Monthly Operating Rept for May 1981
ML20004D855
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 06/04/1981
From: Zufelt E
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
Shared Package
ML20004D854 List:
References
NUDOCS 8106100231
Download: ML20004D855 (7)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _

OPERATING DATA REPORT 50-333 DOCKET NO.

DATE JUNE 1981 COMPLETED BY E. MFE T TELEPil0NE (315) 142-3840 OPERATING STATUS Notes

1. Unit Name:

FITZPATRICK 810501-810531

2. Reporting Period:
3. Licensed Thermal Power (MWI):

2436 883

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):

821 830

6. Maximum Dependable Capacity (Cross MWe):

810

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report, Gise Reasons:

NONE

9. Power Level To Which Restricted,If Any(Net MWe):

NONE

10. Reasons For Restrictions,if Any:

This Month Yr to Date Cumulative 744 3623 51240

11. Ilours In Reporting Period
12. Number Of flours Reactor Was Critical 653.7 1174.9 16088.9
13. Reactor Reser e Shutdown flours 0

0 0

14. Ilours Generator On Line 639 3113.3 35016.1
15. Unit Rewrve Shutdown llours 0

0 0

16. Gross Thennal Energy Generated (MWil) 1462944 7251312 71434906
17. Gross Electrical Energy Generated (MWil) 504350 2527660 24157170
18. Net Electrical Energy Generated (MWII) 489275 2449465 21574545 85.9%

85.9%

68.3%

19. Unit Service Factor 20.' Unit Availability Factor 85.9%

85.9%

68.3%

21. Unit Capacity Factor (Using MDC Net) 81.2%

89.5%

61.05 80.1%

82.3%

56.0%

22. Unit Capacity Factor (Using DER Net).
23. Unit Forced Outage Rate 14.1%

14.1%

17.9%

24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Eacht:

Refueling and maintenance outare scheduled for October 1981 for a period of 110 days.

25, if Shut Down At End Of Report Period Estimated Date of Startup:

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achiesed INITIA L CRITICA LITY INITIAL ELECTRICITY COMMERCI AL OPER ATION 8106k003

' AVERAGE DAILY UNIT P0hER LEVEL DOCKET NO.

50-333 UNIT JAFilPP DATE JUllE 1981 C0\\lPl.E1ED sy E._3HFJJit_

T ELEl'Il0NE

- (315) 342-384c MONDI MAY'1981 DAY AVER AGE DAILY POWER LEVEL DAY AVERAGE DAILY POWLH LEVEL (MWe Net)

(MWe. Net) t-683 37 Bin 2

0 is 800 0

810 3

3, 4

0 20 800 5

0 2:

807 6

265 22 807 701 808 7

23 742 614 24 733 25 757 804 800 to 26 810 27 793 809 793 12 28 809 794 13 29 812 649 34 3o 809 697 is 3:

811 16

SUMMARY

Unit operated at near full rated thermal power for this reporting period with one chutdown on May 1, 1981 for drywell leakage and -a reduction of: power on May 24, 1981 for Rod Sequence Exchange.

i

?-

s 6

  • %s r p 5

4

.t

~ ~ - -.

^ ^ ^

4i1 I

DOCKETNO. 50-333 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME JAFrIPP DATE.IllfJE 1081

~

COMPLETED BY E.

ZUFELT l

REPORTMONm MAY 1981 TELEPHONE l315) 342--3640 l-l t

W O

C

.! E

$.M t.icensee

,E g D,

Cause & Currective

.{

g{

N..

Date i

E?

.2 s &

Event p

Action to f.

$5 5

j;5g Repor a mV Prevent Recurrence il 6

i:

I; C

5 810501 F

105 A

2 NA SF VALVEX-Drywell Leakage, Replaced Packing on 10-A0V-68A 6

810524 S.

O H

4 NA NA NA Power Reduced for Control Red Sequence Exchange.

'l s

2 3

4 F: Forted Reamn:

Method:

Exhibit G Instructuns S. Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data O

B Maintenance of Test 2-Manual Scram-Entry Sheets for lxensee C Refueling 3 Automatic Scram.

