OPERATING DATA REPORT 50-333 DOCKET NO.
DATE JUNE 1981 COMPLETED BY E. MFE T TELEPil0NE (315) 142-3840 OPERATING STATUS Notes
- 1. Unit Name:
FITZPATRICK 810501-810531
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWI):
2436 883
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
821 830
- 6. Maximum Dependable Capacity (Cross MWe):
810
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report, Gise Reasons:
NONE
- 9. Power Level To Which Restricted,If Any(Net MWe):
NONE
- 10. Reasons For Restrictions,if Any:
This Month Yr to Date Cumulative 744 3623 51240
- 11. Ilours In Reporting Period
- 12. Number Of flours Reactor Was Critical 653.7 1174.9 16088.9
- 13. Reactor Reser e Shutdown flours 0
0 0
- 14. Ilours Generator On Line 639 3113.3 35016.1
- 15. Unit Rewrve Shutdown llours 0
0 0
- 16. Gross Thennal Energy Generated (MWil) 1462944 7251312 71434906
- 17. Gross Electrical Energy Generated (MWil) 504350 2527660 24157170
- 18. Net Electrical Energy Generated (MWII) 489275 2449465 21574545 85.9%
85.9%
68.3%
- 19. Unit Service Factor 20.' Unit Availability Factor 85.9%
85.9%
68.3%
- 21. Unit Capacity Factor (Using MDC Net) 81.2%
89.5%
61.05 80.1%
82.3%
56.0%
- 22. Unit Capacity Factor (Using DER Net).
- 23. Unit Forced Outage Rate 14.1%
14.1%
17.9%
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Eacht:
Refueling and maintenance outare scheduled for October 1981 for a period of 110 days.
25, if Shut Down At End Of Report Period Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIA L CRITICA LITY INITIAL ELECTRICITY COMMERCI AL OPER ATION 8106k003
' AVERAGE DAILY UNIT P0hER LEVEL DOCKET NO.
50-333 UNIT JAFilPP DATE JUllE 1981 C0\\lPl.E1ED sy E._3HFJJit_
T ELEl'Il0NE
- (315) 342-384c MONDI MAY'1981 DAY AVER AGE DAILY POWER LEVEL DAY AVERAGE DAILY POWLH LEVEL (MWe Net)
(MWe. Net) t-683 37 Bin 2
0 is 800 0
810 3
3, 4
0 20 800 5
0 2:
807 6
265 22 807 701 808 7
23 742 614 24 733 25 757 804 800 to 26 810 27 793 809 793 12 28 809 794 13 29 812 649 34 3o 809 697 is 3:
811 16
SUMMARY
Unit operated at near full rated thermal power for this reporting period with one chutdown on May 1, 1981 for drywell leakage and -a reduction of: power on May 24, 1981 for Rod Sequence Exchange.
i
?-
s 6
- %s r p 5
4
.t
~ ~ - -.
^ ^ ^
4i1 I
DOCKETNO. 50-333 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME JAFrIPP DATE.IllfJE 1081
~
COMPLETED BY E.
ZUFELT l
REPORTMONm MAY 1981 TELEPHONE l315) 342--3640 l-l t
W O
C
.! E
$.M t.icensee
,E g D,
Cause & Currective
.{
g{
N..
Date i
E?
.2 s &
Event p
Action to f.
$5 5
j;5g Repor a mV Prevent Recurrence il 6
i:
I; C
5 810501 F
105 A
2 NA SF VALVEX-Drywell Leakage, Replaced Packing on 10-A0V-68A 6
810524 S.
O H
4 NA NA NA Power Reduced for Control Red Sequence Exchange.
'l s
2 3
4 F: Forted Reamn:
Method:
Exhibit G Instructuns S. Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data O
B Maintenance of Test 2-Manual Scram-Entry Sheets for lxensee C Refueling 3 Automatic Scram.
