Text
.
3 ELATED C.T.tW - W ' '"
CC O:'~T MUM 2E2 PRCD.L UT!L FAC.b.khk mc UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION -
BEFORE THE COMMISSION
- gt4flg
\\.' >\\
4 COMMISSIONERS:
s h" Hendrie, Chairma M.dP 3M @ h"tg
' f, JUN b
itaMSG.,
c s
Joseph M.
I a tgg;, Q Victor Gilinsky
%03 h}
cmce etttwse, 1
Peter Bradford N
John F. Ahearne
/
=5 s.
Tay ss=.
D,.a* * = +e 3
In the Matter of
) h SERV"rn Jyy 8 JS$f FEDERAL TORT CLAIM OF GENERAL
)
PUBLIC UTILITIES CORP., ET AL.
)
)
MEMORANDUM AND ORDER (CLI-81-101 On Decemher 9, 1980, the licensees authorized to operate Three Mile Island Unit No. 2 and their parent company submitted an administrative claim to NRC under the Federal Tort Claims Act re over $4,010,'000,000.00 in property (28 U.S.C.
52671 e ec ) t
~ 2a5tage's whic'htl1 sy assert they have sustained as a result of the
~
March 28, 1979 recident at TMI-2. 1/
The claimants are the General Public 'tilities Corporation ("GPU") and its operating subsidiaries, iersey Central Power & Light Company ("JCP&L"),
l_/
An account of the accident's events and consequences can be found in any of the several major investigations of it.
- See, for example, Three Mile Island, A Report to the Commissioners and to the Public, January 1930; Reoort of the President's Commission on the Accident at Three Mile Island, October 1979; Investigation into the March 23, 1979 Three Mile Island Accident by Office of Inspection and Inforcement (Investigative Rept No. 50-320/79-10), August 1979; Nuclear Accident and Recovery at Three Mile Island: A Report Prepared by the Subcommittee on Nuclear Regulation for the Committee on Environment and Public Works of the U.S.
Senate, June 1980; TMI-2 Lessons Learned Task Force Final Retort, August 1979; TMI-2 Lessons Learned Task Force Status Reoort and p
O Short-Term Recommendations, July 1979.
g t
810 610 0 '2 dot
- n n n D flD D M M h C1 FUUl\\ UnUnn.
m 2
P Metropolitan Edison Company
(" Met-Ed"), and Pennsylvania Electric Company ("Penelec").
The operating subsidiaries are co-owners and co-licensees of TMI-2.
Met-Ed is the operator of TMI-2.
The claimants assert that NRC was negligenu in the per-formance of its regulatory duties respecting TM.*.~-2 and that such negligence was a proximate cause of the accident.
More particularly, they claim that NRC failed to review with due care certain equipment, analyses, proc dures, and training before licensing TMI-2 on February 8, 1978, and failed to warn them of defects affecting TMI-2 of which NRC was, or should have been, aware.
1.
The GPU claim resta on two general assertions.
- First, the claim asserts that NRC' negligently failed to warn GPU or Met-Ed of defects in the equipment, analyses, procedures, and training supplied.for,TMI-2_ and_neg_lig_ently failed to direct Met-Ed to implement new operating requirements to correct these deficiencits.
Claimants contend that NRC maintains a aprehensive system to collect, analyze, and disseminate data derived from the operating experience of all nuclear reactors in the United States.
They claim that they relied on NRC to warn them of any adverse condition that might require corrective action at TMI-2.
They contend that NRC failed to fulfill its obligation by negligently failing to investigate, analyze, and warn them of the " Davis-Besse Incident,"
an " accident that closely paralleled the events which occurred 18 months later at TMI-2."
3 On September 24, 1977, while operating at less than 10% of full power, the Davis-Besse I nuclear plant experienced a loss of feedwater and turbine trip.
Claimants assert that the sequehce of events that followed was a precursor to TMI-2:
The pi.ot-operated relief valve ("PORV") on the pressurizer automatically opened and subsequently failed to close, leading to a loss of reactor coolant; high-pressure injection ("HPI") of new coolant activated automatically, but was terminated by operators who, unaware of the open PORV, secured HPI based on pressurizer water level indications alone.
Davis-Besse officials discovered the open PORV approximately 22 minutes into the incident and immediately shut the PORV block valve.
Following other actions including the manual resti.rting of HPI, the plant resumed a stable condition without damage to the reactor. 2/
--. - =,-
Claimants maintain that, as a result of the Davis-Besse
~'inciden't','NRC'khew or should have known 6f defects in (i) ecuip-ment application and instrumentation relating to the PORV, (ii) analyses of potential small coolant breaks and openings at the top of the pressurizer, (iii) procedures and training for plant operators, and (iv) operating and emergency procedures regarding the HPI system.
The failure of NRC to notify Met-Ed
-2/
At TMI-2, the PORV was stuck in the open position for more than two hours.