Event Repura (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161) l{

E-Operain Training & License Examination F-Administrative 5

G Operation 41 Errut (Explaint Exhibit 1 - Same Source il Other (Explain)

+

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT NARRATIVE

SUMMARY

OF OPERATING EXPERIENCES MAY 1981 On May 1, 1981, the FitzPatrick Plant initiated a normal shutdown at 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> for unidentified drywell leakage.

Upon drywell entry, valve 10-A0V-68A was found to have a packing leak which was then repaired.

The unit was returned to service at approximately 0800 on May 6, 1981.

Power was increased at the pre-conditioning rate and the unit operated at near full-rated thermal power for the remainder of the month except for a slight reduction in power on May 24, 1981 for control rod sequence exchange, f

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL 8 MECHANICAL MAINTENANCE

SUMMARY

MAY 1981 DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T

T 4/29 27 9594 Visual Flange Bolts Loose Retorqued 6

P-llB 5/4 03 12124 OPS SOV's 121 & 122 Turned Valves Around 1

HCU 38-27 Reversed - 1800 5/4 03 12123 OPS Scram Outlet Valve Repositioned Switch Actuator 7

HCU 30-31 Position Switch Actuator Misaligned.

5/4 03 9449 OPS Faulty Position Replaced PIP 1 1/2 CRD 34-47 Indication Probe 5/5 03 12142 OPS Air Leak on Pilot Tightened Bonnet Screws 2

HCU 22-07 Solencid Valve 5/4

'r 0 9444 OPS Low 011 Level No Action - Oil had Migrated to RWC-2 Visual Evaporator - Normal Cperations Reclaimed Oil 1

5/4 10 94h1 OPS Vent Line to LPCI Replaced Disc, Sten, Bonnett on Vent Line Keep Full Level Switch Isolation Valve 6

Obstructed - Disc on Isolation Valve Dis-connected From Stem 5/4 10 12109 Drywell Packing Blown Out Repacked Valve 34 A0V-68A Leak Rate 5/4 29 9731 OPS Plugged Silencer on Replaced Throttle Valve &

AOV-66C Slow Close Throttle Silencer 2

Valve

,-----r

POWER AUTHORITY uF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL 3 MECHANICAL MAINTENANCE

SUMMARY

MAY 1981 ST#

DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T

5/13 71 9925 Visual Acid Residue -

Cleaned, Neutralized & Protected 2

LPCI B Batt Corrosion on Terminals 5/22 88 10033 OPS Defective Limit Switch Replaced Switch 10 1/2 CR-1 5/4 03 2559 OPS Normal Failure / Wear Replaced Control Rod Drive 253 CRD 38-27 O

O G

.,-_m,_.,--

O POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE SUV. MARY MAY 1981 I&C WORK REQUEST #

CAUS~ Oc RESULTS O=

ACTION TAKEN REPAIR OATE SYSTEM COMPONEN' #

MALFUNCTION MALFUNCTION PR E

T 5/7/81 02 9921 OPS Loose False te=p.

Tight,ned 02 TR 165 conne tion indication connections 5

checked calib.

5/1/o1 02-3 903o OFS Blocxing necorder motor Acjustec 02-3-LR-96 resistor out of continuoesly blocking adjustment circuit 3

' runs 5/10/01 03 10071 OPS broken Colc Alarm relays hepairec Rod Drift Alarm solder not operable solder connect'.on connection 24 5/2/81 07 12119 OPS Test rate too Alarm pt.& trip Performed APRM B fast pt. too close applicable por-torether tions of TXP7.6 1

5/1/81 07 12106 1&C Age /Use Possible Replaced SRM D HVPS erroneous indication 7

5/6/61 14 12144 OPS Age Dic not Acjustec gain 14 LS 20 A&B indicate dry condition 6

5/2/61 27 9598 OPS Possible leak Low pressure Repressurized, X-104C, X-10i5 in penetration tested, found l

no laak 8

5/4/81 29 12128 OPS Replacement of Slow c1csure Adjusted rate 29 AOV 66C vent filter was too fast to 5,8 sec.

~

4 5/5/61 29 19902 OPS Age Fast closure Adjusted for 29 AOV 50B was too slow required time interval 4

i

-... ~.

- - - -