Forwards IE Insp Rept 50-271/81-05 on 810302-31.No Noncompliance Noted
ML20004E084
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 05/20/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Rich Smith
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20004E085 List:
References
NUDOCS 8106110127
Download: ML20004E084 (2)


See also: IR 05000271/1981005

Text

'

g

UNITED s~ATES

NUCLEAR REGULATORY COMMISSION

-

o

U

j

REGION I

&

631 PARK AVENUE

@

D

KING OF PRUS$1A,PENNSYf.VANIA 19406

o

MAY 2 01981

  • M

Docket No. 50-271

Y

/h

Vermont Yankee Nuclear Power Corporation

y N

!

ATTN: Mr. Robert L. Smitit

Y

,

g

i

Licensing Engineer

m

!

Framingham, Massachusetts 01701

- g

1671 Worcester Road

@

'

,,w

b

Gentlemen:

.

9

4

l

Subject:

Inspection 50-271/81-05

t

!

This refers to the inspection conducted by Mr. W. Raymond of this office on

!

March 2-March 31, 1981, at Vemont Yankee Nuclear Power Plant, Vernon,

Vermont, of activities authorized by NRC License No. DPR-28 and to the

discussions of our findings held by Mr. Raymond with Mr. W. Murphy and

cther members of your staff at the conclusion of the inspection.

Area examined during this inspection are described in the Office of Inspection

and Enforc=anc Inspection Report which is enclosed with this letter. Within

i

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Our inspector also verified the steps you have taken'to correct the item of

l

noncompliance brought to your attention in our letter dated September 5,1978.

l

We have no further questions regarding your actions at this time.

!

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

l

l

inspection report will be placed in te NRC's Public Document Room.

If this

report contains any infomation that you (or your contractor) believe to be

'

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must be acccmpanied by an affidavit executed by the owner of the

infomation, which identifies the document or part sought to be withheld, and

which contains s statement of reasons which addresses with specificity the items

which will be considered by the Commission as listed in subparagraph (b) (4) of

Section 2.790. The infomation sought to be withheld shall be incorporated as

far as possible into a separate part of the affidavit.

If we do not hear from

you in this regard within the specified period, the report will be placed in

the Public Document Rocm.

f)

\\

9,

i

!

8106110/,2h

-

-

- -

- .

-

-.

.-

1

l

.

.

.

.

l

Vermont Yankee Nuclear Power Corporation

2

MAY 2 0 1961

No reply to this letter is required; however, if you should have any

questions concerning this inspection, we will be pleased to discuss them

j

with you.

Sincerely,

.

,

> ; , = ---

Eldon J. Brunne , C ef

Reactor Projects Branch #1

Division of Resident and

Project Inspection

Enclosure: Office of Inspection and Enforcement

Inspection Report No. 50-271/81-05

cc w/ encl:

l

Mr. W. P. Murphy, Plant Superintendent

l

Mr. W. F. Conway, Vice President and Manager of Operations

Mr. J. E. Griffin, President

Mr. L. H. Heider, Vice President

.

!

!

l

l

l

!

,_

_.

. .

__

_

_ _ . . _ . . . . .

_ _. ___