Event Repura (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161) l{
E-Operain Training & License Examination F-Administrative 5
G Operation 41 Errut (Explaint Exhibit 1 - Same Source il Other (Explain)
+
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT NARRATIVE
SUMMARY
OF OPERATING EXPERIENCES MAY 1981 On May 1, 1981, the FitzPatrick Plant initiated a normal shutdown at 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> for unidentified drywell leakage.
Upon drywell entry, valve 10-A0V-68A was found to have a packing leak which was then repaired.
The unit was returned to service at approximately 0800 on May 6, 1981.
Power was increased at the pre-conditioning rate and the unit operated at near full-rated thermal power for the remainder of the month except for a slight reduction in power on May 24, 1981 for control rod sequence exchange, f
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL 8 MECHANICAL MAINTENANCE
SUMMARY
MAY 1981 DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T
T 4/29 27 9594 Visual Flange Bolts Loose Retorqued 6
P-llB 5/4 03 12124 OPS SOV's 121 & 122 Turned Valves Around 1
HCU 38-27 Reversed - 1800 5/4 03 12123 OPS Scram Outlet Valve Repositioned Switch Actuator 7
HCU 30-31 Position Switch Actuator Misaligned.
5/4 03 9449 OPS Faulty Position Replaced PIP 1 1/2 CRD 34-47 Indication Probe 5/5 03 12142 OPS Air Leak on Pilot Tightened Bonnet Screws 2
HCU 22-07 Solencid Valve 5/4
'r 0 9444 OPS Low 011 Level No Action - Oil had Migrated to RWC-2 Visual Evaporator - Normal Cperations Reclaimed Oil 1
5/4 10 94h1 OPS Vent Line to LPCI Replaced Disc, Sten, Bonnett on Vent Line Keep Full Level Switch Isolation Valve 6
Obstructed - Disc on Isolation Valve Dis-connected From Stem 5/4 10 12109 Drywell Packing Blown Out Repacked Valve 34 A0V-68A Leak Rate 5/4 29 9731 OPS Plugged Silencer on Replaced Throttle Valve &
AOV-66C Slow Close Throttle Silencer 2
Valve
,-----r
POWER AUTHORITY uF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL 3 MECHANICAL MAINTENANCE
SUMMARY
MAY 1981 ST#
DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T
5/13 71 9925 Visual Acid Residue -
Cleaned, Neutralized & Protected 2
LPCI B Batt Corrosion on Terminals 5/22 88 10033 OPS Defective Limit Switch Replaced Switch 10 1/2 CR-1 5/4 03 2559 OPS Normal Failure / Wear Replaced Control Rod Drive 253 CRD 38-27 O
O G
.,-_m,_.,--
O POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE SUV. MARY MAY 1981 I&C WORK REQUEST #
CAUS~ Oc RESULTS O=
ACTION TAKEN REPAIR OATE SYSTEM COMPONEN' #
MALFUNCTION MALFUNCTION PR E
T 5/7/81 02 9921 OPS Loose False te=p.
Tight,ned 02 TR 165 conne tion indication connections 5
checked calib.
5/1/o1 02-3 903o OFS Blocxing necorder motor Acjustec 02-3-LR-96 resistor out of continuoesly blocking adjustment circuit 3
' runs 5/10/01 03 10071 OPS broken Colc Alarm relays hepairec Rod Drift Alarm solder not operable solder connect'.on connection 24 5/2/81 07 12119 OPS Test rate too Alarm pt.& trip Performed APRM B fast pt. too close applicable por-torether tions of TXP7.6 1
5/1/81 07 12106 1&C Age /Use Possible Replaced SRM D HVPS erroneous indication 7
5/6/61 14 12144 OPS Age Dic not Acjustec gain 14 LS 20 A&B indicate dry condition 6
5/2/61 27 9598 OPS Possible leak Low pressure Repressurized, X-104C, X-10i5 in penetration tested, found l
no laak 8
5/4/81 29 12128 OPS Replacement of Slow c1csure Adjusted rate 29 AOV 66C vent filter was too fast to 5,8 sec.
~
4 5/5/61 29 19902 OPS Age Fast closure Adjusted for 29 AOV 50B was too slow required time interval 4
i
-... ~.
- - - -