Med-Ed officials failed to realize that the valve had not shut.
Reactor operators turned off one HPI pump and reduced the flow from a second pump early in the accident sequence.
HPI was !cc restored until almost an hour af ter the PORV block valve was closed.
Substantial damage was done to the reactor.
i 4
4 P
adequately of these " generic problems" was, th'ey claim, a proxi-mate cause of the accident at TMI-2.
The second general assertion of the claim is that NRC negli-gently performed its regulatory review of equipment, analyses, procedures, and training supplied for TMI-2 when it licensed the plant's operation.
Claimants contend that they relied on NRC to perform with due care the regulatory review required by statute of the safety and safeguards of all facilities, materials, and activities associated with nuclear power plant construction and operation.
They argue that NRC negligently reviewed and approved (i) transient analyses relating to small-break loss-of-coolant accidents ("LOCA") and loss of normal feedwater which were inadequate as a basis for plant design and for development of operating procedures, and operator training programs, (ii) procedures for operating TMI-2 which were later used by operators during the accident and which incorrectly proscribed filling the pressurizer
" solid" with water and risked uncovering the core during a small-break LOCA, (iii) equipment, analyses, and procedures which relied on repeated, correct operation of the PORV which NRC knew, or should have known, incurred prior failures, and (iv) the licensing of operators who were not properly trained to respond to the events that occurred at TMI-2 on March 28, 1979.
2.
The claim is without merit.
The claim is at cdds with the regulatory framework flowing from the Atomic Energy Act of 1954, as amended.
Within that framework, the regulated industry (i.e.,
the licensees and their suppliers and consultants) bears 1
f:
S the primary responsibility for the proper construction and safe operation of licensed nuclear facilities.
The Nuclear Regulatory Commission has the statutory responsibility for prescribing licensing standards to protect public health and safety and for inspecting industry's activities against these standards.
The
- Commission does not thereby certify to the industry' that the industry's designs and procedures are adequate to protect its equipment or operations.
This is the understanding that prevailed when NRC issued the licenst to operate TMI-2, as it had for more than 20 years of commercial nuclear plant' licensing and as it continues to prevail today.
Therefore the claim is denied.
- It is so ORDERED.
Commissioner Ahearne's additional views are attached.
$ ga are For $he Commission 4$
47 5
m 1.'-
(d M 2 '.,
/
S Til-lL A i* g
/
't
' %..i "Il @
Secretaryo]J?CHILK SAMUEL the Commission o
g Dated at Washington,D.C.
h#dayofJune, this 1981.
.s
Commissioner Ahearne's Additional Views I concur in the result reached by the Commission.
- However, I find the description of our reasons unfortunately brief.
We rejected the claim because it is inconsistent with the NRC regu-latory philosophy as well as the-law.
Within the regulatory framework flowing from the Atomic Energy Act and other applicable statutes, the regulated industry (i.e.,
the licensee, the vendor, and the architect-engineer) bears the primary responsibility for protecting the general public from.the health, safety, and environmental risks pcsed by the generation of electricity from nuclear power.
The industry must
. take the initiative to develop safe nuclear plants, to monitor them for sufficiency, and to evaluate the need for change.
It is best equipped with the resources and detailed knowledge of particular equipment,-syhte$s,- and procedur.es. to accomplish this task.
The Federal government cannot invest enough resources into the review, inspection, and operation of each nuclear power plant to develop the level of knowledge of individual plants possessed by the licensees.
The Nuclear Regulatory Commission has a statutory responsi-bility for prescribing the minimum standards for assuring ine adequate protection of public health and safety.
Through licensing and inspection, the Commission's function is to ensure that the industry meets these threshold standards.
However, NRC's approval of a licensee as meeting these requirements at one time does not absolve the industry of its independent obligation to operate its
m 2
equipment in a manner to protect the public.
NRC licensing and
. inspection reviews cannot be and are not intended to be all-encompassing.
As is well known to NRC licensees, NRC programs are based on a sampling and do not supplant. reviews by the regulated sector.
When violations of regulations occur, the NRC imposes penalties.
But this is after the violation has occurred and been found.1/
However, the Commission expects nuclear power plant licensees, and the-suppliers and architect-engineers with whom they contract, through their own compre-hensive riviews to assure or verify independently the adequacy of a plant.'s design, construction, and operation, and to monitor data respecting the plant's operation to detect the need for corrective measures.
Chairman Hendrie-agrees-with.these view.s.
1'/
It may be noted that compliance with NRC requirements could have prevented the accident's serious consequences.
Follow-ing the review of the accidenc, Metropolitan Edison was cited for and chose not to contest violations of N"C require-ments.
In particular, Metropolitan Edison operating personnel had become accustomed to a leaking pilot-operated relief valve prior to the accident.
During the accident this led them to disbelieve indications that the pilot-operated relief valve was stuck open and a loss of coolant accident was in progress.
e
.