

Atlanta, GeorgiaS30303

Dear Mr. O'Reilly:

i SEQUOYAH NUCLEAR PLANT UNIT 2 - PORY OPERATING TIME - SQRD-50-328/81-35

- FIRST INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector l

R. V. Crlenjak on April 24, 1981 in accordance with 10 CFR 50.55(e) as HCR SQN KEB 8122. Enclosed is our first interic report. We expect to submit our next report by June 8,1981. We consider 1C CFR 21 applicable to this deficiency.

If you have any questions, please get in touch with D. L. Lambert at FTS 857-2581.

Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, Manager Nuclear Regulation and Safety Enclosure Mr. Victor Stello, Director (Enclosure), f V

cc:

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 l

An Equal Opportunity Emp; oyer

~

, b',

ENCLOSURE SEQUOYAH NUCLEAR PLANT UNIT 2 PORV OPERATING TIME SQRD-50-328/81-35 10 CFR 50.55(e)

FIRST INTERIM REPORT Description of Deficiency The operational time requirement for the pressurizer PORV is two seconds maximum as stated in the FSAR (section 5.2.2.4.2).

However, the actual operating time for the Copes-Vulcan PORV installed in unit 2 has been showr; during preoperational testing to be approximately five to six s econds. The Westinghouse analysis of cold overpressurization transients assumed a PORV operating time of two seconds. Therefore, the current operating time of five to six seconds could have resulted in RCS pressure transients (which the low temperature overpressurization provisions were designed to prevent) outside the analysis. Tne deficiency is thought to be caused by excessive airflow restriction. The PORV's at

-Sequoyah Nuclear Plant (SNP) unit 1 and Watts Bar Nuclear Plant are Masoneilan valves such that this applies only to SNP unit 2.

Corrective Action TVA has proposed to modify the valve actuator to allow for less airflow restriction to the diaphragm actuator.

TVA is awaiting Westinghouse approval of the proposal, after which the valves will be modified and retested.

4 y,.

.,....,y,

,, m,__

,-,py_

r,,

.._._u

$ ART 21 IDENTIFICATION NO. 8/

D Ao o a CCFPAW l@!E N

DATE OF IEITia f/2A/N D00(ET NO. Io - 3 N

/

/

IRTt DISTRIBUTED ORIGINALREPORT r. -'SlPPLE!i34TARf DISTRIBUTION:

PEACTOR CR)

FLEL CYCLE &

SAFECCARDS (S)

IE FILES FMTERIALS (FD IE FII.ES EES '

)

IE FILES AD/SG AD/FRSI A9/ROI PIGIONS I,II,III,IV,V PEGIONSI,II,III,IV,V PEGIONS I,II,III,IV,V VSO3R BR. R-IV VEIODR BR. R-IV VSiD3R BR. R-IV LO B / tPA FIG 5715 MES / FOS SS-395 tag /j)yu AEOD FIG 7602 LE / FPA f,iG 5715 N SS / SG SS-881 G

s mm 7zn N

AECO FIG 7502 LE / FPA f4G 5715 OtadTys mor 7zr1 e

IEP/DSI ASLB? E/R 450 AEOD FIG 7602 tiRP/ DST Ctfodunk. rnrr6 7z.n

~

SAo/SP tiG-7210A ASB?

E/W 450 -

NRP/D3L CSiTP L FILES 016 ENTPAL FILES 016 ASLBP E/W 450 CENTRAL FILES ( C EiO CBERAL FILES (GR0fD CSliRAL FILES 016 PDR m

CENTPAL FILES SS-395 CaiTPAL FILES (GR0bD LPDR F

y E@g PDR TERA R

y q

f f..gh$

Y L%

W Wie 1,

e ACTION:

PRELIt41 NARY EVALUATION OF THE' ATTACHED REo0RT ITOICATES L FO'J OWJ? AS SFOhN BELOW:

IE NRR ifSS [

GTHER

~

EES PEVo 8/1/E